Investment Opportunities & Business Ideas in Nigeria, West Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Cold Storage
Cold Storage

Fresh fruit and vegetables, packaged meat has to be declared with a `use by` date. The maintenance of the cold chain is also one of the main principle...

Capacity :

Fruits, Vegetables and Meat Store: 2500 MT

Plant and Machinery cost:

Rs 67 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs 309 lakhs

Cost of Project :

30900000

Production of Epoxy Resins: An Investment Opportunity.
Production of Epoxy Resins: An Investment Opportunity.

Production of Epoxy Resins: An Investment Opportunity. Application (Paints & Coatings, Adhesives & Sealants, Composites), End-Use Industry (Building...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Straw Board from Rice Husk
Straw Board from Rice Husk

Strawboard contains few impurities and has good permanence. It is used for boxes, crates, egg cartons, and packing partitions. A thicker board made fr...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Automobile Gaskets
Automobile Gaskets

Gaskets are the components used in vehicles to prevent fluid and gas leakage. They fill the gap between the automotive components thus ensuring no lea...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Paper from Rice Husk & Wheat Husk
Paper from Rice Husk & Wheat Husk

Paper made from rice and wheat husk is widely used for manufacture of corrugated board. It is used for packing and wrapping and in the manufacture of...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Fish and Prawn Feed
Fish and Prawn Feed

The production of fish meal from fish offal and surplus fish benefits both the national economy and the fisherman and should not be regarded as a salv...

Capacity :

Fish Feed: 30 MT/Day Prawn Feed: 30 MT/Day

Plant and Machinery cost:

84 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project : Rs 390 lakhs

Cost of Project :

39000000

Maize and It’s by Products Starch, Liquid Glucose, Dextrose, Sorbitol, Maltose, Gluten, Germ and Fiber)
Maize and It’s by Products Starch, Liquid Glucose, Dextrose, Sorbitol, Maltose, Gluten, Germ and Fiber)

Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...

Capacity :

Maize Starch: 17520 MT /Annum Sorbitol: 3000 MT/Annum Liquid Glucose: 3000 MT/ Annum Dextrose Monohydrate: 3000 MT/ Annum Dextrose Anhydrous: 1500 MT/ Annum Gluten: 4590 MT/ Annum Maltodextrin: 1500 MT/ Annum Ge

Plant and Machinery cost:

4160 lakhs

Working Capital :

-

Rate of Return (ROR):

12.00

Break Even Point (BEP):

55.00

TCI :

Cost of Project: Rs 6928 lakhs

Cost of Project :

692800000

Dairy Farming
Dairy Farming

Dairy farming is a class of agriculture for long-term production of milk, which is processed for eventual sale of a dairy product. Dairying is an impo...

Capacity :

Cow Milk (Ltrs.): 756000 Units /Annum Manure (MT): 1080 Units /Annum Calf (Nos.): 126 Units /Annum

Plant and Machinery cost:

47 lakhs

Working Capital :

-

Rate of Return (ROR):

21.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs 529 lakhs

Cost of Project :

52900000

Wall Paper Starch
Wall Paper Starch

Starches are inherently unsuitable for most applications and, therefore, must be modi?ed chemically and/or physically to enhance their positive attrib...

Capacity :

Wall Paper Starch: 32 MT /Day

Plant and Machinery cost:

Rs 52 lakhs

Working Capital :

0

Rate of Return (ROR):

29.00

Break Even Point (BEP):

72.00

TCI :

Cost of Project: Rs 367 lakhs

Cost of Project :

36700000

Project Opportunities in Production of Condoms. Latex Condom Manufacturing. How to Manufacture Condoms (Lubricated)?
Project Opportunities in Production of Condoms. Latex Condom Manufacturing. How to Manufacture Condoms (Lubricated)?

A condom is a sheath-shaped obstruction device used during sexual intercourse. It is very beneficial for reducing the chances of pregnancy. It also de...

Capacity :

116,666.7 Pcs /Day

Plant and Machinery cost:

139.00 Lakhs

Working Capital :

0

Rate of Return (ROR):

25.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project 400.00Lakhs

Cost of Project :

40000000

Hydraulic Hose  with Crimping Facility of Hose End Fittings
Hydraulic Hose with Crimping Facility of Hose End Fittings

A hose is a flexible hollow tube designed to carry fluids from one location to another. Hoses are also sometimes called pipes (the word pipe usually r...

Capacity :

1,000Pcs./Day

Plant and Machinery cost:

74 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

66.00

TCI :

Cost of Project : Rs 211 lakhs

Cost of Project :

21100000

Maize and It’s by Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)
Maize and It’s by Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)

Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total production surpassing that of wheat...

Capacity :

Maize Starch : 60MT/Day Sorbitol : 30MT/Day Liquid Glucose: 30MT/Day Dextrose Monohydrate: 30MT/Day Dextrose Anhydrous: 15MT/Day Gluten

Plant and Machinery cost:

6690 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

41.00

TCI :

Cost of Project: Rs10721 lakhs

Cost of Project :

1072100000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp