Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90000 KGS/Annum |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. It has been cultivated in several countries for a...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 177 Lakhs |
|
Cost of Project : 0 |
Tyres are ring shaped parts, either pneumatic or solid, that fit around wheels to protect them and enhance their function. Tyres are used on many type...
|
Capacity : - |
Plant and Machinery cost: 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 102 lakhs |
|
Cost of Project : 0 |
L.P.G is used mainly for cooking purposes in India. It is usually filled in small cylinder to be used in household cooking. It is also used for drying...
|
Capacity : 300000 Nos./year |
Plant and Machinery cost: 104 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 626 lakhs |
|
Cost of Project : 0 |
Glass is one of man’s most valuable and versatile materials. Glass is formed from those elements such as silicon, boron, phosphorus and arsenic that...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. It has been cultivated in several countries for a...
|
Capacity : 150 MT/Annum (Cashew Kernels), 120 MT /Annum (CNSL) |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 176 Lakhs |
|
Cost of Project : 0 |
DAIRY FARMING AND MILK PRODUCTS (Ghee, Pasturised Milk in Poly Pack), Cow Urine Processing and Packing in ½ Ltr. Glass Bottles with Biogas Plant...
|
Capacity : - |
Plant and Machinery cost: 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1665 Lakhs |
|
Cost of Project : 0 |
Sorbitol, also known as glucitol, is a sugar alcohol that the body metabolises slowly. It is obtained by reduction of glucose changing the aldehyde gr...
|
Capacity : 4500 MT/Annum |
Plant and Machinery cost: 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : 186 Lakhs |
|
Cost of Project : 0 |
Sorbitol is a water soluble polyhydric alcohol, having sweet taste and high stability besides properties of humectancy and plastisizing used in manuf...
|
Capacity : 35 MT/Day, 15 MT Sorbitol, 5 MT Maltitol, 10 MT Dextrose Anhydrous, 5 MT/Day Vitamin C |
Plant and Machinery cost: 607 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 2332 Lakhs |
|
Cost of Project : 0 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : 600 Ton/Annum |
Plant and Machinery cost: 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 276 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |