Please choose a project below related to this category.
Aluminium is a versatile material integral to modern life. The metal is found in everything from soda cans to cell phones to window frames to airplane...
|
Capacity : Aluminium Extruded Products: 1,350MT/Annum |
Plant and Machinery cost: Rs 276 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 657 lakhs |
|
Cost of Project : 65700000 |
Leggings are one of the most common bottom wears in ladies apparel-product basket. They are a type of skin-tight garment that covers the legs and may...
|
Capacity : 240,000 Pcs/Annum |
Plant and Machinery cost: 44 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: 179 lakhs |
|
Cost of Project : 17900000 |
Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from rail...
|
Capacity : Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500 MT/Annum Laminated Aluminium Foil Insulation Grade Aluminium Foil: 1,500 MT/Annum |
Plant and Machinery cost: Rs. 1340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs. 2717 lakhs |
|
Cost of Project : 271700000 |
Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from rail...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: Rs 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 312 Lakhs |
|
Cost of Project : 31200000 |
Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs 97 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.90 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 343 Lakhs |
|
Cost of Project : 34300000 |
Petroleum jelly or petrolatum was discovered as a paraffin-like material coating oil rigs. Since then, it has been used in various ointments and as a...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Egg is a highly nutritious product. Eggs are rich in protein, vitamins and minerals. The poultry sector has made tremendous progress in the last decad...
|
Capacity : 4.2MT/Day |
Plant and Machinery cost: Rs 672 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs 1044 Lakhs |
|
Cost of Project : 104400000 |
The aluminium aerosol can has been one of the most popular packaging materials for cosmetics, pharmaceutical and household items for decades. In addit...
|
Capacity : Aerosol Cans (200 ml Size):72000 Nos./Day |
Plant and Machinery cost: Rs 182 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 55.46 |
TCI : Cost of Project:Rs 772 Lakhs |
|
Cost of Project : 77200000 |
Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of oi...
|
Capacity : Reclaimed Engine Oil :5000 Litres/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project:Rs 161 Lakhs |
|
Cost of Project : 16100000 |
Egg is a highly nutritious product. Eggs are rich in protein, vitamins and minerals. The poultry sector has made tremendous progress in the last decad...
|
Capacity : 4.2MT/Day |
Plant and Machinery cost: Rs 672 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project:Rs 1044 Lakhs |
|
Cost of Project : 104400000 |
Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chemical formula as other...
|
Capacity : Calcium Carbonate (Precipitated):24 MT/Day •Calcium Carbonate (Activated):6 MT/Day |
Plant and Machinery cost: Rs 820 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 1310 Lakhs |
|
Cost of Project : 13100000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |