Please choose a project below related to this category.
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67 to 72% Fe an...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
A safari park, sometimes known as a wildlife park is a zoo like commercial tourist attraction where visitors’ car drive in their own vehicles or ride...
|
Capacity : Visitors 6000 Nos./Day |
Plant and Machinery cost: 1099 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 49486 Lakhs |
|
Cost of Project : 0 |
Steel is said to be the backbone of any national economy, because most of industries greatly depend on the use of iron and steel for structural purpos...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 392 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 675 Lakhs |
|
Cost of Project : 0 |
Fly Ash bricks are alternative to burnt clay bricks in the construction sector in India. Fly ash bricks are an environment friendly cost saving buildi...
|
Capacity : 12000000 Nos./Annum |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 409 Lakhs |
|
Cost of Project : 0 |
Butt welded steel pipe fittings are extensively used in a piping system to change direction or function which is mechanically used to the system. The...
|
Capacity : 1500 MT Steel Fittings & Flanges/Annum |
Plant and Machinery cost: 705 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 1178 Lakhs |
|
Cost of Project : 0 |
Autoclaved Aerated Concrete (AAC) is a non combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 M3/Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 0 |
Engine oil, Transformer oil and hydraulic oil all are special grade petroleum oils, which had different specific gravity and viscosity. When these spe...
|
Capacity : - |
Plant and Machinery cost: 103 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 303 Lakhs |
|
Cost of Project : 0 |
Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one...
|
Capacity : 1800000 Nos. Cement Bags (50 Kg. each) |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
The aluminium industry can be categorized into two principal segments. The key segment is the production of primary aluminium by integrated producers...
|
Capacity : 25000 MT/Annum |
Plant and Machinery cost: 280 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2815 Lakhs |
|
Cost of Project : 0 |
Asphalt is a humid, black and extremely thick liquid or semi solid that exists in most crude petroleum and also in a few natural deposits. Asphalt con...
|
Capacity : 384000 MT/Annum Asphalt Mix |
Plant and Machinery cost: 121 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 26.00 |
TCI : 565 Lakhs |
|
Cost of Project : 0 |