Please choose a project below related to this category.
Benzoic Acid Production Business. Profitable Business Ideas in Chemical Industry Benzoic acid, C6H5COOH, is a colourless crystalline solid and the si...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Helmet Manufacturing Industry. Production of Bike Helmets. Profitable Safety Helmet Industry Bike Helmets are useful as safety gear to prevent or min...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Tyres are one of the most important compone...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aluminium Wire & Cables Manufacturing Industry. Start an Electric Wire & Cable Business Aluminium (Al) is one of the most common metal elements. In f...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
T-Shirt Manufacturing Business. How to Start a Readymade Garments Business. Business Opportunities in Apparel or Clothing Industry T-shirts are not ju...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aerosol Cans Production for Aerosol Spray. Aerosol Packaging Industry. Trends and Opportunities in Packaging Industry Aerosols are homogeneous, cryst...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The tea-plant, in its natural state, grows into a small or medium-sized tree, but in commercial plantations it is pruned and trained to form a many-br...
|
Capacity : Fermented & PF Tea: 1000 Kgs./day Fermented & Green Tea: 1000 Kgs./day Green & PF Tea: 1000 Kgs./day Brick & PF Tea: 1000 Kgs./day |
Plant and Machinery cost: Rs 33 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 215 lakhs |
|
Cost of Project : 21500000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : IV Fluids (500 ml Bottle): 40000 Pcs/day |
Plant and Machinery cost: Rs 2734 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 3712 lakhs |
|
Cost of Project : 371200000 |
Moringa or drum sticks is among the well-known vegetables being used in our food during its availability. It is commonly known as “Sejana”. Drumstick...
|
Capacity : Drumstick (Moringa Oleifere) Powder: 2000 Kgs./day |
Plant and Machinery cost: Rs 38 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project: Rs 92 lakhs |
|
Cost of Project : 9200000 |
Disposable Syringes are being used by doctors to inject medicines through intravenous or intramuscular ways for the treatment of diseases & also by re...
|
Capacity : Disposable Plastic Syringes 2 ml Size: 60 Boxes/Day Disposable Plastic Syringes 5 ml Size: 60 Boxes/Day Disposable Plastic Syringes 10 ml Size: 40 Boxes/Day |
Plant and Machinery cost: Rs. 137 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 13.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 307 lakhs |
|
Cost of Project : 30700000 |
Paper cores are strong cardboard tubes or cylinders which are used in fabric, adhesive, electrical, paper product and converting industries as a sturd...
|
Capacity : Kraft Paper Core Pipe: 12 MT/day |
Plant and Machinery cost: Rs 49 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 303 lakhs |
|
Cost of Project : 30300000 |
Glassware In 2017, highest demand for glassware was seen in Asia Pacific. Riding on the back of the factors such as rapid development of easy to carr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |