Please choose a project below related to this category.
Urethane structural adhesives systems are relatively new comers to the market place. However, in the area of fiberglass reinforced plastic, urethane s...
|
Capacity : 400 Kg./day |
Plant and Machinery cost: 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 62 Lakhs |
|
Cost of Project : 0 |
Fish is used as a source of food either in raw or dry state. It has protein which is amino acids. Another means of utilization of fish is the manufact...
|
Capacity : 1 MT/day Fish Oil. 2.3 MT/day Fish Meal. |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 219 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
Hot melt adhesives are the most common type of adhesives used to bind the material together with a very high percentage of strength. These adhesives a...
|
Capacity : 900 Kg./day |
Plant and Machinery cost: 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 235 Lakhs |
|
Cost of Project : 0 |
The Acrylics are a group of thermoplastic resins formed by polymerization of esters or amides of acrylic acid. Now-a-days they are being used as adhes...
|
Capacity : 500 Kg./day |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 106 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 6000 Sq. Mt. |
Plant and Machinery cost: Rs. 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs. 87 Lakhs |
|
Cost of Project : 0 |
Cement industry is one of the most important basic industries on which depends the economic health of a developing country. In fact the important indi...
|
Capacity : 5000 MT/Day |
Plant and Machinery cost: 105 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 175 Crores |
|
Cost of Project : 1750000000 |
For a building being constructed the one and only thing which is to be considered is its strength of bearing load of both environmental artificial. Bu...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 54.00 |
TCI : - |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
In India three types of decorative and industrial laminated sheets are being manufactured usually being phenol formaldehyde or melamine formaldehyde...
|
Capacity : 50,00,000 Sq. Mt / Annum |
Plant and Machinery cost: 860 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 1484 Lakhs |
|
Cost of Project : 0 |
Solvent cement refers to any substance inorganic or organic synthetic that is capable of bonding other substances together by surface attachment. Pol...
|
Capacity : 500 Kg. / Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 104 Lakhs |
|
Cost of Project : 0 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |