Please choose a project below related to this category.
Lubricants are the products used for the lubrication of sliding or rolling elements. Product similar to these with respect to composition, manufactur...
|
Capacity : 600 Kg./day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 125 Lakhs |
|
Cost of Project : 0 |
Hot melt adhesives are the most common type of adhesives used to bind the material together with a very high percentage of strength. These adhesives a...
|
Capacity : 900 Kg./day |
Plant and Machinery cost: 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 235 Lakhs |
|
Cost of Project : 0 |
Liquid Paraffins are the most commonly used compound in pharmaceuticals and medical practice etc. Now-a-days these are being employed as the major ra...
|
Capacity : 150 K Ltr/day H.L.P. & 140 K Ltr/day Isoparaffin |
Plant and Machinery cost: 427 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 972 Lakhs |
|
Cost of Project : 0 |
Tamarind is a fruit of highly soured nature having big trees all over India. Tamarind cultivation is used for the extraction of its fruit juice and p...
|
Capacity : 0.50 MT/day |
Plant and Machinery cost: 11 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 74 Lakhs |
|
Cost of Project : 0 |
Now-a-days people are quite justified in paying unusual attention to the choice of the oils for dressing the hairs for toileting and before bathing. A...
|
Capacity : 147 Kg./day |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 264 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 100 MT/day |
Plant and Machinery cost: Rs. 240 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs. 1279 Lakhs |
|
Cost of Project : 0 |
A coaxial Cable is one that consists of two conductors that share a common axis. The inner conductor is typically a straight wire, either solid or str...
|
Capacity : 20000 Meters/Day |
Plant and Machinery cost: 1 Crore |
|
Working Capital : 2 Crore |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 4 Crore |
|
Cost of Project : 0 |
Infusion therapy as a basic toll of modern medical care enables the physician to restore and stabilize homeostasis states quickly and completely. In n...
|
Capacity : 30000 Bottles/Day |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 65.00 |
|
Break Even Point (BEP): 42.00 |
TCI : - |
|
Cost of Project : 0 |
These dyes are so powerful that very small amounts, comparatively, are needed to colour a large amount of material. The dyestuff should never be shake...
|
Capacity : 1500 MT/Annum |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : 8 Lakhs |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : - |
|
Cost of Project : 0 |
A perfume can be defined as a blend of odorous materials of natural and synthetic origin which gives a pleasant odour impression. The art of perfumery...
|
Capacity : 10 kg/Day |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 51 Lakhs |
|
Cost of Project : 0 |
Forging is the working of metal into a useful shape by hammering or pressing. Most forging operations are carried hot, but certain metals may be cold...
|
Capacity : 25000 Bearing Ring/Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 2.15 Crore |
|
Cost of Project : 0 |
Friction materials like brake linings clutch facing and transformer band are bonded largely with phenolic resins. Automotive applications are the larg...
|
Capacity : 1000 kgs/Day |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : 15 Lakhs |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 48 Lakhs |
|
Cost of Project : 0 |