Please choose a project below related to this category.
Organic farming is primarily knowledge intensive whereas conventional farming is more chemical and capital intensive. This requires an active system t...
|
Capacity : 3122 MT (Organic Production/Annum, Organic Basmati Rice, Wheat, Barley) |
Plant and Machinery cost: 40 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 22.45 |
|
Break Even Point (BEP): 57.72 |
TCI : Cost of Project : 271 lakh |
|
Cost of Project : 27100000 |
SECTOR PROFILE Floriculture, or flower farming, is a discipline of horticulture concerned with the cultivation of flowering and ornamental plants for...
|
Capacity : 10000 No.s/ day |
Plant and Machinery cost: 16 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 177 Lakhs |
|
Cost of Project : 0 |
With a rapidly growing economy and rising population, India is the fifth largest and one of the fastest growing petroleum oil consumers in the world....
|
Capacity : Cultivation Area 1000 Hectares,Avg. Seed Production 4 MT/Hectares |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 90.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 393 Lakhs |
|
Cost of Project : 0 |
Oil Palm cultivation is rapidly expanding within the tropical zone and South-East Asia is the leading producer of palm oil. Palm oil comes from trees...
|
Capacity : 1000 MT Fresh Fruits Bunch/Annum After 3 year. |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 118 Lakhs |
|
Cost of Project : 0 |
Rajnigandha a 16-120 cm high with stout tuberous rootstock, leaves basal, liner those on the stem much shorter, flower tunnel shaped, waxy white fra...
|
Capacity : 33.33 Kgs. Rajnigandha Oil/Day, 400 ML Rose Oil/Day |
Plant and Machinery cost: 27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 108 Lakhs |
|
Cost of Project : 0 |
Cotton seeds are one of the oil producing seeds. The cotton seed cake is the residue left after the extraction of cotton seed oil from the seeds. Thi...
|
Capacity : 3000 MT / Annum |
Plant and Machinery cost: 30 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project 128 Lakhs |
|
Cost of Project : 0 |
We all are familiar of the fruit called Amla (Gooseberry). It is very commonly found in India, Ceylon, Malaya and China. It is very important fru...
|
Capacity : 20,000 Kg. / Annum |
Plant and Machinery cost: 2 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 10 Lakhs |
|
Cost of Project : 0 |
It is a distillation in which rectification is used to obtain product as nearly pure as possible. Fractionation is carried out at reduced pressure and...
|
Capacity : 100 KGS/day |
Plant and Machinery cost: Rs. 118 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 295 lakhs |
|
Cost of Project : 0 |
There are more than 5000 verities of rose in India of which only a few yield essential oils. The verities that are grown in India for obtaining essent...
|
Capacity : Flower Yield 4000 Kgs/Ha/Annum, Flower Yield 60 Kgs/Day. Avg., 75 Kgs Rose Oil/Annum, 25000 Ltrs. Rose Water/Annum |
Plant and Machinery cost: Rs. 30 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 98 lakhs |
|
Cost of Project : 0 |
There are several plants, which when coupled with a health life style, can be of preventive and therapeutic use in susceptible and high risk groups of...
|
Capacity : 8 Tons Aloe Vera Leaf / Acre |
Plant and Machinery cost: Rs. 36 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs. 149 lakhs |
|
Cost of Project : 0 |
Green houses are frequently used to control or modify the exciting environmental factor, which effects the plant growth. A green house is a structure...
|
Capacity : 10000 NOS./day |
Plant and Machinery cost: Rs. 139 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Rs. 462 lakhs |
|
Cost of Project : 0 |
Contract farming is most commonly practiced by food processing firms. These firms have an interest in keeping raw material inflows at a stable level,...
|
Capacity : 75000 Nos. Bottle Fruit Juice/Day |
Plant and Machinery cost: 144 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 55.00 |
|
Break Even Point (BEP): 22.00 |
TCI : 2876 Lakhs |
|
Cost of Project : 0 |