The steel industry in India has been moving from strength to strength. India has emerged as the fourth largest producer of steel in the world and the second largest producer of crude steel. Steel production reached 28.52 million tonne (MT). India’s steel industry has some advantages i.e. sufficient availability of raw materials, particularly quality iron-ore, a rich skill base and an expanding market.
Long products constitute almost half of the annual steel production, which stands at 53 million tonnes presently. Industry estimates show that the construction sector alone consumes close to 45 per cent of the total long products output. Stainless steel accounts for only 3 per cent of the country’s total steel production and about 70 per cent finds application in kitchenware and the rest in industries. The demand for flat steel products will be strong, with rising production of automobiles as automobile sales have risen an annual 15%. Steel along with iron has a weight of 3.64 per cent in the wholesale price index. The present index of basic metal and alloy recorded an 8.55% growth rate. Production of bars and rods recorded 19.67% growth rate and steel wires recorded 11.11% growth rate.India’s steel production is likely to surpass the domestic requirement by 2011-2012, easing pressure on price of the alloy. Other allied steel products are HR coils, CR coils, and HDG coil.etc. End users sector like auto, consumer durables, construction and electricity have all shown steady growth in recent years and Indian steel import figure further provides evidence of strong domestic demand.
Major players in the steel sectors are Steel Authority of India (SAIL), RINL, TataSteel, JSW Steel, Essar Steel and Bhushan Steel, Jindal Saw, JSL, Usha Martin, Uttam Galva, PSL, Ajmera Realty, etc.
India’s steel industry is the happening place in 2010 with global gins in the field showing keen interest in setting shop in India. India is poised to take a big leap in steel capacity creation. By 2015-16, it may become world’s second largest steel producer. The National Steel Policy has a target for taking steel production up to 110 MT by 2019–20. Nonetheless, with the current rate of ongoing greenfield and brownfield projects, the Ministry of Steel has projected India's steel capacity is expected to touch 124.06 MT by 2011–12. In fact, based on the status of memoranda of understanding (MoUs) signed by the private producers with the various state governments, India's steel capacity is likely to be 293 MT by 2020.
Reasons for buying our reports:
This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product
This report provides vital information on the product like its characteristics and segmentation
This report helps you market and place the product correctly by identifying the target customer group of the product
This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials
The report provides a glimpse of government regulations applicable on the industry
The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.
Our Approach:
Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.
The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players
We use reliable sources of information and databases. And information from such sources is processed by us and included in the report
Please choose a project below related to this category.
With the growth of industrial, commercial and household activities the demand of office automation, equipments and steel furniture has increased consi...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
How to Start LPG Cylinder Manufacturing Plant. Domestic and Commercial LPG Cylinders Production Project LPG Cylinder is an essential item for fil...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Fusion Bonded Epoxy Coating on TMT Bars. FBE Coating. Fusion Bond Powder Coatings. Epoxy Coated TMT Bars. Fusion bond epoxy coating, also known a...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Red Oxide Primer is specially formulated for use on both bare and rusty iron and steel. Red oxide primer is a specially formulated coating used as a b...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Ferrite magnets or ceramic magnets are the most used magnets. The applications of ferrite magnets are very broad. Ferrite magnets exhibit high resista...
|
Capacity : - |
Plant and Machinery cost: -- |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for cooking purpose. The body of LPG cylinder is deep drawn in two pieces t...
|
Capacity : LPG Cylinders (Domestic 14.2 Kgs Size): 640 Nos. /Day LPG Cylinders (Commercial 19 Kgs Size): 560 Nos. /Day |
Plant and Machinery cost: 88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 392 lakhs |
|
Cost of Project : 39200000 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for cooking purpose. The body of LPG cylinder is deep drawn in two pieces t...
|
Capacity : LPG Cylinders (Domestic 14.2 Kgs Size) 640 nos. per day LPG Cylinders (Commerical 18 Kgs Size) 560 nos. per day |
Plant and Machinery cost: 88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 391 lakhs |
|
Cost of Project : 39100000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |
Manganese is a key component in the production of steel. Although classified as a minor metal, the quantity of manganese produced worldwide each year...
|
Capacity : Manganese Metal: 15,000 MT/Annum |
Plant and Machinery cost: Rs 663 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 2553 lakhs |
|
Cost of Project : 255300000 |
High tensile wires are those which can withstand great strain without breaking or becoming deformed. High tensile wire is made with higher carbon stee...
|
Capacity : 60 MT/day |
Plant and Machinery cost: 224 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 958 lakhs |
|
Cost of Project : 95800000 |
Casting other than a pipe, which allows pipeline deviation, change of direction or bore. In addition flanged-sockets, flanged-spigots and collars are...
|
Capacity : Pipe Adopter:2 MT/Day •Pipe Elbow :2 MT/Day •Pipe Flange :2 MT/Day •Pipe Union : 2 MT/Day •Pipe Reducer : 2 MT/Day •Pipe Tee:2 MT/Day |
Plant and Machinery cost: Rs 254 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.67 |
|
Break Even Point (BEP): 60.85 |
TCI : Cost of Project :Rs 946 Lakhs |
|