Investment Opportunities & Business Ideas in Egypt- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Workwear, Uniform Clothing for Factory (Trousers and High- Visibility Long Sleeve Jackets)
Workwear, Uniform Clothing for Factory (Trousers and High- Visibility Long Sleeve Jackets)

A textile or cloth is a flexible woven material consisting of a network of natural or artificial fibres often referred to as thread or yarn. Yarn is p...

Capacity :

Trousers: 3,000 pcs per Day High-Visibbility Long Sleeve Jackets: 1,000 pcs per Day

Plant and Machinery cost:

136 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

66.00

TCI :

Cost of Project: 1271 Lakhs

Cost of Project :

127100000

Polyvinyl Alcohol (PVA) Manufacturing Industry
Polyvinyl Alcohol (PVA) Manufacturing Industry

Polyvinyl Alcohol (PVA) Manufacturing Industry. The Global Polyvinyl Alcohol (PVA) Market is expected to Reach USD 1.21 Billion by 2025 Polyvinyl...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Real Estate, Home Building & Construction Industry
Real Estate, Home Building & Construction Industry

Real Estate, Home Building & Construction Industry. Residential Apartment Development & Construction An apartment is a private residence in a bui...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Polylactic Acid (PLA) Production
Polylactic Acid (PLA) Production

Polylactic Acid (PLA) Production. A Biodegradable and Bioactive Polyester. Most Common Bioplastic in Today’s Use Polylactic Acid (PLA) Polylactic ac...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

HDPE and uPVC Pipes Production
HDPE and uPVC Pipes Production

HDPE and uPVC Pipes Production. Business Opportunities in Pipe Manufacturing Industry HDPE Pipe HDPE pipe is a pipe made from high-density pol...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Biodegradable Plastic Bag Manufacturing Industry
Biodegradable Plastic Bag Manufacturing Industry

Biodegradable Plastic Bag Manufacturing Industry. Production of Compostable and Biodegradable Bags from Corn Starch. Eco-Friendly Disposable Bags...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Cake & Filled Croissants Puffs Manufacturing Project
Cake & Filled Croissants Puffs Manufacturing Project

Cake & Filled Croissants Puffs Manufacturing Project. Make Profits in Bakery Industry. Start Your Own Baking Business Bakery products includes br...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Calcium Bromide Manufacturing Industry
Calcium Bromide Manufacturing Industry

Calcium Bromide Manufacturing Industry. Calcium Bromide (CaBr2) Factory. Bromine Compounds Business Ideas & Opportunities Calcium bromide (CaBr2)...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Chocolate, Toffee and Candy Manufacturing Industry
Chocolate, Toffee and Candy Manufacturing Industry

Chocolate, Toffee and Candy Manufacturing Industry. Start your own Confectionery Business Chocolate is a typically sweet, usually brown, food pre...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Tungsten Carbide Rod Manufacturing Industry
Tungsten Carbide Rod Manufacturing Industry

Tungsten Carbide Rod Manufacturing Industry. Attractive Opportunities in "Tungsten Carbide Rod Production" for Mining & Construction Industries T...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Ready Mixed Concrete. RMC Production
Ready Mixed Concrete. RMC Production

Ready Mixed Concrete. RMC Production. Ready-Mix Concrete (RMC) Manufacturing Plant. A Revolution in Production of Concrete Ready-mix concrete (RMC) i...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Calcium Bromide
Calcium Bromide

Calcium bromide is the calcium salt of hydrobromic acid with the chemical formula of CaBr2. It is concentrated hygroscopic powder which will absorb wa...

Capacity :

Calcium Bromide (Liquid 50%): 10000 MT/Annum

Plant and Machinery cost:

Rs. 247 lakhs

Working Capital :

-

Rate of Return (ROR):

29.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project: Rs. 1337lakhs

Cost of Project :

133700000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp