Please choose a project below related to this category.
Business Opportunities in Tourism and Hospitality Sector. Setting Up a 5 Star Hotel. Rising Opportunities in India's Hospitality Industry Hotels...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Essential Oils Extraction and Manufacturing Industry. Jasmine and Tuberose Oil Extraction Business. Essential Oils from Flower Crops An essential...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...
|
Capacity : Gypsum Plaster Board: 13333 Sq.mt./Day |
Plant and Machinery cost: Rs. 476 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Cost of Project: Rs 3394 lakhs |
|
Cost of Project : 339400000 |
Ferro Manganse in different gradesa is used in manufacturing of Welding Electrodes & also special types of stick electrodes. Low Carbon Ferro Mangane...
|
Capacity : Low Carbon Ferromanganese: 50 MT/Day |
Plant and Machinery cost: Rs. 904 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs. 3615lakhs |
|
Cost of Project : 361500000 |
An optical fiber (or fiber) is a glass or plastic fiber that carries light along its length. Fiber optics is the overlap of applied science and engine...
|
Capacity : Optical Fibre Cable : 1000000 Kmtrs./Annum |
Plant and Machinery cost: Rs. 1411 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : Rs 8342 lakhs |
|
Cost of Project : 834200000 |
Automobile Silencer is a device used to reduce the noise produced by the engine. Silencer is used in automobile vehicles to reduce the noise produced...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A hexamine fuel tablet is a form of solid fuel in tablet form. The tablets burn smokelessly, have a high energy density, do not liquefy while burning...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Micropropagation is an advanced vegetative propagation technology for producing a large number of genetically superior and pathogen-free transplants i...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Winding wires are insulated with a very superior grade of PVC compound to give it the necessary electrical strength and resistance to abrasion. The co...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Copper rod is considered suitable for power and communication cables, house wire, strips for power and distribution transformers, magnet wires, etc. C...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Plastic moulding is the process of shaping plastic using a rigid frame or mould. This frame is known as Plastic Mould. The technique allows for the cr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Reclaimed rubber is cured rubber obtained through thermo-chemical process that softens and swells the rubber. The viscosity of the rubber is lessened...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |