Please choose a project below related to this category.
Production of Plastic Toothbrushes. Oral Care Products Industry A toothbrush is a dental instrument used for cleaning teeth, ideally in conjunction w...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Optical Fiber Cable (OFC) Manufacturing Industry. Production of Fiber Optic Cables. How to Start Your Own Cable Manufacturing Business An optical fib...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Grapes Packhouse for Exports. Packaging of Grapes with Cold Storage. Fruit Packaging Business Grapes are versatile fruits used in a wide range of pop...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Railway Sleepers Manufacturing Industry. Precast RCC Sleeper Production for Railway Track. Reinforced Cement Concrete (RCC) Sleepers PSC sleeper...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Goat Rearing & Breeding Business. Raising Goat for Milk and Meat Production. Commercial Goat Farming Project Rearing goats is a profitable business....
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid). Biodegradable Film Manufacturing Business - Sustainable Alternative to...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Plastic materials have made entry in every sphere of human life because of its superior characteristics such as durability, strengths, shape and molda...
|
Capacity : Bioplastic Film 25 Micron: 1,500,000 Kgs per Annum |
Plant and Machinery cost: 185 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 617 Lakhs |
|
Cost of Project : 61700000 |
Bioplastic Carry Bags and Garbage Bags Production. Biodegradable, Compostable and Eco-Friendly Carry Bags and Trash Bags Manufacturing Business P...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...
|
Capacity : Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size: 1,500 Kgs per day |
Plant and Machinery cost: 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: 396 Lakhs |
|
Cost of Project : 39600000 |
Mosquito Repellent Liquid Manufacturing Industry. Mosquito Repellent Industry. Production of Mosquito Repellent Liquidator Liquid repellents are...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PVC Conduit Pipes Manufacturing Business. Electrical PVC Pipe Production Electrical Conduit Pipe Market is projected to register a CAGR of 3.5% by 2...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Wood Plastic Composite (WPC) Manufacturing Business. Start a Plastic Wood Composite Unit. WPC Board Production Wood Plastic Composite is a hybrid...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |