Please choose a project below related to this category.
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Latex rubber thread is one of the product amongst various process obtained from Rubber Processing. It is produced by extruding compounded latex throu...
|
Capacity : 10 MT/ day |
Plant and Machinery cost: Rs.4400 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Rs.6700 Lakhs |
|
Cost of Project : 0 |
Latex foam rubber derives its physical performance properties from the vulcanization process that creates long molecular chains with strong cross lin...
|
Capacity : 1 MT/ day |
Plant and Machinery cost: Rs.80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs.343 Lakhs |
|
Cost of Project : 0 |
A gasket (correct terminology is a joint made from jointing material) is a mechanical seal which fills the space between two or more mating surfaces,...
|
Capacity : 200 kgs/ day |
Plant and Machinery cost: Rs.29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Rs.165 Lakhs |
|
Cost of Project : 0 |
The tyre industry is the largest part of the rubber manufacturing industry, infact it is so large that it is often classed as an industry in its own...
|
Capacity : 13475 Nos./ day |
Plant and Machinery cost: Rs.409 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 20.00 |
TCI : Rs.17073 Lakhs |
|
Cost of Project : 0 |
Rubber toys are one of the cheaper and best substitutes of electronic toys, plastic toy and other type of toys. Two types of hollow rubber toys of va...
|
Capacity : 500 Pcs./ day |
Plant and Machinery cost: Rs.42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs.362 Lakhs |
|
Cost of Project : 0 |
A rubber mat is a generic term for a piece of flat rubber, generally placed on a floor or other flat surface, which serves a range of purposes includ...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: Rs.27 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs.389 Lakhs |
|
Cost of Project : 0 |
Compounding, a term that has evolved within the tire and rubber industry, is the materials science of modifying a rubber or elastomeric or a blend of...
|
Capacity : 32 MT/ day |
Plant and Machinery cost: Rs.52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 22.00 |
TCI : Rs.3032 Lakhs |
|
Cost of Project : 0 |
Advances in tyre materials, tyre constructions and tyre manufacturing technology have led to new types of products and the development of new market s...
|
Capacity : 1600 Nos./ day |
Plant and Machinery cost: Rs.204 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 21.00 |
TCI : Rs.8174 Lakhs |
|
Cost of Project : 0 |
Guar gum, a natural gum, is an edible thickening agent extracted from the guar bean. Guar beans have a large endosperm which contains galactomannan g...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.213 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost Of Project : Rs.832 Lakhs |
|
Cost of Project : 83200000 |
Wood plastic composite is good to solve the problem arises in the environment as there is scope of use of agricultural waste product to make WPC. One...
|
Capacity : 3840 Kgs./Day |
Plant and Machinery cost: Rs.75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost Of Project : Rs.289 Lakhs |
|
Cost of Project : 28900000 |
Amino acid chelates consists of a metal ion comprising iron, zinc, manganese, magnesium, copper, calcium and mixtures thereof. These cheltaes are mos...
|
Capacity : - |
Plant and Machinery cost: Rs.161 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost Of Project : Rs.502 Lakhs |
|
Cost of Project : 50200000 |