Please choose a project below related to this category.
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : - |
Plant and Machinery cost: Rs. 274 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : Rs.1330 Lakhs |
|
Cost of Project : 133000000 |
Cellular light weight concrete is also known as CLC, foamed cement, and light weight cement, world over thanks to its advantages over ordinary buildin...
|
Capacity : 50 Cu Mtr/Day |
Plant and Machinery cost: Rs.127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs.413 Lakhs |
|
Cost of Project : 41300000 |
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
Sugar cane is a C4 plant with a high rate of photosynthesis (its rate lies around 150 to 200% above the average for other plants). It is a perennial c...
|
Capacity : 45000 Ltrs/day |
Plant and Machinery cost: Rs.168 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Rs.2320 Lakhs |
|
Cost of Project : 0 |
Manganese is used in metallurgical industries in the form of ferro manganese. Ferro manganese contains about 80% Mn and 20% Fe. Generally ferro mangan...
|
Capacity : 24 MT/Day |
Plant and Machinery cost: 803 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 2695 Lakhs |
|
Cost of Project : 269500000 |
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particl...
|
Capacity : 25 Million Ltrs./Annum |
Plant and Machinery cost: Rs. 487 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : Rs. 1557 Lakhs |
|
Cost of Project : 155700000 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Particle board is a classic wood based panel, made from high quality particles of wood / bagasse. It is a low – density board with density range from...
|
Capacity : 500 Nos. / Day |
Plant and Machinery cost: Rs. 536 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 967 Lakhs |
|
Cost of Project : 96700000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Wood plastic composite products is a new type composite material booming in recent years, refers to the use of polyethylene, polypropylene and polyvi...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 382 Lakhs |
|
Cost of Project : 38200000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 347 Lakhs |
|
Cost of Project : 34700000 |