Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/Day •Micronutrients Fertilizer for Citrus: 500 Kgs/Day |
Plant and Machinery cost: Rs 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project:Rs 30 Lakhs |
|
Cost of Project : 3000000 |
A pencil is lead material enclosed in wood or put in metal holder used for drawing or writing. Pencil is a valuable item used by all levels of schools...
|
Capacity : Wooden Pencils 200 Gross/Day |
Plant and Machinery cost: Rs 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.60 |
|
Break Even Point (BEP): 71.87 |
TCI : Cost of Project : Rs 55 Lakhs |
|
Cost of Project : 5500000 |
Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from lim...
|
Capacity : Plastic Granules 4500 Kgs/Day |
Plant and Machinery cost: Rs 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 64.52 |
TCI : Cost of Project : Rs 219 Lakhs |
|
Cost of Project : 21900000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : Copper Powder:3.33 MT/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.33 |
|
Break Even Point (BEP): 63.22 |
TCI : Cost of Project:Rs 321 Lakhs |
|
Cost of Project : 32100000 |
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : Iron Ore: 800 MT/Day |
Plant and Machinery cost: Rs 779 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2485 Lakhs |
|
Cost of Project : 2485 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day |
Plant and Machinery cost: Rs 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |