Dehydrating vegetables once dehydrated, they take very little room to store. Nutrients aren’t destroyed as they are with canning. Nothing is spoiled....
|
Capacity : Dehydrated Vegetables, Mushroom & Soup: 3130 Packs/Day |
Plant and Machinery cost: Rs 102 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 394 lakhs |
|
Cost of Project : 39400000 |
Ethyl and butyl acetates are solvents used in surface coatings, inks, flavorings and pharmaceuticals, and other applications. Ethyl acetate (systemati...
|
Capacity : Ethyl Acetate: 8.3 MT/Day Butyl Acetate : 8.3 MT/Day |
Plant and Machinery cost: Rs 239 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 546 lakhs |
|
Cost of Project : 54600000 |
Curcumin is the main biologically active phytochemical compound of Turmeric. Molecular chemical formula of Curcumin: C21H20O6. The most important cons...
|
Capacity : Curcumin Powder : 25 Kgs/Day Turmeric Oil: 25 Kgs/Day Deoiled Turmeric: 440 Kgs/Day |
Plant and Machinery cost: 149 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 303 lakhs |
|
Cost of Project : 30300000 |
Invert sugar (syrup) is an edible mixture of sugars made by heating up table sugar (sucrose) with water. As invert sugar is thought to be sweeter than...
|
Capacity : Invert Sugar Syrup: 20 MT/Day |
Plant and Machinery cost: 397 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 733 lakhs |
|
Cost of Project : 73300000 |
Toughened glass is a type of soda-lime-silica glass with a sheet thickness 4-12 mm. The sheet has a central tensile stress of 500-1200 kg/cm2 and a ra...
|
Capacity : Tempered and Toughened Glass: 1280 Sq.Mt./Day |
Plant and Machinery cost: 337 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 767 lakhs |
|
Cost of Project : 76700000 |
In pharmaceutical drug delivery of solid oral dosage forms film coatings are frequently applied. The motivation for coating dosage forms range from co...
|
Capacity : Regular Film Coating Powder: 400 Kgs/Day Functional Fim Coating Powder: 400 Kgs/Day |
Plant and Machinery cost: 19 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 172 lakhs |
|
Cost of Project : 17200000 |
A razor is a bladed tool primarily used in the removal of unwanted body hair through the act of shaving. Kinds of razors include straight razors, disp...
|
Capacity : Razor Blade (Double Edge): 100,000 PKTS/Day |
Plant and Machinery cost: 681 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 1325 lakhs |
|
Cost of Project : 132500000 |
Poultry feed is food for farm poultry, including chickens, ducks, geese and other domestic birds. Healthy poultry require a sufficient amount of prote...
|
Capacity : Poultry Feed: 16 MT/Day |
Plant and Machinery cost: 43 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 244 lakhs |
|
Cost of Project : 24400000 |
The nation's competitiveness depends, in part, on the skills of tomorrow's engineers.” As the saying goes, there is need of engineering college i...
|
Capacity : Engineering College: 40 Students each Branch, 6 Branches.Total Students in 4th Year 960 Nos. |
Plant and Machinery cost: 571 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 3065 lakhs |
|
Cost of Project : 306500000 |
Zinc oxide is an inorganic compound with the formula ZnO. ZnO is a white powder that is insoluble in water, and it is widely used as an additive in nu...
|
Capacity : Zinc Oxide: 16 MT/Day |
Plant and Machinery cost: 351 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs 833 lakhs |
|
Cost of Project : 83300000 |
A cable is defined as the set of conductors, insulators, sheaths and armor protection or shielding, specifically built to carry the current both for e...
|
Capacity : Aluminium Cables and Conductors : 25 MT/Day |
Plant and Machinery cost: 376 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 1650 lakhs |
|
Cost of Project : 165000000 |
A Namkeen is seen in western culture as a type of food that is not meant to be eaten as part of the main meals of the day (breakfast, lunch, and diner...
|
Capacity : Namkeen, Bhujia, Dalmoth, Chana Chur & Khatta Meetha: 10 MT/Day |
Plant and Machinery cost: 221 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 495 lakhs |
|
Cost of Project : 49500000 |