Investment Opportunities & Business Ideas in Tanzania, East Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

DTP and Offset Printing
DTP and Offset Printing

Digital printing refers to methods of printing from a digital-based image directly to a variety of media. It usually refers to professional printing w...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Waste Plastic to Oil Conversion
Waste Plastic to Oil Conversion

Waste Plastic to Oil Conversion. Production of Oil from Waste Plastics and Polythene using Pyrolysis Process. Waste Plastic Pyrolysis Pyrolysis is...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Production of Indian Kitchen Spices
Production of Indian Kitchen Spices

Production of Indian Kitchen Spices (Turmeric Powder, Red Chilli Powder, Dhaniya Powder, Garam Masala, Sabji Masala, Popcorn Masala), Masala Powder, M...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Agriculture Storage and Warehousing with Cold Storage
Agriculture Storage and Warehousing with Cold Storage

Agriculture Storage and Warehousing with Cold Storage- India Set to see Rs. 45,000 Crores Investments in Warehousing by 2020 A warehouse describe...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

--

Cost of Project :

0

Wood Pellets Production from Sawdust
Wood Pellets Production from Sawdust

Wood Pellets Production from Sawdust. Earn Money from Wood Waste (Sawdust). Turning Sawdust into Briquettes. Wood pellets, known for generating low...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Production of Disposable Surgical and Medical Face Mask
Production of Disposable Surgical and Medical Face Mask

Production of Disposable Surgical and Medical Face Mask. Single-Use Surgical and Procedure Masks Manufacturing Project Surgical face masks are worn...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Profitable Project Investment Opportunity in Adult Pull-up Diapers Production
Profitable Project Investment Opportunity in Adult Pull-up Diapers Production

Profitable Project Investment Opportunity in Adult Pull-up Diapers Production. Adult Diapers Manufacturing Business An adult diaper is a diaper spe...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Production of PROM (Phosphate Rich Organic Manure)
Production of PROM (Phosphate Rich Organic Manure)

Production of PROM (Phosphate Rich Organic Manure): An Emerging Biofertilizer, Manufacturing of PROM Fertilizer - Toward a Sustainable Agriculture...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Apparel Manufacturing Business Opportunity.
Apparel Manufacturing Business Opportunity.

Apparel Manufacturing Business Opportunity. Readymade Garments (Jean Trousers & Shirts), Starting a Clothing Industry Readymade garment industry ha...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Apparel Manufacturing Business Opportunity.
Apparel Manufacturing Business Opportunity.

Apparel Manufacturing Business Opportunity. Readymade Garments (Jean Trousers & Shirts), Starting a Clothing Industry Readymade garment industry ha...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Iodised Salt
Iodised Salt

Iodised salt is produced by iodising common salt. Iodine plays an important role in our body-system, as it is utilised by the thyroid gland for the sy...

Capacity :

15 MT/Day

Plant and Machinery cost:

Rs 750 lakhs

Working Capital :

-

Rate of Return (ROR):

19.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project: Rs 1273 lakhs

Cost of Project :

127300000

Beer Plant
Beer Plant

Beer contains approximately 90% water, and the importance of the liquor to final beer quality cannot be over-estimated. Historically a correlation was...

Capacity :

Beer (650 ml size Bottle): 15385 Nos/Day

Plant and Machinery cost:

Rs 251 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

57.00

TCI :

Cost of Project: Rs 1032 lakhs

Cost of Project :

103200000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp