Please choose a project below related to this category.
Curcumin is the main biologically active phytochemical compound of Turmeric. Molecular chemical formula of Curcumin: C21H20O6. The most important cons...
|
Capacity : Curcumin Powder : 90 Kgs/Day Turmeric Oil: 90 Kgs/Day Deoiled Turmeric : 2800 Kgs/Day |
Plant and Machinery cost: 628 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 990 lakhs |
|
Cost of Project : 99000000 |
A cannula is a tube that can be inserted into the body, often for the delivery or removal of fluid or for the gathering of data. In simple terms, a ca...
|
Capacity : I.V. Cannula: 600,000 Boxes per Annum I.V. Catheters: 600,000 Boxes per Annum |
Plant and Machinery cost: 5916 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project: 7704 Lakhs |
|
Cost of Project : 770400000 |
How to Start Food Packaging Foil Manufacturing Business. Production of Aluminium Foil - Big Profit Industry Aluminum foils are produced by continuo...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A terry towel is described as a textile product which is made with loop pile on one or both sides generally covering the entire surface or forming str...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Mango Pulp is prepared from selected varieties of Fresh Mango Fruit. Fully matured Mangoes are harvested, quickly transported to the fruit processing...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Coir or coconut fibre, is a natural fibre extracted from the husk of coconut and used in products such as floor mats, doormats, brushes and mattresses...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The Rubber Hoses are used across diverse areas of industrial application such as Agriculture, Mining, Construction, Civil Engineering, Manufacturing,...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Zips are manufactured using bead technology, where profile metal elements (teeth) are clamped on woven and dyed textile tape; brass wire is usually us...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Melamine is used to form melamine formaldehyde resin, which find many applications in our commonly used household products such as furniture, kitchen...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Hospital beds permit body positioning that is not feasible in a regular home bed. They also permit the attachment of other pieces of equipment that ca...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
An aluminium bottle is a bottle made of aluminium (or aluminum, in American English). In some countries, it is also referred to as a bottle can. It is...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
An automotive gear is a rotating part containing teeth, which forms a mesh with another toothed machine part or gear and transmits torque. The gears c...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |