Non-ferrous metals are used as raw or subsidiary materials to make products in virtually all manufacturing segments. Their use has further expanded into high-tech electronic and IT industries in recent years. In particular, their consumption has sharply increased in developing countries where high economic growth continues, with new infrastructure being built alongside active industrial production.
Industry expected to post CAGR of 7% over 2015-2020 driven by increasing steel production in India and capacity additions in aluminium industry. Turnover of basic precious and non-ferrous metals rises by 8% driven by 16% growth of precious metals. In 2015, steel production value increases by 12% boosting demand for non-ferrous metals such as zinc and tin. Imports of precious metals rise by 27% to Rs740 billion in 2015 driven by increased imported volume of gold and silver. Indian basic precious and non-ferrous metals market rises by 8.3% driven by increased demand for precious metals gold and silver.
Indian demand for non-ferrous metals is expected to grow at 8 per cent between 2016 and 2021. Non-ferrous metals include metals like aluminium, copper, zinc and lead that find application in many industrial and infrastructural uses like real estate, automotive, defence, rail, power etc.
The expected demand growth in the non-ferrous metals industry is even better than the healthy trend observed in the last five years, “Over 2016-17 to 2021-22, the demand for these metals is expected to grow by around 8 per cent in line with strong economic prospects, thrust on manufacturing sector, healthy growth in key end-use segments further aided by rising usage intensity,
Global non-ferrous metals market and is expected to reach 107 million metric tons by 2020. The growth in this region is attributed to the increasing consumption of non-ferrous metals in India, China, and Japan.
Please choose a project below related to this category.
Red Oxide Primer is specially formulated for use on both bare and rusty iron and steel. Red oxide primer is a specially formulated coating used as a b...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Silicon is the most abundant element in Earth's crust. It is found in rocks, sand, clays and soils, combined with either oxygen as silicon dioxide, or...
|
Capacity : Silicon Metal: 25 MT /Day |
Plant and Machinery cost: Rs 1277 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 2484 lakhs |
|
Cost of Project : 248400000 |
Lead is a material very easy to recycle and, provided that adequate procedures are implemented; the ?nal product (secondary lead) is indistinguishable...
|
Capacity : Lead Ingot: 1944 MT/annum |
Plant and Machinery cost: Rs 66 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 257 lakhs |
|
Cost of Project : 25700000 |
Ferro-chrome, along with nickel (ferro-nickel) is the major alloying element in the production of stainless steel. Stainless steel is used in a variet...
|
Capacity : Low Carbon Ferrochrome : 15,000 MT/Annum |
Plant and Machinery cost: Rs 1472 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 4001 |
|
Cost of Project : 400100000 |
Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of stee...
|
Capacity : Low Carbon Silicomanganese: 15,000 MT/Annum |
Plant and Machinery cost: Rs 1422 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 3936 lakhs |
|
Cost of Project : 393600000 |
High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which it...
|
Capacity : Low Carbon Ferromanganes : 15,000 MT/Annum |
Plant and Machinery cost: Rs 371 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 2804 lakhs |
|
Cost of Project : 280400000 |
Industrial fasteners have a vital contribution for the growth of almost all sectors of industry. It is a wonderful manifestation which joins & secures...
|
Capacity : Mild Steel/HT Bolts :25 MT/Day •Mild Steel/HT Nuts :5MT/Day |
Plant and Machinery cost: Rs 93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.41 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project:Rs 430 Lakh |
|
Cost of Project : 43000000 |
Activated alumina is manufactured by dehydroxylating aluminium hydroxide in a way that produces a highly porous substance. The chemical composition ca...
|
Capacity : 6 MT/Day |
Plant and Machinery cost: Rs 72 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 150 Lakhs |
|
Cost of Project : 15000000 |
Copper is mankind’s oldest metal, dating back some 10,000 years. All of the great civilizations of the past used copper and copper alloys (principally...
|
Capacity : Copper Ingot: 8 MT/Day, Copper Rod: 36 MT/Day, Copper Wire: 4 MT/Day |
Plant and Machinery cost: Rs. 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 1201 Lakhs |
|
Cost of Project : 120100000 |
In igneous rocks, which comprise 95% of the earth’s crust the average percentage concentration of manganous oxide is 0.124. This is small in compared...
|
Capacity : 10 MT/Day. |
Plant and Machinery cost: 256 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project:691 Lakhs. |
|
Cost of Project : 69100000 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
Profile Copper powder is finely granulated copper that has many metallurgic functions. The powder is cheaper than regular cast copper, so engineers c...
|
Capacity : 2 MT/ day |
Plant and Machinery cost: 27 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 29.70 |
TCI : 792 Lakh |
|
Cost of Project : 0 |