Ferrous and Non-Ferrous Metals Projects

Non-ferrous metals are used as raw or subsidiary materials to make products in virtually all manufacturing segments. Their use has further expanded into high-tech electronic and IT industries in recent years. In particular, their consumption has sharply increased in developing countries where high economic growth continues, with new infrastructure being built alongside active industrial production.

Industry expected to post CAGR of 7% over 2015-2020 driven by increasing steel production in India and capacity additions in aluminium industry. Turnover of basic precious and non-ferrous metals rises by 8% driven by 16% growth of precious metals. In 2015, steel production value increases by 12% boosting demand for non-ferrous metals such as zinc and tin. Imports of precious metals rise by 27% to Rs740 billion in 2015 driven by increased imported volume of gold and silver. Indian basic precious and non-ferrous metals market rises by 8.3% driven by increased demand for precious metals gold and silver.

Indian demand for non-ferrous metals is expected to grow at 8 per cent between 2016 and 2021. Non-ferrous metals include metals like aluminium, copper, zinc and lead that find application in many industrial and infrastructural uses like real estate, automotive, defence, rail, power etc.

The expected demand growth in the non-ferrous metals industry is even better than the healthy trend observed in the last five years, “Over 2016-17 to 2021-22, the demand for these metals is expected to grow by around 8 per cent in line with strong economic prospects, thrust on manufacturing sector, healthy growth in key end-use segments further aided by rising usage intensity,

Global non-ferrous metals market and is expected to reach 107 million metric tons by 2020. The growth in this region is attributed to the increasing consumption of non-ferrous metals in India, China, and Japan.

Ferrous and Non-Ferrous Metals Projects

Please choose a project below related to this category.

S. G. Iron (Ductile Iron) and Alloy Steel Casting - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunity
S. G. Iron (Ductile Iron) and Alloy Steel Casting - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunity

There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and casting. Among the various proce...

Capacity :

18,000 MT/Annum

Plant and Machinery cost:

Rs. 168 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

66.00

TCI :

Cost of Project Rs. 483 Lakhs

Cost of Project :

0

Copper Wire Drawing, Annealing & Enamelling - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Copper Wire Drawing, Annealing & Enamelling - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Copper is the most used conducting metal. There is a good market for enameled copper wire in motors and transformers industries for winding and rewin...

Capacity :

1 MT / day

Plant and Machinery cost:

22 Lakhs

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

34.00

TCI :

209 Lakhs

Cost of Project :

0

Steel Fabrication Unit - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Steel Fabrication Unit - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

The importance of iron & steel among other materials is well known for industrialization and national economy. Metal fabrication is the group of enti...

Capacity :

2 MT/day

Plant and Machinery cost:

25 Lakhs

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

40.00

TCI :

131 Lakhs (W/c. 2 month)

Cost of Project :

0

FERRO ALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
FERRO ALLOYS OF NIOBIUM, MOLYBDENUM, TITANIUM, TUNGSTEN AND VANADIUM - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Ferro Alloys are the principal alloying agents in iron and steel production. Addition of ferro alloys improves mechanical and physical properties of i...

Capacity :

5 MT/Day

Plant and Machinery cost:

Rs. 2 crores

Working Capital :

-

Rate of Return (ROR):

50.00

Break Even Point (BEP):

41.00

TCI :

Rs. 5 crores

Cost of Project :

0

SILVER EXTRACTION FROM WASTE HYPO SOLUTION, X-RAY FILM, COLOUR PAPER BLEACH, CINEMA FILMS ETC. (BY CHEMICAL PROCESS) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process
SILVER EXTRACTION FROM WASTE HYPO SOLUTION, X-RAY FILM, COLOUR PAPER BLEACH, CINEMA FILMS ETC. (BY CHEMICAL PROCESS) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process

Hypo solution contains a good percentage of silver, which can be extracted either by chemical or electrolytic method. The extraction of silver from h...

Capacity :

2 Kg./Day

Plant and Machinery cost:

23 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

43.00

TCI :

62 Lakhs

Cost of Project :

0

U-Bolts and Centre Bolts for Leaf Springs - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
U-Bolts and Centre Bolts for Leaf Springs - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Bolts in various dimensions and head-shapes are available. Bolts can be supplied unfinished, semi-finished and fully finished conditions. U-bolts are...

Capacity :

5.00 MT./day

Plant and Machinery cost:

Rs. 152 lakhs

Working Capital :

-

Rate of Return (ROR):

38.00

Break Even Point (BEP):

48.00

TCI :

Rs. 436 lakhs

Cost of Project :

0

Nylon Coating On Zinc Wire (Wire “O“ Wire) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Nylon Coating On Zinc Wire (Wire “O“ Wire) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Polyamides are a group of thermoplastic polymers containing amid groups in the main chain. They are popularly known as Nylons, which is the trade nam...

Capacity :

20000 Meters/day

Plant and Machinery cost:

Rs. 45 lakhs

Working Capital :

-

Rate of Return (ROR):

38.00

Break Even Point (BEP):

48.00

TCI :

Rs. 211 lakhs

Cost of Project :

0

Forging Unit For Manufacturing Oil/Gas Pipe Fitting - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Production Schedule
Forging Unit For Manufacturing Oil/Gas Pipe Fitting - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Production Schedule

Metals is general and steel particular can be worked into useful shapes by hammering or pressing. This method of metal working is known as forging. A...

Capacity :

90 MT/Day

Plant and Machinery cost:

631 Lakhs

Working Capital :

-

Rate of Return (ROR):

49.00

Break Even Point (BEP):

32.00

TCI :

2926 Lakhs

Cost of Project :

0

Steel Shots/Grits - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Steel Shots/Grits - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Steel shots and grits are used in both static and site blasting equipments. Materials and abrasives used for surface preparation can be hazardous if u...

Capacity :

30 MT/Day

Plant and Machinery cost:

203 Lakhs

Working Capital :

-

Rate of Return (ROR):

54.00

Break Even Point (BEP):

30.00

TCI :

858 Lakhs

Cost of Project :

0

Aluminium Cladding (Construction) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout
Aluminium Cladding (Construction) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout

Aluminum wrought products are those aluminium products that have been subjected to plastic deformation by hot working and cold working process. These...

Capacity :

40 MT/Day

Plant and Machinery cost:

Rs. 3450 Lacs

Working Capital :

-

Rate of Return (ROR):

38.00

Break Even Point (BEP):

40.00

TCI :

RS. 105 Crores

Cost of Project :

0

COPPER POWDER BY ELECTROLYTIC PROCESS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
COPPER POWDER BY ELECTROLYTIC PROCESS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper pow...

Capacity :

150 MT/Day

Plant and Machinery cost:

45 Lakhs

Working Capital :

-

Rate of Return (ROR):

39.00

Break Even Point (BEP):

63.00

TCI :

158 Lakhs

Cost of Project :

0

PIG IRON - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
PIG IRON - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Today we find iron and steels of so many types and their products so wide spread all around, that it is hard to think if the world could progress any...

Capacity :

10 Lakhs MT/Day

Plant and Machinery cost:

38 Crores

Working Capital :

-

Rate of Return (ROR):

48.00

Break Even Point (BEP):

29.00

TCI :

388 Crores

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment