Please choose a project below related to this category.
A captive power plant also called auto producer or embedded generation is a power generation facility used and managed by an industrial or commercial...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Solar water heater is a device that can be used to capture sunlight in order to heat the water in your pipes to be used for baths, showers, etc. Solar...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled conductors—the transformer's coils....
|
Capacity : Power Transformers(132/33 KV, 10000 KVA Core Type Oil Cooled):100 Nos/annum |
Plant and Machinery cost: 85 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 169 lakhs |
|
Cost of Project : 16900000 |
A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled conductors—the transformer's coils....
|
Capacity : Power Transformer(132/33 KV, 50 MVA Core Type Oil Cooled): 50 Nos. /annum |
Plant and Machinery cost: 224 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project:1043 lakhs |
|
Cost of Project : 104300000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a mi...
|
Capacity : Solar Power 10 MW:60,000 KWH/ Day |
Plant and Machinery cost: Rs 5512 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 5.68 |
|
Break Even Point (BEP): 53.14 |
TCI : Cost of Project :Rs 8447 Lakhs |
|
Cost of Project : 844700000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
PSC stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These poles a...
|
Capacity : 60000 Nos. / Annum |
Plant and Machinery cost: Rs. 126 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 415 Lakhs |
|
Cost of Project : 41500000 |
Managing waste is the collection and ultimate disposal of the waste without causing environmental damage. Power generation from waste is one of unique...
|
Capacity : 5 MW |
Plant and Machinery cost: Rs.1940 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Rs.3231 Lakhs |
|
Cost of Project : 0 |
Sugar Industry is one of the most important agro-based industries and is highly responsible for creating significant impact on rural economy in partic...
|
Capacity : - |
Plant and Machinery cost: 37613 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 62600 Lakhs |
|
Cost of Project : 0 |
Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and pu...
|
Capacity : 500 MW |
Plant and Machinery cost: 143200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 158700 Lakhs |
|
Cost of Project : 0 |
Energy demand is fast increasing with rapid industrialization and urbanization in India. In a developing economy like India, generally energy demand i...
|
Capacity : 10 MW |
Plant and Machinery cost: 1423 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 3214 Lakhs |
|
Cost of Project : 0 |