• 0

Project Consultancy, Reports & Profiles

Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Manufacturing Business of Zinc Oxide from Zinc Dross (White Seal)
Manufacturing Business of Zinc Oxide from Zinc Dross (White Seal)

Zinc oxide has been known since ancient times, its use as a pigment is relatively rec... Read More

Capacity :
12 MT per Day
Plant and Machinery cost:
181.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
595.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Sleepers Complete Feasibility Study Report
Prestressed Concrete Sleepers Complete Feasibility Study Report

Concrete sleepers are one of the most important applications of a railway track syste... Read More

Capacity :
1,000 Pcs per Day
Plant and Machinery cost:
2659.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
3812.00Lakhs
Add To Inquiry Basket
Business Plan for Manufacturing Camphor Powder (Technical Grade)
Business Plan for Manufacturing Camphor Powder (Technical Grade)

Camphor (Cinnamomumcamphora) is a white, crystalline substance with a strong odor and... Read More

Capacity :
600 Kgs Per day
Plant and Machinery cost:
96.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
160.00Lakhs
Add To Inquiry Basket
Set up your own Maize Processing Plant with Cogeneration Plant
Set up your own Maize Processing Plant with Cogeneration Plant

Maize is the third most imp... Read More

Capacity :
Maize Starch 150 MT Per Day Liquid Glucose 20 MT Per Day Maltodextrin 18 MT Per Day Gluten as by Pro
Plant and Machinery cost:
13600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
32.00 %
TCI :
0.00 Lakhs
Cost of Project :
17100.00Lakhs
Add To Inquiry Basket
Recycling of Lithium Ion Battery Business
Recycling of Lithium Ion Battery Business

 

Because of the popularity of smart phones and ... Read More

Capacity :
Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
422.00Lakhs
Add To Inquiry Basket
Start Production Business of AAC Blocks from Silica Sand and Lime Stone Powder
Start Production Business of AAC Blocks from Silica Sand and Lime Stone Powder

In construction, the innova... Read More

Capacity :
300 Cu.Mtres Per Day
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1070.00Lakhs
Add To Inquiry Basket
Start Production of Ethanol from Broken Rice
Start Production of Ethanol from Broken Rice

 

Ethanol is a clea... Read More

Capacity :
Ethanol 30 Units per day Cattle feed as by Product 27 Units per day
Plant and Machinery cost:
2400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
3900.00Lakhs
Add To Inquiry Basket
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry
Set up Lithium Ion Battery Production Business Investment Opportunity in Battery Industry

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Detailed Project Report on Bromelain Enzyme from Pineapple Stems
Detailed Project Report on Bromelain Enzyme from Pineapple Stems

Pineapple extract, commonly known as bromelain enzyme from pineapple stems, includes p... Read More

Capacity :
8 MT Per Day
Plant and Machinery cost:
170.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
656.00Lakhs
Add To Inquiry Basket
Steel Shots and Grits (Steel Abrasives) Manufacturing Business
Steel Shots and Grits (Steel Abrasives) Manufacturing Business

Steel shots are spherical grains formed by atomizing (granulating) molten steel; thes... Read More

Capacity :
40 MT per day
Plant and Machinery cost:
722.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1884.00Lakhs
Add To Inquiry Basket
PVC Edge Banding Tape Manufacturing Business
PVC Edge Banding Tape Manufacturing Business

A piece of trim that hides ... Read More

Capacity :
PVC Edge Banding Tape (Size 22 mm, 50 meter, 1 mm Roll) 303,030 Meter Per Day
Plant and Machinery cost:
372.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1383.00Lakhs
Add To Inquiry Basket
Manufacturing of  Ascorbic Acid (Powder) from Sorbitol
Manufacturing of Ascorbic Acid (Powder) from Sorbitol

Vitamin C, also known as as... Read More

Capacity :
Ascorbic Acid (Powder) 8.3 MT Per Day Carbon Di-oxide by Product 11.6 MT Per Day Sodium Hyd
Plant and Machinery cost:
803.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
2444.00Lakhs
Add To Inquiry Basket
AAC Blocks from Silica Sand and Lime Stone Powder How to Start Production Business in Construction Sector
AAC Blocks from Silica Sand and Lime Stone Powder How to Start Production Business in Construction Sector

 

Aerated Concrete is a c... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Pre Feasibility Report on Liquor from Mahua Flowers
Pre Feasibility Report on Liquor from Mahua Flowers

 

Mahua liquor is a... Read More

Capacity :
Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle
Plant and Machinery cost:
220.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Start Flexographic Ink for Milk Pouches, Soap Covers,  Woven Sacks and Jute Bags Manufacturing Business
Start Flexographic Ink for Milk Pouches, Soap Covers, Woven Sacks and Jute Bags Manufacturing Business

For milk pouches, soap wraps, woven sacks, and jute bags, flexographic ink, also know... Read More

Capacity :
R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day
Plant and Machinery cost:
47.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
64.00Lakhs
Add To Inquiry Basket
Start Automated Vehicle Scrapping and Recycling Unit Business
Start Automated Vehicle Scrapping and Recycling Unit Business

Vehicles that are no longer... Read More

Capacity :
Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St
Plant and Machinery cost:
1000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
5100.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business
Lithium Ion Battery Recycling Detailed Project report on How to Start Battery Recycling Business

 

A lithium ion battery i... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent
Want to start a Calcium Propionate Manufacturing Business Calcium Propionate market is projected to register a CAGR of over three Percent

Calcium propionate (also called calcium propanoate) is a chemical compound, whose sal... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
3-Chloropivaloyl Chloride Manufacturing Business Plan
3-Chloropivaloyl Chloride Manufacturing Business Plan

3-chloropivaloyl chloride i... Read More

Capacity :
3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day
Plant and Machinery cost:
252.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
686.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business
Start Quartz Slabs Manufacturing Business

Quartz is the most plentifu... Read More

Capacity :
250 Nos. per day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3200.00Lakhs
Add To Inquiry Basket
Project Profile on Sodium Hypochlorite Manufacturing
Project Profile on Sodium Hypochlorite Manufacturing

The active ingredient of ch... Read More

Capacity :
4500 MT Per Annum
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
214.00Lakhs
Add To Inquiry Basket
Rice Husk based Biodegradable Cutlery Making Plant
Rice Husk based Biodegradable Cutlery Making Plant

People around the world hav... Read More

Capacity :
Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
222.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery LiFePO4 Production Business
Lithium Ion Battery LiFePO4 Production Business

A lithium-ion cell, sometim... Read More

Capacity :
Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day
Plant and Machinery cost:
289.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
970.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate Production Business
Ferric Pyrophosphate Production Business

Ferric Pyrophosphate:

Read More

Capacity :
600 MT Per Annum
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
133.00Lakhs
Add To Inquiry Basket
Set Up Production Unit of ADHESIVE (Fevicol Type)
Set Up Production Unit of ADHESIVE (Fevicol Type)

Any substance that is appli... Read More

Capacity :
300 MT Per Annum
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
70.00Lakhs
Add To Inquiry Basket
Start Production Business of Tartaric Acid
Start Production Business of Tartaric Acid

 

You may be aware that tartaric acid is frequen... Read More

Capacity :
10 MT per day
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Production of Malic Acid Powder The Best Manufacturing Business Idea
Production of Malic Acid Powder The Best Manufacturing Business Idea

 

Malic Acid Powder:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ferric Pyrophosphate: Start your own Manufacturing Business
Ferric Pyrophosphate: Start your own Manufacturing Business

 

Introduction to Ferric Pyrophosphate: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Flat Glass Manufacturing Business
Flat Glass Manufacturing Business

 

Glass has a microscopic structure similar to that of a liquid, where the various components come together to... Read More

Capacity :
4000 Sq.Mtrs. per day
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
18700.00Lakhs
Add To Inquiry Basket
Start Production Business of Rubber Granules from Waste Tyre
Start Production Business of Rubber Granules from Waste Tyre

Rubber is a polymer of butadiene and one of the most significant chemical components. It is utilised extensively in a ... Read More

Capacity :
Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day
Plant and Machinery cost:
6000000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
20700000.00Lakhs
Add To Inquiry Basket
Manufacturing of Aluminium Ingots from Aluminium Scrap
Manufacturing of Aluminium Ingots from Aluminium Scrap

Compared to blooms, billets, and slabs, aluminium ingots are very large casting products both in size and shape. Altho... Read More

Capacity :
Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Nicotine Sulphate from Tobacco Leaves Production Business
Nicotine Sulphate from Tobacco Leaves Production Business

With human assistance, tobacco is grown, with the leaf being the most valuable component of the plant. Although tobacc... Read More

Capacity :
Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day
Plant and Machinery cost:
16100000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
141600000.00Lakhs
Add To Inquiry Basket
Natural Tanning Powder  Production Business
Natural Tanning Powder Production Business

 

Comparatively speaking to other methods of tanning, natural tanning is now the most conventional, classic, a... Read More

Capacity :
600 MT per Annum
Plant and Machinery cost:
3700000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000000.00Lakhs
Add To Inquiry Basket
You Should Read SYour Own Industry in Booming Sectors
You Should Read SYour Own Industry in Booming Sectors

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Automated Vehicle Scrapping Unit
Set Up Automated Vehicle Scrapping Unit

 

Vehicle scrapping units, also called scrapyards, are now playing an important r... Read More

Capacity :
0
Plant and Machinery cost:
325.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1455.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan For ZINC INGOTS
Manufacturing Business Plan For ZINC INGOTS

 

Zinc ingot is a white or gray color pure zinc metal, which is cast into a block... Read More

Capacity :
Zinc Ingots (Purity 98%) 6 MT Per Day
Plant and Machinery cost:
124.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
863.00Lakhs
Add To Inquiry Basket
Ferrochrome Manufacturing Business
Ferrochrome Manufacturing Business

 

Ferrochrome is an alloy that combines chromium wit... Read More

Capacity :
Ferrochrome 135 MT Per Day
Plant and Machinery cost:
26900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
10.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
40400.00Lakhs
Add To Inquiry Basket
Start a Business Of LPG Cylinders
Start a Business Of LPG Cylinders

LPG cylinders are pressurized containers and transport lique... Read More

Capacity :
LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day
Plant and Machinery cost:
911.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3475.00Lakhs
Add To Inquiry Basket
Start Banana Wine Production Business
Start Banana Wine Production Business

Wine has been popular for centuries, and this fermented beve... Read More

Capacity :
Banana Wine (750 ml size Bollte) 2,960 Bottles per day
Plant and Machinery cost:
530.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1189.00Lakhs
Add To Inquiry Basket
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk, Saw Dust & Coconut Shell Manufacturing Business Plan

Activated carbon is a type of carbon that has been treated w... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business
Set Up Business of Flat Glass Manufacturing Most Profitable Idea for Flat Glass Production Business

A flat glass Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business
Set Up Business of Double Wall Corrugated Pipes Manufacturing Most Profitable Idea for Double Wall Corrugated Pipes Manufacturing Business

A type of pipe utilized in numerous applications is Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Bio-Degradable Plastic Polymer from Corn
A Business Plan for Bio-Degradable Plastic Polymer from Corn

Corn is a popular source for materials that can be recycled into bio-degradable plast... Read More

Capacity :
10,000 MT Per Annum
Plant and Machinery cost:
6058.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
8100.00Lakhs
Add To Inquiry Basket
Sulphur Powder Manufacturing Business
Sulphur Powder Manufacturing Business

 

Sulphur powder, o... Read More

Capacity :
20,000 MT Per Annum
Plant and Machinery cost:
1225.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
4318.00Lakhs
Add To Inquiry Basket
Manufacturing Business Ginger Oil & Ginger Powder
Manufacturing Business Ginger Oil & Ginger Powder

 

Ginger oil, also ... Read More

Capacity :
60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum
Plant and Machinery cost:
381.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
528.00Lakhs
Add To Inquiry Basket
Start a Business of Manufacturing Steel Epoxy Putty Stick
Start a Business of Manufacturing Steel Epoxy Putty Stick

In the 1960s, MIT researche... Read More

Capacity :
1,500 Dz. Per Annum
Plant and Machinery cost:
2.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
35.00 %
TCI :
0.00 Lakhs
Cost of Project :
34.00Lakhs
Add To Inquiry Basket
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell
Start Activated Carbon from Rice Husk, Saw Dust & Coconut Shell Processing Business Profitable & Potential Business Idea of Activated Carbon from Rice Husk, Saw Dust & Coconut Shell

Popular air purifiers conta... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar
Most Demandable Business Idea for Mini Steel Plant (Billets and TMT Bar) Start Production of Steel Billets and TMT Bar

One of the most widely used metals in the world, Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Cumin, Turmeric, Chilly & Coriander Trading or Exporter
Cumin, Turmeric, Chilly & Coriander Trading or Exporter

In the food industry, Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production Of Wire Nails
Start Production Of Wire Nails

 

Wire nails are a ... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum
Plant and Machinery cost:
939.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
Auto Brake Pad  and  Auto Brake Shoe Production Business
Auto Brake Pad and Auto Brake Shoe Production Business

 

Auto Brake Pads a... Read More

Capacity :
Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum
Plant and Machinery cost:
279.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1422.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles
Business Plan for Production of Double and Single Wall Vacuum Steel Bottles

 

Double-wall vacuu... Read More

Capacity :
Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0
Plant and Machinery cost:
963.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1619.00Lakhs
Add To Inquiry Basket
A Business Plan for Ferric Pyrophosphate
A Business Plan for Ferric Pyrophosphate

 

Ferric pyrophosph... Read More

Capacity :
Ferric Pyrophosphate 600 MT Per Annum
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
133.00Lakhs
Add To Inquiry Basket
How to Start A Business of Auto Piston
How to Start A Business of Auto Piston

An Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Seaworthy Containers
A Business Plan for Seaworthy Containers

Seaworthy containers are a new type of shipping container that have been designed to withstand the condit... Read More

Capacity :
Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum
Plant and Machinery cost:
907.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
2040.00Lakhs
Add To Inquiry Basket
Setup Extraction of Salt  From Sea Water  Plant
Setup Extraction of Salt From Sea Water Plant

 

Extraction of salt from sea water is a process by which salt is removed from the seawater. Salt... Read More

Capacity :
Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum
Plant and Machinery cost:
1156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
2776.00Lakhs
Add To Inquiry Basket
A business Plan For Surgical Sutures (Assembling)
A business Plan For Surgical Sutures (Assembling)

 

Surgical sutures are a vital part of the medical industry and are used in numerous medical proc... Read More

Capacity :
Surgical Sutures: 450,000 Boxes per annum
Plant and Machinery cost:
169.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
877.00Lakhs
Add To Inquiry Basket
Starting up production of  Glycerol Monostearate
Starting up production of Glycerol Monostearate

Glycerol monostearate is an organic compound that is derived from glycerol and used as an emulsifier, thi... Read More

Capacity :
Glycerol Monostearate: 900 MT Per Annum
Plant and Machinery cost:
93.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
320.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing Business of... 12 MT per Day 31.00 595.00
Prestressed Concrete Slee... 1,000 Pcs per Day 27.00 3812.00
Business Plan for Manufac... 600 Kgs Per day 29.00 160.00
Set up your own Maize Pro... Maize Starch 150 MT Per Day Liquid Glucose 20 MT Per Day Maltodextrin 18 MT Per Day Gluten as by Pro 21.00 17100.00
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Start Production Business... 300 Cu.Mtres Per Day 25.00 1070.00
Start Production of Ethan... Ethanol 30 Units per day Cattle feed as by Product 27 Units per day 26.00 3900.00
Set up Lithium Ion Batter... 0 0.00 0.00
Detailed Project Report o... 8 MT Per Day 28.00 656.00
Steel Shots and Grits (St... 40 MT per day 28.00 1884.00
PVC Edge Banding Tape Man... PVC Edge Banding Tape (Size 22 mm, 50 meter, 1 mm Roll) 303,030 Meter Per Day 30.00 1383.00
Manufacturing of Ascorbi... Ascorbic Acid (Powder) 8.3 MT Per Day Carbon Di-oxide by Product 11.6 MT Per Day Sodium Hyd 29.00 2444.00
AAC Blocks from Silica Sa... 0 0.00 0.00
Pre Feasibility Report on... Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle 33.00 500.00
Start Flexographic Ink fo... R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day 27.00 64.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Lithium Ion Battery Recyc... 0 0.00 0.00
Want to start a Calcium P... 0 0.00 0.00
3-Chloropivaloyl Chloride... 3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day 27.00 686.00
Start Quartz Slabs Manufa... 250 Nos. per day 27.00 3200.00
Project Profile on Sodium... 4500 MT Per Annum 27.00 214.00
Rice Husk based Biodegrad... Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day 27.00 222.00
Lithium Ion Battery LiFeP... Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day 29.00 970.00
Ferric Pyrophosphate Prod... 600 MT Per Annum 29.00 133.00
Set Up Production Unit of... 300 MT Per Annum 28.00 70.00
Start Production Business... 10 MT per day 45.00 1300.00
Production of Malic Acid ... 0 0.00 0.00
Ferric Pyrophosphate: Sta... 0 0.00 0.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 2752 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.