We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Tooth Paste
Tooth Paste
Read More
Capacity : 700 Kg./Day
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):38.00 %
TCI :125.00 Lakhs
Cost of Project : 125.00Lakhs
Add To Inquiry Basket
ENGINEERING COLLEGE
ENGINEERING COLLEGE

There is need of engineering college in India for the development of country and give the better opportunity to the general merit. But in our count... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
AUTOMOTIVE TYRE (Tire) PLANT FOR CAR & TRUCKS
AUTOMOTIVE TYRE (Tire) PLANT FOR CAR & TRUCKS

Tyre is rubber shielded wheel of metal. The maximum use of tyre is captured by the automobile industry, because the automobiles cannot perform thei... Read More

Capacity : 5,00,000 Tyre / Annum
Plant and Machinery cost: 279.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):74.00 %
TCI :861.00 Lakhs
Cost of Project : 861.00Lakhs
Add To Inquiry Basket
BIOFERTILIZERS FROM COTTON SEED CAKE
BIOFERTILIZERS FROM COTTON SEED CAKE

Cotton seeds are one of the oil producing seeds. The cotton seed cake is the residue left after the extraction of cotton seed oil from the seeds. T... Read More

Capacity : 3000 MT / Annum
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):46.00 %
TCI :128.00 Lakhs
Cost of Project : 128.00Lakhs
Add To Inquiry Basket
Grape Wine
Grape Wine

The Indian wine industry is in its nascent stage. The per capita consumption of wine in India is only 10 ml per annum as against 100 litres per yea... Read More

Capacity : 10500 Ltrs/day
Plant and Machinery cost: 453.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):68.00%
Break Even Point (BEP):32.00 %
TCI :1218.00 Lakhs
Cost of Project : 1218.00Lakhs
Add To Inquiry Basket
Aluminium Ingots From Aluminium Scrap
Aluminium Ingots From Aluminium Scrap

The 20th century has seen the emergence of aluminium as a key industrial and strategic material, second to only steel in terms of importance and to... Read More

Capacity : 25 MT/Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 1500.00
Rate of Return (ROR):58.00%
Break Even Point (BEP):30.00 %
TCI :1800.00 Lakhs
Cost of Project : 1800.00Lakhs
Add To Inquiry Basket
HOT MELT ADHESIVES
HOT MELT ADHESIVES

Hot melt adhesives are the most common type of adhesives used to bind the material together with a very high percentage of strength. These adhesive... Read More

Capacity : 900 Kg./day
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):33.00 %
TCI :235.00 Lakhs
Cost of Project : 235.00Lakhs
Add To Inquiry Basket
WOODEN DOORS AND FRAMES
WOODEN DOORS AND FRAMES

Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such ... Read More

Capacity : 80 Pcs./day
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):42.00 %
TCI :93.00 Lakhs
Cost of Project : 93.00Lakhs
Add To Inquiry Basket
TRANSFORMER OIL
TRANSFORMER OIL

Transformer oils are mainly mineral oils and are used to dissipate the heat generated in electric transformers, switches, circuit breakers, and mot... Read More

Capacity : 100 K Ltrs./day
Plant and Machinery cost: 1104.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):30.00 %
TCI :3030.00 Lakhs
Cost of Project : 3030.00Lakhs
Add To Inquiry Basket
PHOTOCOPIER CLEANING WEB (Non Woven)
PHOTOCOPIER CLEANING WEB (Non Woven)

During the printing process, ink, dirt and other residue may accumulate on the blanket cylinders. The accumulation of such residues can cause vario... Read More

Capacity : 5000 Nos./day
Plant and Machinery cost: 108.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):45.00 %
TCI :315.00 Lakhs
Cost of Project : 315.00Lakhs
Add To Inquiry Basket
CHEWING TOBACCO (RAJA TYPE)
CHEWING TOBACCO (RAJA TYPE)

-

Read More
Capacity : 150 Kg./day
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):53.00 %
TCI :70.00 Lakhs
Cost of Project : 70.00Lakhs
Add To Inquiry Basket
Jute Ropes Sutli
Jute Ropes Sutli

Jute Ropes/Sutli

Read More
Capacity : 1000 Kg./Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):39.00 %
TCI :34.00 Lakhs
Cost of Project : 34.00Lakhs
Add To Inquiry Basket
Ferric & Non Ferric Alum
Ferric & Non Ferric Alum

-

Read More
Capacity : 50 MT/Day
Plant and Machinery cost: 73.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):36.00 %
TCI :302.00 Lakhs
Cost of Project : 302.00Lakhs
Add To Inquiry Basket
INSTANT TEA
INSTANT TEA

Instant tea is manufactured in a several countries but production and consumption in the United States is greater than in the rest of the world. Th... Read More

Capacity : 1.00 MT / Day
Plant and Machinery cost: 134.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):41.00 %
TCI :310.00 Lakhs
Cost of Project : 310.00Lakhs
Add To Inquiry Basket
ALUMINIUM UTENSILS
ALUMINIUM UTENSILS

Aluminium is an abundant, slightly blue-white metal of high strength-to-weight ratio. It is used when high strength with lightweight, corrosion res... Read More

Capacity : 2.00 MT / Day
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):30.00 %
TCI :251.00 Lakhs
Cost of Project : 251.00Lakhs
Add To Inquiry Basket
Ferrosilicon
Ferrosilicon

Ferroalloys are used in making alloy steels and castings of different special types as addition agents. Ferro alloys are usually made in electric-a... Read More

Capacity : 10 MT/Day
Plant and Machinery cost: 79.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):56.00%
Break Even Point (BEP):46.00 %
TCI :386.00 Lakhs
Cost of Project : 386.00Lakhs
Add To Inquiry Basket
Rectified Spirit
Rectified Spirit

Denatured spirit is the product of manufacture from ethyl alcohol or ethanol. The denatured alcohol are either completely denatured alcohol or spec... Read More

Capacity : 4000 Bottles / day
Plant and Machinery cost: 114.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):42.00 %
TCI :2129.00 Lakhs
Cost of Project : 2129.00Lakhs
Add To Inquiry Basket
Printed Paper Shopping Bags
Printed Paper Shopping Bags

Printed paper shopping bags are more popular and good in appearance. They are now going to replace the poly bags. There is lot of use of poly bags ... Read More

Capacity : 10000 Nos. / day
Plant and Machinery cost: 32.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):60.00%
Break Even Point (BEP):34.00 %
TCI :100.00 Lakhs
Cost of Project : 100.00Lakhs
Add To Inquiry Basket
Wine from Kinnow Fruits
Wine from Kinnow Fruits

Kinnow has acquired commercial importance and popularity owing to its success under varied agro climatic conditions, response to inputs and high ec... Read More

Capacity : 1500 KLs/Annum
Plant and Machinery cost: 263.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):80.00 %
TCI :845.00 Lakhs
Cost of Project : 845.00Lakhs
Add To Inquiry Basket
PVC Rexine Cloth
PVC Rexine Cloth

P.V.C Rexine Cloth

Rexine is also known in other words, as artificial leather clot... Read More

Capacity : 4000 Sq. Meter / day
Plant and Machinery cost: 31.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):42.00 %
TCI :184.00 Lakhs
Cost of Project : 184.00Lakhs
Add To Inquiry Basket
Liquid Shoe Polish
Liquid Shoe Polish

Polishes usually contain several kind of natural and synthetic waxes, paraffin waxes, resins, solvents, auxiliary agents and water. As well as the ... Read More

Capacity : 7600 Nos. Bottles / day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):41.00 %
TCI :64.00 Lakhs
Cost of Project : 64.00Lakhs
Add To Inquiry Basket
Metalised Colour PVC and Metalised Rainbow PVC Sequence and Sparklers
Metalised Colour PVC and Metalised Rainbow PVC Sequence and Sparklers
Read More
Capacity : P.V.C Colour Sequence and Spark 30000 kgs/Annum, Rainbow Colour Sequence and Spark 30000 Kgs /Annum
Plant and Machinery cost: 31.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :109.00 Lakhs
Cost of Project : 109.00Lakhs
Add To Inquiry Basket
Potassium Silicate
Potassium Silicate

The uses of alkali metal silicates fall into two broad categories 1. as materials from which further important industrial products can be derived. ... Read More

Capacity : 1800 MT/Annum
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):67.00 %
TCI :156.00 Lakhs
Cost of Project : 156.00Lakhs
Add To Inquiry Basket
Recycling of Waste Computer
Recycling of Waste Computer

Computer is an electronic device. All the parts of the computer has certain period of life after that these are unable to work. Waste parts can reu... Read More

Capacity : Remodeling Computer 3 Nos/Day
Plant and Machinery cost: 11.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):39.00 %
TCI :61.00 Lakhs
Cost of Project : 61.00Lakhs
Add To Inquiry Basket
PVC Coloured Sheet and Rainbow Coloured Sheet and Sequence
PVC Coloured Sheet and Rainbow Coloured Sheet and Sequence
Read More
Capacity : 700 KGS/day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):32.00 %
TCI :185.00 Lakhs
Cost of Project : 185.00Lakhs
Add To Inquiry Basket
ROSE PLANTATION AND ROSE OIL EXTRACTION
ROSE PLANTATION AND ROSE OIL EXTRACTION

There are more than 5000 verities of rose in India of which only a few yield essential oils. The verities that are grown in India for obtaining ess... Read More

Capacity : Flower Yield 4000 Kgs/Ha/Annum, Flower Yield 60 Kgs/Day. Avg., 75 Kgs Rose Oil/Annum, 25000 Ltrs. Ro
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):43.00 %
TCI :98.00 Lakhs
Cost of Project : 98.00Lakhs
Add To Inquiry Basket
Acrylic Teeth
Acrylic Teeth

There is increase of population through out the world. Most of the people has teeth problem in the earlier ages and maximum in the above age of 40 ... Read More

Capacity : 1000 Teeth/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):49.00 %
TCI :18.00 Lakhs
Cost of Project : 18.00Lakhs
Add To Inquiry Basket
Recovery of Zinc Metal From Zinc Ash
Recovery of Zinc Metal From Zinc Ash

Indian has an ancient and impressive heritage in zinc production and their usage. There was at one time a thriving lead and zinc industry in the st... Read More

Capacity : 2 Mt/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):58.00%
Break Even Point (BEP):32.00 %
TCI :265.00 Lakhs
Cost of Project : 265.00Lakhs
Add To Inquiry Basket
Plastic Cards For Telephone
Plastic Cards For Telephone

Telephone plastic card are made by using either PVC, or cellulose acetate or by using polyaniline resin. Above the polymer resin there is use of ma... Read More

Capacity : 2000 Telephone Card/Day
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):67.00%
Break Even Point (BEP):32.00 %
TCI :91.00 Lakhs
Cost of Project : 91.00Lakhs
Add To Inquiry Basket
Hand Pump (Mark II)
Hand Pump (Mark II)

Hand pumps are the most economical means of providing water supply in rural and out laying urban area. The conventional hand pumps are being used i... Read More

Capacity : 10 Nos./Day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):51.00%
Break Even Point (BEP):35.00 %
TCI :116.00 Lakhs
Cost of Project : 116.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes and Needles Manufacturing
Disposable Plastic Syringes and Needles Manufacturing

With the development of pharmaceutica... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

The disposable plastic syringe ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Insulator (Made by Fiber glass & Reinforced Plastics by Hand Moulding Press)
Insulator (Made by Fiber glass & Reinforced Plastics by Hand Moulding Press)

For the manufacture of insulator basic raw materials used are glass fibre, reinforced plastics, calcium carbonate and pigments etc. all the raw mat... Read More

Capacity : 60000Kgs/Annum
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):49.00 %
TCI :61.00 Lakhs
Cost of Project : 61.00Lakhs
Add To Inquiry Basket
Coffee Plantation
Coffee Plantation

The genus comprises 50-60 species of shrubs or small trees indigenous to tropical Africa and Asia. Among them 4 or 5 species are important as sourc... Read More

Capacity : 1.80 Ton/Day
Plant and Machinery cost: 15.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):28.00 %
TCI :325.00 Lakhs
Cost of Project : 325.00Lakhs
Add To Inquiry Basket
Calcined Coke (By using Horizontal Kiln)
Calcined Coke (By using Horizontal Kiln)

Petroleum coke is a dark form of carbon, produced from the thermal decomposition and polymerization of heavy liquid hydrocarbons that are derived f... Read More

Capacity : 15 MT/Day
Plant and Machinery cost: 164.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):46.00 %
TCI :526.00 Lakhs
Cost of Project : 526.00Lakhs
Add To Inquiry Basket
Dental College
Dental College

Dental education occupies a place of pride in the field of medical studies. The basic aim of the dental colleges is to provide health-oriented cour... Read More

Capacity : 100 Students in Dental College ,4 year course with Dental College
Plant and Machinery cost: 674.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):43.00 %
TCI :1642.00 Lakhs
Cost of Project : 1642.00Lakhs
Add To Inquiry Basket
Sodium Azide
Sodium Azide

It is a colourless crystalline product, which is soluble in water in liquid ammonia and highly toxic. It is manufactured by using Sodium Ammonia an... Read More

Capacity : 10.00 MT/day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):54.00%
Break Even Point (BEP):30.00 %
TCI :1200.00 Lakhs
Cost of Project : 1200.00Lakhs
Add To Inquiry Basket
ERW Steel Conduit Pipes (Black Pipes)
ERW Steel Conduit Pipes (Black Pipes)

Conduit pipe is a product through which electric wiring is passed in order to keep it safe. It is manufactured from hot rolled or cold rolled sheet... Read More

Capacity : 15.00 MT/day
Plant and Machinery cost: 100.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):58.00%
Break Even Point (BEP):35.00 %
TCI :600.00 Lakhs
Cost of Project : 600.00Lakhs
Add To Inquiry Basket
WIRE MESH (HEXAGONAL SQUARE)
WIRE MESH (HEXAGONAL SQUARE)

Wire mesh is known as wire netting, which is supplied in various types of meshes and for various purposes. It is used by the builders i.e. fencing ... Read More

Capacity : 10 MT/Day
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):34.00 %
TCI :181.00 Lakhs
Cost of Project : 181.00Lakhs
Add To Inquiry Basket
COLD ROLLING OF MILD STEEL STRIPS & SHEETS
COLD ROLLING OF MILD STEEL STRIPS & SHEETS

When a metal is rolled, extruded or drawn at temperature below the recrystallization, the metal is cold worked. The cold rolling mills use hot roll... Read More

Capacity : 200 MT/Day
Plant and Machinery cost: 1600.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):43.00%
Break Even Point (BEP):46.00 %
TCI :6700.00 Lakhs
Cost of Project : 6700.00Lakhs
Add To Inquiry Basket
ALUMINIUM EXTRUSION PLANT
ALUMINIUM EXTRUSION PLANT

Aluminium, the wonder metal of today and tomorrow, is poised for a remarkable growth. The specific characteristics of aluminium that have led it to... Read More

Capacity : 2 MT/Day
Plant and Machinery cost: 76.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):37.00 %
TCI :313.00 Lakhs
Cost of Project : 313.00Lakhs
Add To Inquiry Basket
COPPER POWDER BY ELECTROLYTIC PROCESS
COPPER POWDER BY ELECTROLYTIC PROCESS

The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper ... Read More

Capacity : 150 MT/Day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):63.00 %
TCI :158.00 Lakhs
Cost of Project : 158.00Lakhs
Add To Inquiry Basket
PRECIPITATED CALCIUM CARBONATE
PRECIPITATED CALCIUM CARBONATE

Calcium compounds such as calcium carbonate, calcium phosphate, calcium Sulphate are widely distributed in nature. Calcium carbonate forms major co... Read More

Capacity : 120000 MT/Annum
Plant and Machinery cost: 871.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):57.00 %
TCI :1482.00 Lakhs
Cost of Project : 1482.00Lakhs
Add To Inquiry Basket
MOSQUITO REPELLENT COILS
MOSQUITO REPELLENT COILS

The production of the mosquito coils dates back from the period around 1890. In the early stages the look and the shapes of an incense stick burned... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
MOSQUITO REPELLENT CANDLE
MOSQUITO REPELLENT CANDLE

The concept of mosquito repellent candle is a new one which serve the purpose of enlightment as well as mosquito repellency. It is more efficiently... Read More

Capacity : 500 kg/Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Rubberised Cork Sheet
Rubberised Cork Sheet

Cork is one of the few naturally grown closed-cell foams that has never been duplicated with synthetic material. The cork oak is unique in that the... Read More

Capacity : 500 kgs/Day
Plant and Machinery cost: 20.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :53.00 Lakhs
Cost of Project : 53.00Lakhs
Add To Inquiry Basket
Amusement Park Cum Water Park
Amusement Park Cum Water Park

The human life in cities is becoming more and more mechanical because of noise pollution, environment pollution. For relaxed and peaceful environme... Read More

Capacity : 4000 Entry/Day, 750 Visitor/Day, 20 Room Hotel & 300 Meals/day Resturant
Plant and Machinery cost: 1900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :2600.00 Lakhs
Cost of Project : 2600.00Lakhs
Add To Inquiry Basket
Soft Drinks (Cola, Orange, Lemon, Mango Pulp, Ginger, Clear Lemon 7up type)
Soft Drinks (Cola, Orange, Lemon, Mango Pulp, Ginger, Clear Lemon 7up type)

Soft drinks are largely used in the society to serve any guest in the house, in the commercial and industrial units to entertain the customers. It ... Read More

Capacity : 48000 Bottles/Day
Plant and Machinery cost: 94.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):49.00 %
TCI :474.00 Lakhs
Cost of Project : 474.00Lakhs
Add To Inquiry Basket
Surgical Cotton & Bandages
Surgical Cotton & Bandages

Surgical Bandages are the products manufactured from white bleached Cotton gauge cloth of suitable quality. Absorbent cotton also known as surgical... Read More

Capacity : 90 Ton Surgical Cotton/Annum, 8 Lakh Nos. Surgical Bandages/Annum
Plant and Machinery cost: 16.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):53.00 %
TCI :51.00 Lakhs
Cost of Project : 51.00Lakhs
Add To Inquiry Basket
Exercise Note Book & Registers Pads And File
Exercise Note Book & Registers Pads And File

Exercise books are widely known & vastly used as day to day products. Notebooks are available in the market in various sizes, shapes & page... Read More

Capacity : 600 Nos. Exercise Book, 600 Nos. Register/Day
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):71.00%
Break Even Point (BEP):62.00 %
TCI :9.00 Lakhs
Cost of Project : 9.00Lakhs
Add To Inquiry Basket
Bricks From Fly Ash
Bricks From Fly Ash

Bricks may be made from a number of different kinds of materials, but they must usually possess (can be capable of developing) a certain amount of ... Read More

Capacity : 83333 Nos./Day
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.80%
Break Even Point (BEP):53.00 %
TCI :192.00 Lakhs
Cost of Project : 192.00Lakhs
Add To Inquiry Basket
Iron Ore Mining
Iron Ore Mining

Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by t... Read More

Capacity : 139 Lakh MT/Annum
Plant and Machinery cost: 1030.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):38.00 %
TCI :1163.00 Lakhs
Cost of Project : 1163.00Lakhs
Add To Inquiry Basket
Synthetic Floats For Fishing Industry
Synthetic Floats For Fishing Industry

Floating agent in the fishing industry has indirect relation. It has very good relation with fisheries. Fisherman has applied it lot for spreading ... Read More

Capacity : 400.00 Floats/Day
Plant and Machinery cost: 69.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):40.00 %
TCI :344.00 Lakhs
Cost of Project : 344.00Lakhs
Add To Inquiry Basket
DIABETIC FOOD
DIABETIC FOOD

Dibetic food is special kind of food product, which can be used by the dibetic patient directly with out any side effect in the body or any direct ... Read More

Capacity : 1 MT Diabetic Food/Day
Plant and Machinery cost: 20.00 Lakhs
Working Capital : 35.00
Rate of Return (ROR):35.40%
Break Even Point (BEP):45.00 %
TCI :85.00 Lakhs
Cost of Project : 85.00Lakhs
Add To Inquiry Basket
High Mast Poles
High Mast Poles

High mast poles are newly ventured high pillars for using high mast lighting, flood lighting, sports lighting, traffic signals, street lighting etc... Read More

Capacity : 9000 Nos./ANNUM
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):71.00 %
TCI :484.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity : 1440 Cubie Meter/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):18.19%
Break Even Point (BEP):75.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips)

The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating l... Read More

Capacity : 1500 Lacs/Annum
Plant and Machinery cost: 86.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):43.00 %
TCI :213.00 Lakhs
Cost of Project : 213.00Lakhs
Add To Inquiry Basket
Tyre Retreading And Repairing Facility For Heavy Vehicles
Tyre Retreading And Repairing Facility For Heavy Vehicles

Automobile tyres are quite costly in India, and are manufactured only by big manufacturers. Retreading is replacement of worn, cut or loose treads ... Read More

Capacity : 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):89.00%
Break Even Point (BEP):28.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Ferrochrome Alloy
Ferrochrome Alloy

In the manufacture of steel, chromium is added usually in the form of ferro chrome. Pure chromium metal, produced by electrolytic or aluminothermic... Read More

Capacity : 0
Plant and Machinery cost: 2998.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):76.00 %
TCI :4490.00 Lakhs
Cost of Project : 4490.00Lakhs
Add To Inquiry Basket
Tractor Manufacturing
Tractor Manufacturing

Tractor is one of the most important farming machine. We can say that tractor is the forehand of the farming industry. This is the blessing of god ... Read More

Capacity : 10 Nos/Day
Plant and Machinery cost: 91.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):79.00%
Break Even Point (BEP):18.00 %
TCI :1735.00 Lakhs
Cost of Project : 1735.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Prestressed Concrete Slee... 1,000 Pcs per Day 27.00 3812.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Set Up Automated Vehicle ... 0 26.00 1455.00
Composite Materials-Carbo... Carbon Fibre Composite Laminate M2 width 1500 mm : 833.3 Sq. Mt. / Day Glass Fibre Composite Laminat 29.00 452.00
Manufacturing Business Pl... 0 0.00 0.00
Gold and Diamond Jeweller... Gold Jewellery:9.50 Kgs /day Gold Plus Diamond Jewellery :2.38 Kgs / day 34.00 2504.00
Skill Development Centre Engineering Graduates: 250 Students / Batch Supervisory & Workmen Cadre: 250 Students / Batch Each B 15.00 1228.00
Workshop for Motors of Lo... Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U 30.00 76.00
Ayurvedic Herbal Hand San... 1 0.00 0.00
Rubberised Coir Mattresse... 0 0.00 0.00
Heat & UV Stabilizers for... 0 0.00 0.00
Dhoop (Loban) Benzoin 0 0.00 0.00
Cricket Ball and Bat Manu... 0 0.00 0.00
Plastic Toys 0 0.00 0.00
Gasket Shellac Compound 0 0.00 0.00
Paint Brush 0 0.00 0.00
Synthetic Ruby and Sapphi... 0 0.00 0.00
LPG Bottling Plant LPG Cylinders (5 Kgs Size 1360 Nos/day) : 2040 MT/Annum LPG Cylinders (14.2 Kgs Size 1000 Nos/day) 28.00 919.00
Production of Plastic Too... 0 0.00 0.00
LPG Cylinder Refilling Pl... 0 0.00 0.00
Business Ideas, Projects ... 0 0.00 0.00
Ice Making Plant 0 0.00 0.00
Cold Storage Fruits & Vegetables Store : 2000 MT 23.00 281.00
Gold and Silver Jewellery 0 0.00 0.00
Tailors Chalk 0 0.00 0.00
Tennis Ball (Used in Pla... 1,500,000 NOS/annum 28.00 164.00
Floral Foam 3,600,000 Pcs/annum 27.00 270.00
Calcium Silicate Blocks a... Calcium Silicate Blocks : 31250 sq.mt./MT/annum Calcium Silicate Pipes: 750 sq.mt./MT/annum 26.00 158.00
Industrial Training Insti... Total number of students: 3600 students/annum (each trade 120 students) 16 Trade 1 year duration 14 27.00 2476.00
Residential School 5000 Nos of students 0.35 4887.00
12345678910...

Showing 301 - 360 of 534 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR