Reach Us
Niir Project Consultancy Services (NPCS)
AN ISO 9001 : 2015 CERTIFIED COMPANY
106-E, Kamla Nagar,Opposite Spark Mall,
New Delhi-110007, India.
Email: npcs.ei@gmail.com,
info@entrepreneurindia.co
Tel: 91-11-23843955, 23845654, 23845886, +91-8800733955
Mobile: +91-9811043595
Fax: 91-11-23845886
Web: www.entrepreneurindia.co
  • Join Us On
Reach Us
Quick Enquiry
 
   
   
Quick Enquiry
 
 

The construction industry is the second largest industry in India after agriculture. It accounts for about 11% of India’s GDP. It makes significant contribution to the national economy and provides employment to large number of people.Construction constitutes 40% to 50% of India's capital expenditure on projects in various sectors such as highways, roads, railways, energy, airports, irrigation etc.There are mainly three segments in the construction industry like real estate construction which includes residential and commercial construction; infrastructure building which includes roads, railways, power etc; and industrial construction that consists of oil and gas refineries, pipelines, textiles etc.Building material is any material which is used for a construction purpose. Many naturally occurring substances, such as clay, sand, wood and rocks, even twigs and leaves have been used to construct buildings. Apart from naturally occurring materials, many man-made products are in use.

The feasibility of infrastructure projects in ports, roads, airports and railways with private-sector majority ownership is already evident. The government also expects a substantial increase in the share of private sector investments in infrastructure from 19 per cent in the Tenth Plan to around 30 per cent in the Eleventh Plan. The biggest increase in private participation is expected in roads (from 5 per cent to 36), ports (47 per cent to 74 per cent) and railways (less than 1 per cent to 20 per cent). The Planning Commission estimates that the remaining infrastructure investments will be funded by the central and state government. According to a study by ASSOCHAM, the burgeoning Indian construction industry, currently worth $70 billion, will rise to US$120 billion by 2010.

The Commonwealth Games - 2010 in New Delhi have thrown mega opportunities for Building Material Companies, Construction Equipments & Technologies companies. The Govt. of India has permitted FDI up to 100% for development of integrated townships in India last year. India is now the second most favored destination for FDI, behind China. A large and growing middle class population of more than 300 million people, a changing life style, better cost of living etc is growth drivers for this sector.

The Indian construction industry, an integral part of the economyand a conduit for a substantial part of its development investment, is poised for growth on account of industrialization, urbanization, economic development and people's rising expectations for improved quality of living in the coming years.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
S  S  Fasteners
S S Fasteners

S. S. Fasteners (Washers 100% EOU)

 

There are different kinds of fasteners available in the mechanical works... Read More

Capacity : 2.00 MT /Day
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 372.00
Rate of Return (ROR):57.00%
Break Even Point (BEP):23.00 %
TCI :440.00 Lakhs
Cost of Project : 440.00Lakhs
Add To Inquiry Basket
Stone Crusher
Stone Crusher

There are various uses of crushed stones, in rail road ballast, laying of roads, in concrete, plastering etc. The reduction of materials such as st... Read More

Capacity : 616 CUM/ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.72%
Break Even Point (BEP):52.87 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Mini Cement Plant
Mini Cement Plant

The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Admixtures for Concrete
Admixtures for Concrete

Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in t... Read More

Capacity : 2000 Kgs/Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 134.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):41.00 %
TCI :160.00 Lakhs
Cost of Project : 160.00Lakhs
Add To Inquiry Basket
Bricks From Fly Ash
Bricks From Fly Ash

Bricks may be made from a no. of different kinds of materials but they must usually posses a certain amount of plasticity. Fly ash is one of them. ... Read More

Capacity : 250 Lacs Nos/Annum
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 62.00
Rate of Return (ROR):27.16%
Break Even Point (BEP):65.69 %
TCI :158.00 Lakhs
Cost of Project : 158.00Lakhs
Add To Inquiry Basket
Granite (Marble) Polishing Batti (Bar)
Granite (Marble) Polishing Batti (Bar)

Marble polishing batti is an essential item in the marble and granite polishing industries. Now a days there is good market demand of granite and m... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.63%
Break Even Point (BEP):40.77 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Cement Water Proofing Compound
Cement Water Proofing Compound

Cement is a very important building material. It is used in almost all the constructions and is subjected to water in contact. If the concrete or c... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.28%
Break Even Point (BEP):48.99 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Granite Marble Cutting and Polishing Unit
Granite Marble Cutting and Polishing Unit

The use of granite and other decorative stones has been increasing world over. India is endowed with vast deposits of these natural resources and i... Read More

Capacity : 100 Sq. M./Day
Plant and Machinery cost: 168.00 Lakhs
Working Capital : 151.00
Rate of Return (ROR):47.73%
Break Even Point (BEP):42.87 %
TCI :388.00 Lakhs
Cost of Project : 388.00Lakhs
Add To Inquiry Basket
Plaster of Paris
Plaster of Paris

Plaster of paris is a white hygroscopic powder having formula CaSo4? H2O is obtained by the calcination of gypsum. Plaster of paris is extensively ... Read More

Capacity : 50 MT / Day 1500 MT / Annum
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):45.00 %
TCI :300.00 Lakhs
Cost of Project : 300.00Lakhs
Add To Inquiry Basket
Asphaltic Roofing Sheet
Asphaltic Roofing Sheet

Shelter is a basic need of the human specis. It is one of the basic rights which any human being may claim. Housing remains one of the crucial prob... Read More

Capacity : 3000 Sq.mt/Day
Plant and Machinery cost: 59.00 Lakhs
Working Capital : 31.00
Rate of Return (ROR):45.16%
Break Even Point (BEP):47.64 %
TCI :167.00 Lakhs
Cost of Project : 167.00Lakhs
Add To Inquiry Basket
Welding Electrode
Welding Electrode

Welding Electrodes are used in welding various metals in the fabrication of equipment for chemical and allied industries, construction of steel str... Read More

Capacity : 1200 MT/Annum (Welding Rods)
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):40.00 %
TCI :165.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Steel Bars (Saria) Size 6 mm  to 32 mm
Steel Bars (Saria) Size 6 mm to 32 mm

-

Read More
Capacity : 3000 MT/Annum
Plant and Machinery cost: 332.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):50.00 %
TCI :533.00 Lakhs
Cost of Project : 533.00Lakhs
Add To Inquiry Basket
Mini Steel Plant with Production of Construction Bars
Mini Steel Plant with Production of Construction Bars

Modern steels vary greatly in their compositions, mechanical properties and it may be assumed that nearly all steel is produced for the benefit of ... Read More

Capacity : 200 MT/Day
Plant and Machinery cost: 1160.00 Lakhs
Working Capital : 1577.00
Rate of Return (ROR):94.00%
Break Even Point (BEP):40.00 %
TCI :3255.00 Lakhs
Cost of Project : 3255.00Lakhs
Add To Inquiry Basket
Particle Board
Particle Board

Particle boards are substitute of solid wood and plywood. Due to the growing deforestation, the natural wood is becoming more and more scare. Parti... Read More

Capacity : 160 Nos./ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.89%
Break Even Point (BEP):49.59 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Granite Tiles, Slab and Monuments
Granite Tiles, Slab and Monuments

Granite Slab and Tiles are mainly used for wall paneling and facades. Today in Europe and in Western Countries and in India, architect and builders... Read More

Capacity : 1000.00 Tiles/Day & 100 Monument/Day, 5 Slab/Day
Plant and Machinery cost: 182.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):45.00 %
TCI :488.00 Lakhs
Cost of Project : 488.00Lakhs
Add To Inquiry Basket
Water Proofing Liquid And Powder (Concrete And Mortar Admixture)
Water Proofing Liquid And Powder (Concrete And Mortar Admixture)

The invention of air entraining agents in 1939 has been termed a revolutionary development in concrete technology. The basic function of an air-ent... Read More

Capacity : 2 MT/Day
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 62.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):64.00 %
TCI :123.00 Lakhs
Cost of Project : 123.00Lakhs
Add To Inquiry Basket
High Mast Poles
High Mast Poles

High mast poles are newly ventured high pillars for using high mast lighting, flood lighting, sports lighting, traffic signals, street lighting etc... Read More

Capacity : 9000 Nos./ANNUM
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):71.00 %
TCI :484.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
CEMENT PLANT
CEMENT PLANT

The general outlook for the cement industry is fulfilled the situation in a large body of Indian Industry, with a market rise in production failing... Read More

Capacity : 500 MT/Day OR 10,000 BAGS/DAY
Plant and Machinery cost: 476.00 Lakhs
Working Capital : 606.00
Rate of Return (ROR):68.00%
Break Even Point (BEP):35.00 %
TCI :1307.00 Lakhs
Cost of Project : 1307.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
S S Fasteners 2.00 MT /Day 57.00 440.00
Stone Crusher 616 CUM/ Day 53.72 0.00
Mini Cement Plant 0 0.00 0.00
Admixtures for Concrete 2000 Kgs/Day 52.00 160.00
Bricks From Fly Ash 250 Lacs Nos/Annum 27.16 158.00
Granite (Marble) Polishin... 33.63 0.00
Cement Water Proofing Com... 0 39.28 0.00
Granite Marble Cutting an... 100 Sq. M./Day 47.73 388.00
Plaster of Paris 50 MT / Day 1500 MT / Annum 49.00 300.00
Asphaltic Roofing Sheet 3000 Sq.mt/Day 45.16 167.00
Welding Electrode 1200 MT/Annum (Welding Rods) 49.00 165.00
Steel Bars (Saria) Size 6... 3000 MT/Annum 44.00 533.00
Mini Steel Plant with Pro... 200 MT/Day 94.00 3255.00
Particle Board 160 Nos./ Day 52.89 0.00
Granite Tiles, Slab and M... 1000.00 Tiles/Day & 100 Monument/Day, 5 Slab/Day 44.00 488.00
Water Proofing Liquid And... 2 MT/Day 46.00 123.00
High Mast Poles 9000 Nos./ANNUM 44.00 484.00
CEMENT PLANT 500 MT/Day OR 10,000 BAGS/DAY 68.00 1307.00
CEMENT PROJECT 500 MT/Day OR 10,000 BAGS/DAY 68.00 1307.00
Prestressed Concrete Slee... 500 Nos./Day 56.00 514.00
Bricks From Fly Ash 83333 Nos./Day 40.80 192.00
Sand lime Bricks Manufact... 60000 Nos./Day 53.00 182.00
Crushed Stone 150.00 Tonnes/day 61.00 190.00
Admixtures for Concrete 500 kg. Air Entraining Admix, 500 kg. Accelerating Admixture, 500 kg. Retarding Admixture, 500 kg. W 51.00 162.00
Bitumen 20 Tonne/day 41.00 71.00
Cement From Rice Husk 50 MT/day 28.00 203.00
Meter Gauge Concrete Slee... 100.00 NOS/day 45.00 254.00
Alumina to Aluminium and ... Aluminium Bar 40000 MT, Aluminium Profiles 20000( Per Annum) 38.00 0.00
GLASS SHEET (AUTOMATIC PL... 15 MT/Day 58.00 279.00
CLAY AND SAND BRICKS PLAN... 60 Lakhs Bricks /Annum 41.00 135.00
12345678
« Back1 2 3 4 5Next »

Showing 1 - 18 of 236 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR