A sock is an item of clothing worn on the feet. The foot is among the heaviest producers of sweat in the body, as it can produce over 0.25 US pints (0...
|
Capacity : Cotton Socks:600 Doz Pairs/Day •Nylon Socks:400 Doz Pairs/Day |
Plant and Machinery cost: Rs 255 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.43 |
|
Break Even Point (BEP): 55.18 |
TCI : Cost of Project:Rs 440 Lakhs |
|
Cost of Project : 44000000 |
Many fast food items have flooded the markets but noodles have emerged as the most popular item as it is cheaper, very easy to make and nutritious. Ur...
|
Capacity : Instant Noodles (75 gms Pouches):5000 Kgs/Day |
Plant and Machinery cost: Rs 125 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.83 |
|
Break Even Point (BEP): 54.21 |
TCI : Cost of Project:Rs 386 Lakhs |
|
Cost of Project : 386 |
A double wall pipe is the most common corrugated pipe design for drainage and sewage. Various different designs of pipes are available, such as single...
|
Capacity : 20 Mt/Day |
Plant and Machinery cost: Rs 808 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.25 |
|
Break Even Point (BEP): 51.34 |
TCI : Cost of Project:Rs 1510 Lakhs |
|
Cost of Project : 151000000 |
Shrink sleeve labels are sleeves constructed from film material that, rather than using adhesive, shrinks to a product’s surface when heat is applied....
|
Capacity : PVC Shrink Sleeves:400 Pkts/Day |
Plant and Machinery cost: Rs 72 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 13.16 |
|
Break Even Point (BEP): 66.91 |
TCI : Cost of Project:Rs 202 Lakhs |
|
Cost of Project : 20200000 |
PET-bottles more and more replace glass bottles in the beverage and food sector. The success of PET in comparison to glass is based on several economi...
|
Capacity : 24 Mt/Day |
Plant and Machinery cost: Rs 290 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.84 |
|
Break Even Point (BEP): 64.95 |
TCI : Cost of Project:Rs 737 Lakhs |
|
Cost of Project : 73700000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : Cows: 250 Nos • Pasturised Milk (1 Ltr & 500 ml Packs):6000 Ltrs/Day •Curd (250 ml Cups & Pouch Packs):4000 Ltrs/ Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 47.38 |
TCI : Cost of Project:Rs 605 Lakhs |
|
Cost of Project : 60500000 |
In modern steelmaking and casting plants, steel is produced either in a basic oxygen furnace (BOF) or in an electric arc furnace (EAF). In a BOF, hot...
|
Capacity : 12 Mt/Day |
Plant and Machinery cost: Rs 8 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.59 |
|
Break Even Point (BEP): 64.56 |
TCI : Cost of Project:Rs 77 Lakhs |
|
Cost of Project : 7700000 |
Wood plastic composites (WPCs) are roughly 50:50 mixtures of thermoplastic polymers and small wood particles. The wood and thermoplastics are usually...
|
Capacity : 4923 Sq. Ft/Day |
Plant and Machinery cost: Rs 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.67 |
|
Break Even Point (BEP): 54.70 |
TCI : Cost of Project:Rs 557 Lakhs |
|
Cost of Project : 55700000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 40000 Pcs/Day |
Plant and Machinery cost: Rs 140 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 210 Lakhs (Land & Building) |
|
Cost of Project : 21000000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 80000 blade & Scalpel / Day |
Plant and Machinery cost: Rs 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.50 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 320 Lakhs (Land & Building not covered) |
|
Cost of Project : 3200000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 80000 Pcs/Day |
Plant and Machinery cost: Rs 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.50 |
|
Break Even Point (BEP): 50.00 |
TCI : Rs 320 Lakhs (Land & Building not covered) |
|
Cost of Project : 32000000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 84 Seats Double Screen |
Plant and Machinery cost: Rs 152 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 14.95 |
|
Break Even Point (BEP): 62.49 |
TCI : Cost of Project:Rs 463 Lakhs |
|
Cost of Project : 46300000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 164 Seats Single Screen |
Plant and Machinery cost: Rs 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.38 |
|
Break Even Point (BEP): 59.39 |
TCI : Cost of Project:Rs 343 Lakhs |
|
Cost of Project : 34300000 |
Concrete is most vital material in modern construction. It has versatile properties like easy mouldability, high compressive strength and long lasting...
|
Capacity : Ready Mix Concrete : 62.5 Cu Mt/Day •Stone Crusher:62.5 Cu Mt/Day |
Plant and Machinery cost: Rs 234 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.39 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project:Rs 762 Lakhs |
|
Cost of Project : 76200000 |
Spices are used for flavour, colour, aroma and preservation of food or beverages. Spices may be derived from many parts of the plant: bark, buds, flow...
|
Capacity : Chilli Oil :20 Kgs/Day •Chilli Oleoresin:60 Kgs/Day |
Plant and Machinery cost: Rs 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.91 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 147 Lakhs |
|
Cost of Project : 14700000 |
Laundry detergent, or washing powder, is a type of detergent (cleaning agent) that is added for cleaning laundry. In common usage, "detergent" refers...
|
Capacity : Detergent Powder: 3.2 MT/Day •Liquid Washing Soap:3.2 MT/Day •Toilet Cleaner:3.2 MT/Day •Scouring Powder:3.2 MT/Day •Stain Remover Liquid:3.2 MT/Day |
Plant and Machinery cost: Rs 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.24 |
|
Break Even Point (BEP): 74.26 |
TCI : Cost of Project:Rs 185 Lakhs |
|
Cost of Project : 18500000 |