Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from the word "kopra" which...
|
Capacity : 600 Tons/Annum |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 94 Lakhs |
|
Cost of Project : 0 |
Coconut oil, also known as coconut butter, is a tropical oil with many applications. It is extracted from copra (derived from the word "kopra" which...
|
Capacity : 600 Tons/Annum |
Plant and Machinery cost: 19 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 94 Lakhs |
|
Cost of Project : 0 |
There is significant increase in demand for pre-coated galvanized sheet-for industrial, storage and warehousing projects. In USA & Europe 55% Alumini...
|
Capacity : 15 MT / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 793 Lakhs |
|
Cost of Project : 0 |
Cellulose is one of the most abundant organic compounds on earth. It is the main component of higher plant cell. Cellulose considered in three forms:...
|
Capacity : 8 MT / Day |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 761 Lakhs |
|
Cost of Project : 0 |
Cooling tower is industrial equipment which is generally used in industry to change the state of Hot Water in which heat is extracted from water and...
|
Capacity : 2 Nos. / Day |
Plant and Machinery cost: 24 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project : 305 Lakh |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by-glucosidric linkages. Industrially starch is divided into tw...
|
Capacity : Starch 100 MT, Liquid Glucose 2 MT,Dextrose Anhydrous 10 MT, Monohydrate 13 MT,Sorbital 17 MT, Vitamin C 0.5 MT/Day |
Plant and Machinery cost: 714 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 3969 Lakhs |
|
Cost of Project : 0 |
The term activated carbon, active carbon or active charcoal is usually applied to amorphous carbons possessing higher absorption capacities than wood...
|
Capacity : 20 Ton / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 581 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1.0 MT/Day |
Plant and Machinery cost: Rs. 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Rs. 247 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 4 MT/Day |
Plant and Machinery cost: Rs. 31 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Rs. 167 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1000 MT/Annum |
Plant and Machinery cost: Rs. 194 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Rs. 598 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 834 Nos./day |
Plant and Machinery cost: Rs. 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 1179 Lakhs |
|
Cost of Project : 0 |
The foundation of the modern Indian pharmaceutical industry was laid at the start of the current century in 1901, a small factory known as the Bengal...
|
Capacity : - |
Plant and Machinery cost: 258 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 740 Lakhs |
|
Cost of Project : 0 |
Steel is a generic name for a group of ferrous metals due to their abundance durability versatility and low costs are most useful metallic material k...
|
Capacity : 1,00,000 MT / Annum |
Plant and Machinery cost: 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 2808 Lakhs |
|
Cost of Project : 0 |
Caramel color is one of the most widely used colorants in foods. It is also called the color of burnt sugar. It is made by heating food grade carbohyd...
|
Capacity : 300 MT / Annum |
Plant and Machinery cost: 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 113 Lakh |
|
Cost of Project : 0 |
The materials now available for packaging are paper and paper products, metal containers and foils, glass, plastics-rigid and flexible, cellulose film...
|
Capacity : 2000 Nos./Day |
Plant and Machinery cost: 22 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 96 Lakhs |
|
Cost of Project : 0 |
Thermo Mechanical Treatment (TMT) is a term used to describe a variety of process combining controlled thermal and deformation treatment to obtain syn...
|
Capacity : 50,000 MT/Annum |
Plant and Machinery cost: 310 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 1189 Lakhs |
|
Cost of Project : 0 |
The most common crystalline soluble silicates are of the metasilicate family Na2. NH2O. The anhydrous sodium metasilicate Na2 SiO3 contains SiO2 Ch...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: 82 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 612 Lakh |
|
Cost of Project : 0 |
Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a co...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs. 282 Lakhs |
|
Cost of Project : 28200000 |