Rubber is polymer of butadiene and one of the most important chemical ingredients, which is widely used in the different field of modern advance world...
|
Capacity : Rubber Powder : 5.0 MT/day •By Product Steel Wire : 1.4 MT/day |
Plant and Machinery cost: Rs 116 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs 246 Lakhs |
|
Cost of Project : 24600000 |
Man has always been keen to keep himself free from all miseries. It has been a constant endeavor to discover better ways to prevent and cure human dis...
|
Capacity : Chyawanprash: 500.0 Kgs/Day•Cough Syrup (Herbal): 200.0 Kgs/Day•Ayurvedic Hair Oil: 200.0 Kgs/Day•Jawahar Mohra Tablets :1.0 Kgs/Day•Mukta Shukti Tablets: 1.0 Kgs/Day |
Plant and Machinery cost: Rs 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs 474 Lakhs |
|
Cost of Project : 47400000 |
Activated carbon, also called activated charcoal, activated coal, or carbo activatus, is a form of carbon processed to be riddled with small, low-volu...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs 251 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 578 Lakhs |
|
Cost of Project : 57800000 |
Petroleum, oily, flammable liquid that occurs naturally in deposits, usually beneath the surface of the earth; it is also called crude oil. It consist...
|
Capacity : Gasoline: 200 MT/Day•Naphtha: 150 MT/Day•Middle Distillate: 150 MT/Day•Lube Oil : 250 MT/Day •Asphalt: 150 MT/Day |
Plant and Machinery cost: Rs 19722 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs 24965 Lakhs |
|
Cost of Project : 2496500000 |
Generally, pencil sharpeners can be classified into electric pencil sharpeners and manual pencil sharpeners. Since the electric pencil sharpeners are...
|
Capacity : 5000 Pcs/Day |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : Rs 24 Lakhs |
|
Cost of Project : 2400000 |
An optical fiber (or optical fibre) is a flexible, transparent fiber made of extruded glass (silica) or plastic, slightly thicker than a human hair. I...
|
Capacity : 50 KMeters/Day |
Plant and Machinery cost: Rs 3563 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs 4266 Lakhs |
|
Cost of Project : 426600000 |
The onion, also known as the bulb onion or common onion, is used as a vegetable and is the most widely cultivated species of the genus Allium. Onions...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs 70 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : Rs 396 Lakhs |
|
Cost of Project : 39600000 |
Light Liquid Paraffin Oil IP is highly purified mixture of liquid saturated hydrocarbons obtained from petroleum and is highly paraffinic in nature. L...
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs 1085 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs 1560 Lakhs |
|
Cost of Project : 156000000 |
The manufacture of modern structural honeycombs probably began in the late 1930s when J. D. Lincoln manufactured Kraft paper honeycomb for use in the...
|
Capacity : Paper Board:2.50 MT/Day•Paper Partitions:2.50 MT/Day•Paper Pallets:2.50 MT/Day•5 Ply Corrugated Boxes:2.50 MT/Day |
Plant and Machinery cost: Rs 214 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 480 Lakhs |
|
Cost of Project : 48000000 |
PVC flex is made out of PVC and fabric raw material, specially designed for solvent printing industry. It is suitable for indoor and outdoor printing...
|
Capacity : PVC Flex Banner (Frontlit/Backlit) 440 g/m2:13 MT/Day•PVC Flex Banner Vinyl 440 g/m2:12 MT/Day |
Plant and Machinery cost: Rs 832 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project Rs 1208 Lakhs |
|
Cost of Project : 120800000 |
Education is today identified among basic needs, as essential for an individual’s survival as ‘food, clothing and shelter.’ The need for education has...
|
Capacity : Total Students per Annum:750 Students/Annum |
Plant and Machinery cost: Rs 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 578 Lakhs |
|
Cost of Project : 57800000 |
Technical textiles are defined as textile materials and products used primarily for their technical performance and functional properties rather than...
|
Capacity : 96000 Pcs/Day |
Plant and Machinery cost: Rs 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 325 Lakhs |
|
Cost of Project : 32500000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature requir...
|
Capacity : Cold Storage (Service On Rent): 5,000.0 Kgs./ Day•Ice Slab (120 Kgs each Ice Slab):40.0 Slab / Day |
Plant and Machinery cost: Rs 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 243 Lakhs |
|
Cost of Project : 24300000 |
Barley Malt is germinated cereal grains that have been dried in a process known as "malting". The grains are made to germinate by soaking in water, an...
|
Capacity : 100MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 1672 Lakhs |
|
Cost of Project : 167200000 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sys...
|
Capacity : 30000 Nos./Day |
Plant and Machinery cost: Rs 426 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1465 Lakhs |
|
Cost of Project : 146500000 |
1,1,1,2,3,3,3-Heptafluoropropane, also called heptafluoropropane, HFC-227 or HFC-227ea (ISO name), is a colourless, odourless gaseous halocarbon commo...
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs 116 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 1108 Lakhs |
|
Cost of Project : 110800000 |
Acetylene (C2H2) is known as one of the simplest and most significant chemical in the acetylene series. A compound of carbon and hydrogen, acetylene i...
|
Capacity : 360 M3/Day |
Plant and Machinery cost: Rs 68 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs 260 Lakhs |
|
Cost of Project : 26000000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : - |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs 527 Lakhs |
|
Cost of Project : 52700000 |