Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Leather is considered as a symbol of fashion, uniqueness, trend and styles. The demand for quality leather products as well as accessories never cease...
|
Capacity : - |
Plant and Machinery cost: Rs 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.37 |
|
Break Even Point (BEP): 58.01 |
TCI : Cost of Project: Rs 264 Lakhs |
|
Cost of Project : 26400000 |
There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolifera...
|
Capacity : Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day |
Plant and Machinery cost: Rs 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.82 |
|
Break Even Point (BEP): 63.96 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
Azadirachta indica (Neem) tree belongs to the Meliaceae family. It is a multipurpose and an evergreen tree, 12–18 m tall, which can grow in almost all...
|
Capacity : Neem Oil : 5 MT/Day, Neem Cake as By Product : 42 MT/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.74 |
|
Break Even Point (BEP): 62.91 |
TCI : Cost of Project: Rs 320 Lakhs |
|
Cost of Project : 32000000 |
Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chemical formula as other...
|
Capacity : 25 MT/Day |
Plant and Machinery cost: Rs 715 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.65 |
|
Break Even Point (BEP): 52.58 |
TCI : Cost of Project: Rs 1138 Lakhs |
|
Cost of Project : 113800000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile. Technical textiles are defined as textile materials and pr...
|
Capacity : Sanitary Napkins Ultra Thin Type: 15000 Pkts/Day, Sanitary Napkins Cotton Core Type: 15000 Pkts/Day |
Plant and Machinery cost: Rs 345 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.92 |
|
Break Even Point (BEP): 40.85 |
TCI : Cost of Project : Rs 755 Lakhs |
|
Cost of Project : 75500000 |
The cashew tree (Anacardium occidentale) is a tropical evergreen tree that produces the cashew nut and the cashew apple. It can grow as high as 14 met...
|
Capacity : Cashew Nuts: 600 Kgs/Day, Cashew Nut Shell by product: 1650 Kgs/Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.45 |
|
Break Even Point (BEP): 56.36 |
TCI : Cost of Project: Rs 126 Lakhs |
|
Cost of Project : 12600000 |
The paprika oleoresins are produced by solvent extraction of dried, ground red pepper fruits, using a solvent-system compatible with the lipophilic/hy...
|
Capacity : 250 Kgs/Day |
Plant and Machinery cost: Rs 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.41 |
|
Break Even Point (BEP): 57.07 |
TCI : Cost of Project: Rs 238 Lakhs |
|
Cost of Project : 23800000 |
Grey Oxide, The chemical name of Lead Suboxide is called as 2PbO.Pb and is available in grey colored powder. Lead Suboxide is also called as Battery o...
|
Capacity : 48 MT/Day |
Plant and Machinery cost: Rs 250 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.72 |
|
Break Even Point (BEP): 55.05 |
TCI : Cost of Project: Rs 878 Lakhs |
|
Cost of Project : 87800000 |
There are many kinds of plastics in the world, any plastics when react with the Blowing Agent will become "Foam" which generally called "Foam Plastics...
|
Capacity : Glasses: 324000 Glasses/Day, Plates: 162000 Plates/Day |
Plant and Machinery cost: Rs 73 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Rs 245 Lakhs |
|
Cost of Project : 0 |