The auto and auto components remain largely one of the most fantastic and viable opportunities for small scale investors and entrepreneurs. The extensive and rising vehicle population across two wheelers, passenger cars, commercial vehicles, agricultural machines is expected to translate into fast-growing demand for various components and spares. Once again, start-ups could consider entry through OEM supply chains, aftermarket supplies, or for export markets. This means that the industry is somewhat multi-moated in terms of modular capital intensity.  Once more, both basic and high-value parts production is relatively more technically advanced due to the availability of metal and polymer processing and electronics integration.

 Reasons to start in this sector

  • All the aforementioned advantages tremendously enhance the financial opportunity of the sector. 
  • To be specific, large, diverse demand can also be interpreted as two-wheelers, passenger vehicles, commercial cars, and agriculture machinery’s parts. Aftermarket flexibility means basically that even if vehicle sales are weak, recovery and service components steadily offer. 
  • Moderate to steep technological entry points cover the fact that at first, you only need metal-working and polymer-processing machines; however, you fastly encourage value-added components but especially outer bodies. 
  • Export and OEM linkage ability would imply that when the community of cluster suppliers assembled, they can order prepared manufactures from OEMs or aftermarket construction. 
  • Moreover, governmental and institutional endorsement means that project reports, manufacturing centre, and commune commencement consulting is possible  that would help to overpower the challenge of beginning. 
  • Lastly, vertical integration opportunity suggests that if commence from produce part , e.g. brackets, clamps, etc., then after a couple of years grow to assembly or subassembly line.In financial strategies, these are forecasted; however, the sector has a really good view, because supply is stable, service products are high-profitable, and entry costs are mild to elevated. Thus, right producers are anticipated to stimulate rivalry.

Market Demand

  • Vehicle population enhancement – with rising numbers of both personal and commercial cars, the demand for spares and replacement will also rise. 
  • Aftermarket sustainability – due to slow vehicle sales cycles, the demand for expenditure and re-expenditure service items will not vary greatly. 
  • OEM & Tier-1 demand – the automotive industry gives the opportunity to suppliers of original components and subservience. 
  • Exports – while India has grown in cost competition and skilled manpower availability, many vehicle producers have chosen it as a worldwide sourcing hub. 
  • Technological usage – new materials, many additional sensors, wire harnesses, electronics and so on, are also contributing to the expanding need for more sophisticated components. 
  • Fleet & commercial sector – particularly as the transport and taxis and on-call taxi operators trip at the same time, the demand for extra repeat services and expanding amps.

In conclusion, the sector is characterized by high resilience evident from not only the largely recurring demand in the domestic market but of the international markets too no matter the economic state, and the potential extensive profit margins are the evidence for startups.

Government support

  • Manufacturing subsidies, by the title of the specific local governments; capital subsidy programs for MSME, again by title and country according to the law; Export incentive, and cluster development funding, by title and country/sector. 
  • Regulatory TouchPoint would be factory registration; surface finishing environmental approval; labor law, and product safety and motor vehicle standards e.g. the national motor vehicle part standards requirements, or the quality standard ISO/TS. In addition, taxonomy and duties that may affect result-financed Airport safety regulations are import duties on individual components, by jurisdiction., 
  • The GST/VAT system, and exporters’ concessional schemes, including those under your territory's jurisdiction, would be subject to statute. Consult your local tax authority for the specific percent.

In conclusion, the presented industry of Indian automotive/auto spare parts has a long life cycle stage, high scalability opportunities, and profitability. Considering that the vehicle market is continuously growing, and the demand for auto aftermarket services is relatively stable, the new enterprise would have an opportunity to sustain cash flows. Phased investment not demanding significant working capital might be financed wholly or partially via governmental funding programs. Moreover, the new company may obtain higher profits than expected due to the modest selected offerings, i.e., electronic systems, which increase the level of value addition many times. With the given sector’s high dynamism and the number of distinct items sold there annually, the new business needs to be present in the auto part/spare manufacturer sector.


 

Automobile Industry and Auto Components, Automotive components, Spare parts, Auto Parts, Car Parts, Replacement Parts, Tractor Parts, Motorcycle Parts, Auto Body Parts, Two Wheeler, Three Wheeler and Four Wheeler Parts, Accessories & Spares Projects

Please choose a project below related to this category.

Helmet Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Helmet Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

A helmet is a form of protective gear worn to protect the head from injuries. The primary goal of a motorcycle helmet is motorcycle safety-to protect...

Capacity :

500 Nos/day

Plant and Machinery cost:

57 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

54.00

TCI :

Cost of Project: 326 lakhs

Cost of Project :

32600000

Aerosol Cans - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Aerosol Cans - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

The aluminium aerosol can has been one of the most popular packaging materials for cosmetics, pharmaceutical and household items for decades. In addit...

Capacity :

Aerosol Cans (200 ml Size):72000 Nos./Day

Plant and Machinery cost:

Rs 182 Lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

55.46

TCI :

Cost of Project:Rs 772 Lakhs

Cost of Project :

77200000

Grey Oxide (used in Automotive & Tubular Battery) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunity
Grey Oxide (used in Automotive & Tubular Battery) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunity

Grey Oxide, The chemical name of Lead Suboxide is called as 2PbO.Pb and is available in grey colored powder. Lead Suboxide is also called as Battery o...

Capacity :

48 MT/Day

Plant and Machinery cost:

Rs 250 Lakhs

Working Capital :

-

Rate of Return (ROR):

27.72

Break Even Point (BEP):

55.05

TCI :

Cost of Project: Rs 878 Lakhs

Cost of Project :

87800000

Tractor Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Tractor Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Tractor is one of the most important farm machineries. We can say that tractor is the forehand of the farming industry. This is the blessing of god as...

Capacity :

Tractors: 84 Nos./Day

Plant and Machinery cost:

Rs 258 Lakhs

Working Capital :

-

Rate of Return (ROR):

35.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project: Rs 1771 Lakhs

Cost of Project :

177100000

Brake Shoe - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Brake Shoe - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

The automobile is unique-technological achievement, which make the distance shorter. With this a far distance is covered in very short time. In develo...

Capacity :

Brake Shoe (Aluminium Based):2000 NOs/Day •Brake Shoe (Mild Steel Based) : 2000 NOs/Day

Plant and Machinery cost:

Rs 49 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

65.00

TCI :

Cost of Project: Rs 148 Lakhs

Cost of Project :

14800000

Latex (Rubber) Foam Product - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Latex (Rubber) Foam Product - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Latex is originally defined as the stable dispersion of natural rubber particles in aqueous medium as produced in the rubber tree. They are complex co...

Capacity :

300 MT /Annum

Plant and Machinery cost:

Rs. 83 Lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project : Rs. 248 Lakhs

Cost of Project :

24800000

Tyres for Truck, Lorry, Bus, Car & Cycle - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Tyres for Truck, Lorry, Bus, Car & Cycle - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

The tyre industry is the largest part of the rubber manufacturing industry, infact it is so large that it is often classed as an industry in its own r...

Capacity :

Truck Tyres: 210000 Nos /Annum,Lorry Tyres: 210000 Nos /Annum,Bus Tyres : 210000 Nos /Annum,Car Tyres: 975000 Nos /Annum,Cycle Tyres: 2437500 Nos /Annum

Plant and Machinery cost:

Rs. 429 Lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

57.00

TCI :

Cost of Project : Rs. 2788 Lakhs

Cost of Project :

278800000

Automobile Tyres for Trucks, Buses and Lorries - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Automobile Tyres for Trucks, Buses and Lorries - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

The tyre and tubes are very important rubber products and widely used everywhere in the world. The statistical production figure available from 1938 e...

Capacity :

480000 Nos./Annum

Plant and Machinery cost:

Rs. 221 Lakhs

Working Capital :

-

Rate of Return (ROR):

33.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project : Rs. 1183 Lakhs

Cost of Project :

118300000

Reclaimed Rubber Sheet from Waste Tyre - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Reclaimed Rubber Sheet from Waste Tyre - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Reclaim Rubber is the de-vulcanized (recycled) old tyre rubber, the cross linkage between the sulphur & rubber are braked at high temperature & pressu...

Capacity :

9000MT/ annum

Plant and Machinery cost:

1058 Lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

59.00

TCI :

Cost of Projects: 1866 Lakhs

Cost of Project :

186600000

Bimetallic and Sintered Bushes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Bimetallic and Sintered Bushes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

The demand of the bushing is dependent on the various sectors like automobile, motors, home appliance etc. The Indian automobile market can be divided...

Capacity :

600000 Nos./Annum

Plant and Machinery cost:

Rs.102 Lakhs

Working Capital :

-

Rate of Return (ROR):

19.00

Break Even Point (BEP):

42.00

TCI :

Cost of Project: Rs.525 Lakhs

Cost of Project :

52500000

Rubber Gaskets - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Rubber Gaskets - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

A gasket (correct terminology is a joint made from jointing material) is a mechanical seal which fills the space between two or more mating surfaces,...

Capacity :

200 kgs/ day

Plant and Machinery cost:

Rs.29 Lakhs

Working Capital :

-

Rate of Return (ROR):

44.00

Break Even Point (BEP):

50.00

TCI :

Rs.165 Lakhs

Cost of Project :

0

TYRES for Truck, Lorry, Bus,Car & Cycle - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
TYRES for Truck, Lorry, Bus,Car & Cycle - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

The tyre industry is the largest part of the rubber manufacturing industry, infact it is so large that it is often classed as an industry in its own...

Capacity :

13475 Nos./ day

Plant and Machinery cost:

Rs.409 Lakhs

Working Capital :

Rate of Return (ROR):

56.00

Break Even Point (BEP):

20.00

TCI :

Rs.17073 Lakhs

Cost of Project :

0