Automobile & Auto Components: Startup Guide for Parts, Spares & Accessories
The auto and auto components remain largely one of the most fantastic and viable opportunities for small scale investors and entrepreneurs. The extensive and rising vehicle population across two wheelers, passenger cars, commercial vehicles, agricultural machines is expected to translate into fast-growing demand for various components and spares. Once again, start-ups could consider entry through OEM supply chains, aftermarket supplies, or for export markets. This means that the industry is somewhat multi-moated in terms of modular capital intensity. Once more, both basic and high-value parts production is relatively more technically advanced due to the availability of metal and polymer processing and electronics integration.
In conclusion, the sector is characterized by high resilience evident from not only the largely recurring demand in the domestic market but of the international markets too no matter the economic state, and the potential extensive profit margins are the evidence for startups.
In conclusion, the presented industry of Indian automotive/auto spare parts has a long life cycle stage, high scalability opportunities, and profitability. Considering that the vehicle market is continuously growing, and the demand for auto aftermarket services is relatively stable, the new enterprise would have an opportunity to sustain cash flows. Phased investment not demanding significant working capital might be financed wholly or partially via governmental funding programs. Moreover, the new company may obtain higher profits than expected due to the modest selected offerings, i.e., electronic systems, which increase the level of value addition many times. With the given sector’s high dynamism and the number of distinct items sold there annually, the new business needs to be present in the auto part/spare manufacturer sector.
Please choose a project below related to this category.
Friction materials like brake linings clutch facing and transformer band are bonded largely with phenolic resins. Automotive applications are the larg...
|
Capacity : 1000 kgs/Day |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : 15 Lakhs |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 48 Lakhs |
|
Cost of Project : 0 |
Tyre is rubber shielded wheel of metal. The maximum use of tyre is captured by the automobile industry, because the automobiles cannot perform their...
|
Capacity : 5,00,000 Tyre / Annum |
Plant and Machinery cost: 279 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 861 Lakhs |
|
Cost of Project : 0 |
Although the lead acid cell was developed by B. Gaston in 1860, it was not until much later when it was adopted by the automobile industry in term of...
|
Capacity : 834 Nos./day |
Plant and Machinery cost: Rs. 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 1179 Lakhs |
|
Cost of Project : 0 |
In the manufacture of inner tubes the plant required is fairly simple and inexpensive, the principal outlay being for wrapping machines and mandrills....
|
Capacity : 1000 Nos./day |
Plant and Machinery cost: Rs. 32 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Rs. 165 lakhs |
|
Cost of Project : 0 |
A lifting hook comprising a suspension part fitted with a suspension shaft, which supports a hook part provided with a slot. A safety latch is pivotal...
|
Capacity : 5 MT/day |
Plant and Machinery cost: Rs. 57 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs. 352 lakhs |
|
Cost of Project : 0 |
Rubber Auto Parts are amongst the important automobile ancillary industries. They are used in various parts of the automobiles. The rubber auto parts...
|
Capacity : 334 Kgs./Day |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 67 Lakhs |
|
Cost of Project : 0 |
Bolts in various dimensions and head-shapes are available. Bolts can be supplied unfinished, semi-finished and fully finished conditions. U-bolts are...
|
Capacity : 5.00 MT./day |
Plant and Machinery cost: Rs. 152 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 436 lakhs |
|
Cost of Project : 0 |
The automobile uses three basic types of spring is coil, leaf and torsion bar. Regardless of the type of spring, all springs work in a similar manner....
|
Capacity : 40 Nos./Day |
Plant and Machinery cost: 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 192 Lakhs |
|
Cost of Project : 0 |
Cork is one of the few naturally grown closed-cell foams that has never been duplicated with synthetic material. The cork oak is unique in that the ou...
|
Capacity : 500 kgs/Day |
Plant and Machinery cost: 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 53 Lakhs |
|
Cost of Project : 0 |
The tyre and tube industry has been continuously in process of upgradation of product quality to satisfy the requirements of Indian automotive manufac...
|
Capacity : 5500 Nos./Day |
Plant and Machinery cost: 210 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 1415 Lakhs |
|
Cost of Project : 0 |
There is competitive growth of rubber gaskets in market. Gasket should be smooth, inert -towards water and normal chemicals, physically strong and sho...
|
Capacity : 200.00 KGS/day |
Plant and Machinery cost: Rs. 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Rs. 60 Lakhs |
|
Cost of Project : 0 |
The vehicle owners should only use the minimum amount of ethylene glycol used based antifreeze to protect the system. The higher concentrate of antifr...
|
Capacity : 30 Lts. Coolant/Day, 300 Lts. Brake Oil/Day, 1000 Lts. Lube/Day, 1000 Lts. Grease/Day |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 70 Lakhs |
|
Cost of Project : 0 |