Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
Tropical fruits are harvested from woody plants (avocado, mango, orange) but also from herbaceous plants (banana, papaya) and vines (passion fruit). T...
|
Capacity : 2800 MT/Annum |
Plant and Machinery cost: Rs. 549 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 1788 Lakhs |
|
Cost of Project : 178800000 |
It is an instrument which is used for injecting any liquid into the body of human beings or of animals. These syringes are used for injecting the medi...
|
Capacity : 180 Lakh Nos. /annum |
Plant and Machinery cost: 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: 455 Lakhs |
|
Cost of Project : 45500000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 210 Lakhs Nos. /annum |
Plant and Machinery cost: Rs. 719 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1736 Lakhs |
|
Cost of Project : 173600000 |
E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : 2164500 kgs. /annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 22.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs. 500 Lakhs |
|
Cost of Project : 50000000 |
Disposable Syringes made of plastic Material have been successfully used in medical and pharmaceutical practice for many years. The constantly increas...
|
Capacity : Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos./Day.,Syringes (10 ml):14,000.0 Nos./Day. |
Plant and Machinery cost: Rs.174 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project :Rs.515 Lakhs. |
|
Cost of Project : 51500000 |
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |
Ready to Eat Meals like already cooked or prepared lunch & dinner are relatively new products which came in market only a few years back and are now s...
|
Capacity : Vegetable Pulao : 3,000 kgs/day,Dal Makhani:2,000 kgs/day,Palak :600 kgs/day, Rajmah:700 kgs/day,Potato Peas:600 kgs/day,Mutter Mushroom:250 kgs/day |
Plant and Machinery cost: Rs.595Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost Of Project: Rs.998 Lakhs |
|
Cost of Project : 99800000 |
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
Vegetables are available during specific seasons and they are perishable. Hence, majority of them are not available during off season. To overcome thi...
|
Capacity : - |
Plant and Machinery cost: Rs.136 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs.675 Lakhs |
|
Cost of Project : 67500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The disposable plastic syringe has become an important part of...
|
Capacity : - |
Plant and Machinery cost: Rs.113 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.288 Lakhs |
|
Cost of Project : 28800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : - |
Plant and Machinery cost: Rs.219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs.489 Lakhs |
|
Cost of Project : 48900000 |