Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 33600 NOS./Day |
Plant and Machinery cost: 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 287 Lakhs |
|
Cost of Project : 28700000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |
A capsule is a shell or a container prepared from gelatin containing one or more medicinal and/or inert substances. The gelatin capsule shell may be s...
|
Capacity : 2880000 Nos. /day |
Plant and Machinery cost: 397 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 637 Lakhs |
|
Cost of Project : 0 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : 16800 Nos. Syringes (2.5 ml size/day),16800 Nos. Syringes/ (5 ml size/day) |
Plant and Machinery cost: 104 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 255 Lakhs |
|
Cost of Project : 25500000 |
Paper is one of the necessities of civilization and it is almost impossible to imagine the continuance of a world without the printed books and newspa...
|
Capacity : - |
Plant and Machinery cost: 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : 595 Lakhs |
|
Cost of Project : 59500000 |
A crucible is a container that can withstand very high temperatures and is used for metal, glass, and pigment production as well as a number of moder...
|
Capacity : 30000 Pcs./ Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : 132 Lakhs |
|
Cost of Project : 13200000 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |
Cashew (Botanical name Anacardium Occidentale) was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. Cashew ran...
|
Capacity : 150 MT/annum |
Plant and Machinery cost: 40 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.18 |
|
Break Even Point (BEP): 38.73 |
TCI : 235 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by the...
|
Capacity : 1354 Lakh Pcs./annum |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.87 |
|
Break Even Point (BEP): 45.83 |
TCI : 216 Lakhs |
|
Cost of Project : 0 |
Sesame is commonly known as Till. Its botanical name is Sesamum indicum L. It is one of the earliest domesticated plants. It is a short duration crop...
|
Capacity : 7.5 MT/day |
Plant and Machinery cost: 198 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.71 |
|
Break Even Point (BEP): 32.90 |
TCI : Cost of Project : 579 lakh |
|
Cost of Project : 57900000 |