The North Region of India is situated in the Jammu and Kashmir (J&K); It's an area endowed with natural beauty, a variety of resources and a geo-economic dominant accent. The “New Industrial Policy 2021” has dawned a promise of the new era of investments and industrial development in the "Paradise on Earth".
J&K Government focusing on sustainable economic development, skill generation and entrepreneurship, films pushed into the employment opportunities which includes Horticulture, Handicrafts, Food Processing, Renewable Energy, IT and Tourism based industries. Such a diverse mix makes it an economic power house but the incentives that feed this growth have to be acknowledged, it’s a performer.
Filled with agro-climatic diversity, available natural resources and special fiscal incentives, J&K has emerged as the most well suited and promising emerging economy in the North Region of India.
1. Strategic location and Connectivity J&K is gateway to Central Asia from India - This strategic location on key trade routes will only be undermined by bad transportation and connectivity With Udhampur-Srinagar-Baramulla Rail Link in place and improved air connectivity to Srinagar, Jammu and Leh, the rest of India along with the world and making the Union sector accessible for importing and exporting.
2. Also the Government has flagged the need to develop the Fazilka-Mumbai trade route early signs This enchanting state has a rich natural resource base comprising a thriving and picturesque landscape and agriculture. It is already practicable, if the state leverages these specifics by practicing proper production techniques then, packaging and exports industries oriented toward production of high value goods like Apples, Saffron, Walnuts, Cherries & Almonds find a boom in the valley.
3. Trained human resource - With a literacy rate of 77%, J&K has a young population much like India poised to be ready tomorrow for jobs in production, trade, tourism, as well as need craftsman mandatory skilled for the production Orient authorities to generate skilled manpower aligned with those project of focus away from old age inclinations such as handicraft, IT, tourism, plant manufacturing and soil management.
4. Political stability Growing Infrastructure - In addition to the havoc wreaked by the dilution of article 370, J&K has seen a significant pour in investments in logistics and industrial estates since 2019 completion of projects like AIIMS Jammu, Srinagar Smart City, Chenab Bridge among others shows that the region is now much more accessible improving its connectivity and also enabling better environment both for public and business.
1) Agriculture and horticulture - J&K accounts for more than 75% of apples grown in India, its horticultural sector representing approximately 10% of GSDP. Furthermore, J&K produces the saffron, walnuts, almonds, apricots, and cherries that serve as the basis for fruit processing, packaging, juice-making, and export operations.
2) Handicrafts and wool - The birthplace of Pashmina shawls and carpets and famous for papier-mâché and woodcarvings, the raw materials and skilled workforce are perfect for craft hubs and eco-design studios, particularly in handicraft e-sale development and exports.
3) Mineral and forest resources - With limestone, gypsum, sapphire, and marble deposits that are used in the cement, ceramics, and construction sectors, J&K possesses significant geologic resources. Its large forest areas and timber, resin, and herbal production industries are other crucial sectors.
Therefore, Jammu and Kashmir’s economy shifts from a heavy reliance on tourism to involve multiple sectors, notably:
Investment IncentivesPackage: The Government of India in collaboration with the J&K administration offers a whole lot of financial and fiscal incentives to investors and entrepreneurs. A few of them include; 30% of the investment in plant and machinery up to ₹5 crore as Capital Investment Incentive Interest Subvention of 6% for 5 years on working capital loans, guaranteed Competent transport subsidy equal to 100% of GST for 10 years, insurance covers subsidized to 100 percent freight subsidizes on all exports and interstate supplies; land allocation at discounted prices in recent industrial properties, workers earning subsidy of ₹5,000 – ₹10,000 per work per month for hiring local workers, an additional 5 % subsidy to female and youth entrepreneurs, and many more. The incentives improve profit margins and decrease capital payback timelines, resulting in Return on Investments of 15% -30% across all sectors
Jammu and Kashmir is in the throes of an impressive economic transformation – that of a single-sector service economy based on tourism into a multi-sectoral industrial powerhouse. Blessed with natural resources, government patronage, development of infrastructure and strategic linkages to markets, the region offers successions of opportunity to entrepreneurs. Whether in fruit processing, handicrafts, tourism, IT, renewable energy, wellness and entertainment, entrepreneurs in J&K could benefit from high-growth ventures with fiscal sops and export potential. With peace and development reimagining the region, Jammu and Kashmir is well on its way to becoming North India’s new frontier of sustainable, profitable and inclusive industrial growth.
Please choose a project below related to this category.
The Sanitary napkin industry is closely connected with the mode of life, which is in turn directly correlated to housing. Accordingly this industry ha...
|
Capacity : 432000 Nos. / Day |
Plant and Machinery cost: Rs. 103 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : Rs. 980 Lakhs |
|
Cost of Project : 98000000 |
Wheat flour is a powder made from the grinding of wheat used for human consumption. More wheat flour is produced than any other flour. Wheat varieties...
|
Capacity : Wheat powder: 9.6 MT/ Day•Puttu: 4.8 MT/ Day•Rice Powder: 9.6 MT/ Day |
Plant and Machinery cost: Rs. 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs. 256 Lakhs |
|
Cost of Project : 25600000 |
Flexible packaging sector in India has emerged as the sea of opportunities for entrepreneurs on the back of its rising popularity. In India and as wel...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Packaging adds value to products for a consumer and has a vital role to play in a product’s journey from manufacturer to end consumers. It is a...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
High density polyethylene or HDPE woven sacks have become a versatile commodity in the packaging industry Introduced for the first time in India durin...
|
Capacity : 71000 Nos./ Day |
Plant and Machinery cost: Rs. 336 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs. 663 Lakhs |
|
Cost of Project : 66300000 |
Beer is the world’s most widely consumed alcoholic beverage; it is the third-most popular drink overall, after water and tea. It is thought by some to...
|
Capacity : Beer (650 ml Bottle): 10000 Nos./ Day,Beer (500 ml Can): 5000 Nos./ Day,Whisky (750 ml Bottle): 10000 Nos./ Day,Rum (750 ml Bottle): 10000 Nos./ Day |
Plant and Machinery cost: Rs. 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 1838 Lakhs |
|
Cost of Project : 183800000 |
Liquefied petroleum gas (LPG) is a term describing a group of hydrocarbon-based gases derived from crude oil and or natural gas. Natural gas purificat...
|
Capacity : L.P.G. Cylinders (14.2 Kgs Size): 180 Nos./Day, L.P.G. Cylinders (19 Kgs Size): 180 Nos./Day |
Plant and Machinery cost: Rs. 310 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs. 547 Lakhs |
|
Cost of Project : 54700000 |
Zinc sulfate is a powder that is colorless and completely water-soluble. The product can be used in different applications, including some connected w...
|
Capacity : 29 MT/ Day |
Plant and Machinery cost: Rs. 169 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs. 438 Lakhs |
|
Cost of Project : 43800000 |
The plastic collapsible tube is a product of daily use because every paste, like thing is packed in this tube. According to an estimate, the populatio...
|
Capacity : 150000 Nos./ Day |
Plant and Machinery cost: Rs. 138 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 396 Lakhs |
|
Cost of Project : 39600000 |
Fruit beverages in India have come a long way since their first forms to find their permanent place in Indian households. Today you will find yourself...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Power Transformers are used in Distribution Network so directly connected to the consumer so load fluctuations are very high. these are not loaded ful...
|
Capacity : 900 Nos. /annum |
Plant and Machinery cost: Rs. 306 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 1024 Lakhs |
|
Cost of Project : 102400000 |
India has made lot of progress in agriculture & food sectors since independence in terms of growth in output, yields and processing. It has gone throu...
|
Capacity : Vegetable Pulao : 900000 Kgs. per annum,Dal Makhani: 600000 Kgs. per annum,Palak: 180000 Kgs. per annum,Rajmah: 210000 Kgs. per annum,Potato Peas: 180000 Kgs. per annum,Mutter Mushroom: 75000 Kgs. per annum |
Plant and Machinery cost: Rs. 596 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project: Rs. 998 Lakhs |
|
Cost of Project : 99800000 |