The North Region of India is situated in the Jammu and Kashmir (J&K); It's an area endowed with natural beauty, a variety of resources and a geo-economic dominant accent. The “New Industrial Policy 2021” has dawned a promise of the new era of investments and industrial development in the "Paradise on Earth".
J&K Government focusing on sustainable economic development, skill generation and entrepreneurship, films pushed into the employment opportunities which includes Horticulture, Handicrafts, Food Processing, Renewable Energy, IT and Tourism based industries. Such a diverse mix makes it an economic power house but the incentives that feed this growth have to be acknowledged, it’s a performer.
Filled with agro-climatic diversity, available natural resources and special fiscal incentives, J&K has emerged as the most well suited and promising emerging economy in the North Region of India.
1. Strategic location and Connectivity J&K is gateway to Central Asia from India - This strategic location on key trade routes will only be undermined by bad transportation and connectivity With Udhampur-Srinagar-Baramulla Rail Link in place and improved air connectivity to Srinagar, Jammu and Leh, the rest of India along with the world and making the Union sector accessible for importing and exporting.
2. Also the Government has flagged the need to develop the Fazilka-Mumbai trade route early signs This enchanting state has a rich natural resource base comprising a thriving and picturesque landscape and agriculture. It is already practicable, if the state leverages these specifics by practicing proper production techniques then, packaging and exports industries oriented toward production of high value goods like Apples, Saffron, Walnuts, Cherries & Almonds find a boom in the valley.
3. Trained human resource - With a literacy rate of 77%, J&K has a young population much like India poised to be ready tomorrow for jobs in production, trade, tourism, as well as need craftsman mandatory skilled for the production Orient authorities to generate skilled manpower aligned with those project of focus away from old age inclinations such as handicraft, IT, tourism, plant manufacturing and soil management.
4. Political stability Growing Infrastructure - In addition to the havoc wreaked by the dilution of article 370, J&K has seen a significant pour in investments in logistics and industrial estates since 2019 completion of projects like AIIMS Jammu, Srinagar Smart City, Chenab Bridge among others shows that the region is now much more accessible improving its connectivity and also enabling better environment both for public and business.
1) Agriculture and horticulture - J&K accounts for more than 75% of apples grown in India, its horticultural sector representing approximately 10% of GSDP. Furthermore, J&K produces the saffron, walnuts, almonds, apricots, and cherries that serve as the basis for fruit processing, packaging, juice-making, and export operations.
2) Handicrafts and wool - The birthplace of Pashmina shawls and carpets and famous for papier-mâché and woodcarvings, the raw materials and skilled workforce are perfect for craft hubs and eco-design studios, particularly in handicraft e-sale development and exports.
3) Mineral and forest resources - With limestone, gypsum, sapphire, and marble deposits that are used in the cement, ceramics, and construction sectors, J&K possesses significant geologic resources. Its large forest areas and timber, resin, and herbal production industries are other crucial sectors.
Therefore, Jammu and Kashmir’s economy shifts from a heavy reliance on tourism to involve multiple sectors, notably:
Investment IncentivesPackage: The Government of India in collaboration with the J&K administration offers a whole lot of financial and fiscal incentives to investors and entrepreneurs. A few of them include; 30% of the investment in plant and machinery up to ₹5 crore as Capital Investment Incentive Interest Subvention of 6% for 5 years on working capital loans, guaranteed Competent transport subsidy equal to 100% of GST for 10 years, insurance covers subsidized to 100 percent freight subsidizes on all exports and interstate supplies; land allocation at discounted prices in recent industrial properties, workers earning subsidy of ₹5,000 – ₹10,000 per work per month for hiring local workers, an additional 5 % subsidy to female and youth entrepreneurs, and many more. The incentives improve profit margins and decrease capital payback timelines, resulting in Return on Investments of 15% -30% across all sectors
Jammu and Kashmir is in the throes of an impressive economic transformation – that of a single-sector service economy based on tourism into a multi-sectoral industrial powerhouse. Blessed with natural resources, government patronage, development of infrastructure and strategic linkages to markets, the region offers successions of opportunity to entrepreneurs. Whether in fruit processing, handicrafts, tourism, IT, renewable energy, wellness and entertainment, entrepreneurs in J&K could benefit from high-growth ventures with fiscal sops and export potential. With peace and development reimagining the region, Jammu and Kashmir is well on its way to becoming North India’s new frontier of sustainable, profitable and inclusive industrial growth.
Please choose a project below related to this category.
An adhesive is any substance applied to the surfaces of materials that binds them together and resists separation. The term "adhesive" may be used int...
|
Capacity : Contact Adhesive: 160 Kgs/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 220 Lakhs |
|
Cost of Project : 22000000 |
The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being very...
|
Capacity : - |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 192 Lakhs |
|
Cost of Project : 19200000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : - |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs 527 Lakhs |
|
Cost of Project : 52700000 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sys...
|
Capacity : 30000 Nos./Day |
Plant and Machinery cost: Rs 426 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1465 Lakhs |
|
Cost of Project : 146500000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature requir...
|
Capacity : Cold Storage (Service On Rent): 5,000.0 Kgs./ Day•Ice Slab (120 Kgs each Ice Slab):40.0 Slab / Day |
Plant and Machinery cost: Rs 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 243 Lakhs |
|
Cost of Project : 24300000 |
Technical textiles are defined as textile materials and products used primarily for their technical performance and functional properties rather than...
|
Capacity : 96000 Pcs/Day |
Plant and Machinery cost: Rs 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 325 Lakhs |
|
Cost of Project : 32500000 |
Education is today identified among basic needs, as essential for an individual’s survival as ‘food, clothing and shelter.’ The need for education has...
|
Capacity : Total Students per Annum:750 Students/Annum |
Plant and Machinery cost: Rs 20 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project : Rs 578 Lakhs |
|
Cost of Project : 57800000 |
PVC flex is made out of PVC and fabric raw material, specially designed for solvent printing industry. It is suitable for indoor and outdoor printing...
|
Capacity : PVC Flex Banner (Frontlit/Backlit) 440 g/m2:13 MT/Day•PVC Flex Banner Vinyl 440 g/m2:12 MT/Day |
Plant and Machinery cost: Rs 832 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project Rs 1208 Lakhs |
|
Cost of Project : 120800000 |
The manufacture of modern structural honeycombs probably began in the late 1930s when J. D. Lincoln manufactured Kraft paper honeycomb for use in the...
|
Capacity : Paper Board:2.50 MT/Day•Paper Partitions:2.50 MT/Day•Paper Pallets:2.50 MT/Day•5 Ply Corrugated Boxes:2.50 MT/Day |
Plant and Machinery cost: Rs 214 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 480 Lakhs |
|
Cost of Project : 48000000 |
An optical fiber (or optical fibre) is a flexible, transparent fiber made of extruded glass (silica) or plastic, slightly thicker than a human hair. I...
|
Capacity : 50 KMeters/Day |
Plant and Machinery cost: Rs 3563 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs 4266 Lakhs |
|
Cost of Project : 426600000 |
Generally, pencil sharpeners can be classified into electric pencil sharpeners and manual pencil sharpeners. Since the electric pencil sharpeners are...
|
Capacity : 5000 Pcs/Day |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : Rs 24 Lakhs |
|
Cost of Project : 2400000 |
Man has always been keen to keep himself free from all miseries. It has been a constant endeavor to discover better ways to prevent and cure human dis...
|
Capacity : Chyawanprash: 500.0 Kgs/Day•Cough Syrup (Herbal): 200.0 Kgs/Day•Ayurvedic Hair Oil: 200.0 Kgs/Day•Jawahar Mohra Tablets :1.0 Kgs/Day•Mukta Shukti Tablets: 1.0 Kgs/Day |
Plant and Machinery cost: Rs 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs 474 Lakhs |
|
Cost of Project : 47400000 |