The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
Concrete is most vital material in modern construction. It has versatile properties like easy mouldability, high compressive strength and long lasting...
|
Capacity : Ready Mix Concrete : 62.5 Cu Mt/Day •Stone Crusher:62.5 Cu Mt/Day |
Plant and Machinery cost: Rs 234 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.39 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project:Rs 762 Lakhs |
|
Cost of Project : 76200000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 164 Seats Single Screen |
Plant and Machinery cost: Rs 112 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.38 |
|
Break Even Point (BEP): 59.39 |
TCI : Cost of Project:Rs 343 Lakhs |
|
Cost of Project : 34300000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 84 Seats Double Screen |
Plant and Machinery cost: Rs 152 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 14.95 |
|
Break Even Point (BEP): 62.49 |
TCI : Cost of Project:Rs 463 Lakhs |
|
Cost of Project : 46300000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 80000 Pcs/Day |
Plant and Machinery cost: Rs 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.50 |
|
Break Even Point (BEP): 50.00 |
TCI : Rs 320 Lakhs (Land & Building not covered) |
|
Cost of Project : 32000000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 80000 blade & Scalpel / Day |
Plant and Machinery cost: Rs 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.50 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 320 Lakhs (Land & Building not covered) |
|
Cost of Project : 3200000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 40000 Pcs/Day |
Plant and Machinery cost: Rs 140 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 210 Lakhs (Land & Building) |
|
Cost of Project : 21000000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 500 Cu. Mt/Day |
Plant and Machinery cost: Rs 542 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.36 |
|
Break Even Point (BEP): 50.87 |
TCI : Cost of Project:Rs 1187 Lakhs |
|
Cost of Project : 118700000 |
Wood plastic composites (WPCs) are roughly 50:50 mixtures of thermoplastic polymers and small wood particles. The wood and thermoplastics are usually...
|
Capacity : 4923 Sq. Ft/Day |
Plant and Machinery cost: Rs 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.67 |
|
Break Even Point (BEP): 54.70 |
TCI : Cost of Project:Rs 557 Lakhs |
|
Cost of Project : 55700000 |
In modern steelmaking and casting plants, steel is produced either in a basic oxygen furnace (BOF) or in an electric arc furnace (EAF). In a BOF, hot...
|
Capacity : 12 Mt/Day |
Plant and Machinery cost: Rs 8 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.59 |
|
Break Even Point (BEP): 64.56 |
TCI : Cost of Project:Rs 77 Lakhs |
|
Cost of Project : 7700000 |
In India dairying has been practiced as a rural cottage industry since the remote past. Semi commercial dairying started with the establishment of mil...
|
Capacity : Cows: 250 Nos • Pasturised Milk (1 Ltr & 500 ml Packs):6000 Ltrs/Day •Curd (250 ml Cups & Pouch Packs):4000 Ltrs/ Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.72 |
|
Break Even Point (BEP): 47.38 |
TCI : Cost of Project:Rs 605 Lakhs |
|
Cost of Project : 60500000 |
PET-bottles more and more replace glass bottles in the beverage and food sector. The success of PET in comparison to glass is based on several economi...
|
Capacity : 24 Mt/Day |
Plant and Machinery cost: Rs 290 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.84 |
|
Break Even Point (BEP): 64.95 |
TCI : Cost of Project:Rs 737 Lakhs |
|
Cost of Project : 73700000 |