The first group includes the following main resources:
Entrepreneurs can target high-potential sectors that align with Karnataka’s competitive advantages:
However, Karnataka typically provides the sectoral and region-specific facilitations as follows:
- Single-window clearance and industry facilitation agencies for approvals, land allotment;
- sectoral incentives (electronics, biotech, aerospace, EVs) like capital subsidies, interest reimbursement, GST/tax concessions in approved cases;
- industrial land and plug-and-play facilities via state industrial development authorities, and private industrial parks;
- R&D and incubation grants, testing labs, and skill-development partnerships to speed up tech commercialization.
That long innovation velocity of a leading global tech center mature, though mature manufacturing clusters and heartland rural agricultural zones like us.
A competitive advantage that is virtually a hybrid one which would involve both the intensive start-ups of knowledge as well as manufacturing/processing projects. Additionally and beside the above, there is technology, biotechnology, aerospace, electronics, green power, and agro-value addition as far as either of which go, some scaling options and supportive public-private even for those at the level of angel investors and keyword the entrepreneur ventures that are already favored.
Please choose a project below related to this category.
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 30000 MT /Annum |
Plant and Machinery cost: Rs. 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : Rs. 857 Lakhs |
|
Cost of Project : 85700000 |
Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.Technical textiles are defined as textile materials and pro...
|
Capacity : 1296 Lakh Nos. /Annum |
Plant and Machinery cost: Rs. 103 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 36.00 |
TCI : Cost of Project : Rs 980 Lakhs |
|
Cost of Project : 98000000 |
The Word "PAPPAD" is quite familiar with Indians. Pappad is a common Indian food normally taken with meals. Some people take it along with tea also. I...
|
Capacity : 75000 Kgs /Annum |
Plant and Machinery cost: Rs. 15 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : Rs. 34 Lakhs |
|
Cost of Project : 3400000 |
While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable pr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 14400 MT /Annum |
Plant and Machinery cost: Rs. 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs. 202 Lakhs |
|
Cost of Project : 20200000 |
A syringe is a simple piston pump consisting of a plunger that fits tightly in a tube. The plunger can be pulled and pushed along inside a cylindrical...
|
Capacity : Syringes (2 ml) : 90 Lakh Nos. /Annum,Syringes (5 ml) : 90 Lakh Nos. /Annum |
Plant and Machinery cost: Rs. 245 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 455 Lakhs |
|
Cost of Project : 45500000 |
Latex is originally defined as the stable dispersion of natural rubber particles in aqueous medium as produced in the rubber tree. They are complex co...
|
Capacity : 300 MT /Annum |
Plant and Machinery cost: Rs. 83 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs. 248 Lakhs |
|
Cost of Project : 24800000 |
The tyre industry is the largest part of the rubber manufacturing industry, infact it is so large that it is often classed as an industry in its own r...
|
Capacity : Truck Tyres: 210000 Nos /Annum,Lorry Tyres: 210000 Nos /Annum,Bus Tyres : 210000 Nos /Annum,Car Tyres: 975000 Nos /Annum,Cycle Tyres: 2437500 Nos /Annum |
Plant and Machinery cost: Rs. 429 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs. 2788 Lakhs |
|
Cost of Project : 278800000 |
Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of si...
|
Capacity : 225 Lakh Pouches/Annum |
Plant and Machinery cost: Rs. 33 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs. 308 Lakhs |
|
Cost of Project : 30800000 |
Egg is one of the most versatile and near perfect foods in nature. It is rich in protein, amino-acids, vitamins and most mineral substances, the yolk...
|
Capacity : 717900 Kgs /Annum,Egg Powder: 690000 Kgs /Annum,Egg Shell Powder (bye Product): 27900 Kgs /Annum |
Plant and Machinery cost: Rs. 804 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs. 1118 Lakhs |
|
Cost of Project : 111800000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : 3389100 Kgs. /Annum |
Plant and Machinery cost: Rs. 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs. 527 Lakhs |
|
Cost of Project : 52700000 |
Corn flakes being one of most nutritious foods and is consumed as breakfast food not only in India but-elsewhere in the world. Basically, it is prepar...
|
Capacity : 1500 MT/Annum |
Plant and Machinery cost: Rs. 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project : Rs. 341 Lakhs |
|
Cost of Project : 34100000 |