To this extent, the data has provided entrepreneurs and investors with some sectors to consider that are highly potential depending on the comparative advantage of Kerala. They include;
1. Indonesia’s increase in packaged foods, healthcare, digital services, and wellness tourism purchases fueled by increased purchasing power i.e. the country’s growing middle-class population were the countries that purchased more of the products and services in the prior period.
2. Thailand’s extract-based growth including seafood, spiced, and rubber at an export orientation i.e. the country prepared for the post-pandemic upsurge in demand and integration into the international market.
3. Rising demand from various countries for wellness tourism and ecotourism, which could reflect in supplements or expeditions if products are supplements and cross-border or domestic in the others.
4. The endorsement of crisis recovery and economic development leads to increased demand for travel.
5. Growth in domestic demand for eco, bio, and context-based foods and environmentally friendly production lines. Many companies turned to energy obtained from renewable sources.
The following are offered by the Government of Kerala:
To sum up, Kerala is undeniably a synthesis of natural endowments, manpower, policy support, and potential for sustainable development. Be it agro-processing through tourism and wellness to information technology, health care, and renewable energy, investable opportunities in the low-risk state are bound to result in high rewards. Gunning for the future through its industrial policy and infrastructure and grounded on sustainability, Kerala is a venerable among India’s foremost hopefuls concerning the corruption of entrepreneurship and innovation and industrialization.
Please choose a project below related to this category.
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.22 |
|
Break Even Point (BEP): 48.23 |
TCI : Cost of Project: Rs 869 Lakhs |
|
Cost of Project : 86900000 |
A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...
|
Capacity : Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day |
Plant and Machinery cost: Rs 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.28 |
|
Break Even Point (BEP): 63.08 |
TCI : Cost of Project: Rs 392 Lakhs |
|
Cost of Project : 39200000 |
There has been a dramatic increase in the number of reverse osmosis and nano-filtration plant over the past ten years. There has also been a prolifera...
|
Capacity : Capacity Antiscalants: 5MT/Day, Membrane Cleaners: 5 MT/Day |
Plant and Machinery cost: Rs 88 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.82 |
|
Break Even Point (BEP): 63.96 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
Leather is considered as a symbol of fashion, uniqueness, trend and styles. The demand for quality leather products as well as accessories never cease...
|
Capacity : - |
Plant and Machinery cost: Rs 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.37 |
|
Break Even Point (BEP): 58.01 |
TCI : Cost of Project: Rs 264 Lakhs |
|
Cost of Project : 26400000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 1387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 1802 Lakhs |
|
Cost of Project : 180200000 |