To this extent, the data has provided entrepreneurs and investors with some sectors to consider that are highly potential depending on the comparative advantage of Kerala. They include;
1. Indonesia’s increase in packaged foods, healthcare, digital services, and wellness tourism purchases fueled by increased purchasing power i.e. the country’s growing middle-class population were the countries that purchased more of the products and services in the prior period.
2. Thailand’s extract-based growth including seafood, spiced, and rubber at an export orientation i.e. the country prepared for the post-pandemic upsurge in demand and integration into the international market.
3. Rising demand from various countries for wellness tourism and ecotourism, which could reflect in supplements or expeditions if products are supplements and cross-border or domestic in the others.
4. The endorsement of crisis recovery and economic development leads to increased demand for travel.
5. Growth in domestic demand for eco, bio, and context-based foods and environmentally friendly production lines. Many companies turned to energy obtained from renewable sources.
The following are offered by the Government of Kerala:
To sum up, Kerala is undeniably a synthesis of natural endowments, manpower, policy support, and potential for sustainable development. Be it agro-processing through tourism and wellness to information technology, health care, and renewable energy, investable opportunities in the low-risk state are bound to result in high rewards. Gunning for the future through its industrial policy and infrastructure and grounded on sustainability, Kerala is a venerable among India’s foremost hopefuls concerning the corruption of entrepreneurship and innovation and industrialization.
Please choose a project below related to this category.
It is difficult to conceive the contemporary architecture without glass.Glass is a non-crystalline amorphous solid that is often transparent and has w...
|
Capacity : 384000 Sq.Mt./Annum |
Plant and Machinery cost: Rs. 280 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs. 729 lakhs |
|
Cost of Project : 72900000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : 15,000CBM/annum |
Plant and Machinery cost: Rs. 1213 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : RS. 2050 lakhs |
|
Cost of Project : 205000000 |
A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface, increases paint durabilit...
|
Capacity : 360,000Ltrs/Annum |
Plant and Machinery cost: Rs. 13 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project : Rs. 42 lakhs |
|
Cost of Project : 4200000 |
Jeans are trousers, a type of garment, typically made from denimor dungareecloth. They come in many styles and colors. Jeans are dyed in every color o...
|
Capacity : Readymede Garment (Jeans) : 120,000 Pcs/Annum |
Plant and Machinery cost: Rs. 35 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 415 lakhs |
|
Cost of Project : 41500000 |
Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is received as rice, br...
|
Capacity : Precipitated Silica: 3,000 MT/Annum Activated Carbon (by product): 810MT/Annum Sodium Carbonate (by product): 1,200MT/Annum |
Plant and Machinery cost: Rs. 526 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs. 786 lakhs |
|
Cost of Project : 78600000 |
The coconut is the most extensively grown and used nut in the world and the most important palm. The export of coconut and coconut products from India...
|
Capacity : 720 MT/Annum |
Plant and Machinery cost: Rs. 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs. 171 lakhs |
|
Cost of Project : 17100000 |
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Milk: 1,800,000 Ltrs/Annum Curd : 360,000 Ltrs /Annum Butter Milk: 345,600 Ltrs /Annum Cheese: 36,000 kg /Annum Ghee: 14,400 |
Plant and Machinery cost: Rs. 581 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs. 2047 lakhs |
|
Cost of Project : 204700000 |
Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from rail...
|
Capacity : Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500 MT/Annum Laminated Aluminium Foil Insulation Grade Aluminium Foil: 1,500 MT/Annum |
Plant and Machinery cost: Rs. 1340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs. 2717 lakhs |
|
Cost of Project : 271700000 |
Thermocol has a particular characteristic: it gives the hand a sensation of velvety softness not experienced in contact with traditional types of plas...
|
Capacity : Thermocol Cups: 108,000 Th.Pcs/Annum Thermocol Glasses: 108,000 Th.Pcs/Annum Thermocol Plates: 21,600Th.Pcs/Annum |
Plant and Machinery cost: Rs. 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs. 211 lakhs |
|
Cost of Project : 21100000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. When diapers become soiled, they require changin...
|
Capacity : Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts/annum |
Plant and Machinery cost: 1029 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: 1657 lakhs |
|
Cost of Project : 165700000 |
MIG Wire is Copper coated strong wire. MIG wires are applied to weld numerous ferrous and non-ferrous materials and give sound results Solid copper co...
|
Capacity : MIG Welding Wire : 12000 MT/annum |
Plant and Machinery cost: 921 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 2052 lakhs |
|
Cost of Project : 205200000 |
It is difficult to conceive the contemporary architecture without glass. Glass is a non-crystalline amorphous solid that is often transparent and has...
|
Capacity : Glass Sheet: 1000500 Sq.Mt/annum |
Plant and Machinery cost: 919 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 14.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 1742 lakhs |
|
Cost of Project : 174200000 |