To this extent, the data has provided entrepreneurs and investors with some sectors to consider that are highly potential depending on the comparative advantage of Kerala. They include;
1. Indonesia’s increase in packaged foods, healthcare, digital services, and wellness tourism purchases fueled by increased purchasing power i.e. the country’s growing middle-class population were the countries that purchased more of the products and services in the prior period.
2. Thailand’s extract-based growth including seafood, spiced, and rubber at an export orientation i.e. the country prepared for the post-pandemic upsurge in demand and integration into the international market.
3. Rising demand from various countries for wellness tourism and ecotourism, which could reflect in supplements or expeditions if products are supplements and cross-border or domestic in the others.
4. The endorsement of crisis recovery and economic development leads to increased demand for travel.
5. Growth in domestic demand for eco, bio, and context-based foods and environmentally friendly production lines. Many companies turned to energy obtained from renewable sources.
The following are offered by the Government of Kerala:
To sum up, Kerala is undeniably a synthesis of natural endowments, manpower, policy support, and potential for sustainable development. Be it agro-processing through tourism and wellness to information technology, health care, and renewable energy, investable opportunities in the low-risk state are bound to result in high rewards. Gunning for the future through its industrial policy and infrastructure and grounded on sustainability, Kerala is a venerable among India’s foremost hopefuls concerning the corruption of entrepreneurship and innovation and industrialization.
Please choose a project below related to this category.
The Mega Food Park is an inclusive concept which is aimed at establishing direct linkages from the farm to processing and on to the consumer markets,...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its daily protein requirement. Indi...
|
Capacity : Pigeon peas : 4,000 MT/ annum Lentil: 4,000 MT/annum Chickpeas: 4,000 MT/annum |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 542 lakhs |
|
Cost of Project : 54200000 |
A Holiday resort is a self-contained commercial establishment that endeavors to provide most of a vacationer's wants, such as food, drink, lodging, sp...
|
Capacity : Double Bed Rooms Accomodation 60 Rooms (60%): 12,960 Nos./annum Resort Foods and Ammenities: 10,800 Nos./annum Restaurant: 216,000 Nos./annum Bar: 36,000 Nos./annum Banquet (Main) Lawn Area Mix &: 90,000 Nos/annum Dinning (60 Days in Year) 1500 Person/day |
Plant and Machinery cost: Rs 120 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 1549 lakhs |
|
Cost of Project : 154900000 |
Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...
|
Capacity : 2,400,000 Kg/annum |
Plant and Machinery cost: Rs 126 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 561 lakhs |
|
Cost of Project : 56100000 |
Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-use of nutrient water supplie...
|
Capacity : Tomatoes: 500 MT/annum Peas: 45MT/annum Cucumber: 70MT/annum |
Plant and Machinery cost: Rs 22 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs188 lakhs |
|
Cost of Project : 18800000 |
Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...
|
Capacity : Activated Carbon : 600 MT/annum |
Plant and Machinery cost: Rs 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : Rs 245 lakhs |
|
Cost of Project : 24500000 |
An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...
|
Capacity : Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum |
Plant and Machinery cost: Rs 442 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 6777 lakhs |
|
Cost of Project : 677700000 |
Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing concern of the ecological ba...
|
Capacity : 120,000 Pcs/annum |
Plant and Machinery cost: Rs 1509 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1970 lakhs |
|
Cost of Project : 197000000 |
The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...
|
Capacity : Ampoules 5 ml Size: 300,000 Th. Nos./annum Ampoules 10 ml Size: 260,000 Th. Nos./annum Ampoules 20 ml Size: 120,000 Th. Nos./annum |
Plant and Machinery cost: Rs 607 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 917 lakhs |
|
Cost of Project : 91700000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |