For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Electric Resistance Welded (ERW) steel pipes and tubes are used in various engineering purposes, fencing, scaffolding, line pipes etc. ERW steel pipes...
|
Capacity : ERW Pipes (Black): 18000MT/Annum |
Plant and Machinery cost: Rs 1637 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 3129 lakhs |
|
Cost of Project : 312900000 |
The Mega Food Park is an inclusive concept which is aimed at establishing direct linkages from the farm to processing and on to the consumer markets,...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its daily protein requirement. Indi...
|
Capacity : Pigeon peas : 4,000 MT/ annum Lentil: 4,000 MT/annum Chickpeas: 4,000 MT/annum |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 542 lakhs |
|
Cost of Project : 54200000 |
A Holiday resort is a self-contained commercial establishment that endeavors to provide most of a vacationer's wants, such as food, drink, lodging, sp...
|
Capacity : Double Bed Rooms Accomodation 60 Rooms (60%): 12,960 Nos./annum Resort Foods and Ammenities: 10,800 Nos./annum Restaurant: 216,000 Nos./annum Bar: 36,000 Nos./annum Banquet (Main) Lawn Area Mix &: 90,000 Nos/annum Dinning (60 Days in Year) 1500 Person/day |
Plant and Machinery cost: Rs 120 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 1549 lakhs |
|
Cost of Project : 154900000 |
Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...
|
Capacity : 2,400,000 Kg/annum |
Plant and Machinery cost: Rs 126 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 561 lakhs |
|
Cost of Project : 56100000 |
Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-use of nutrient water supplie...
|
Capacity : Tomatoes: 500 MT/annum Peas: 45MT/annum Cucumber: 70MT/annum |
Plant and Machinery cost: Rs 22 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs188 lakhs |
|
Cost of Project : 18800000 |
Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...
|
Capacity : Activated Carbon : 600 MT/annum |
Plant and Machinery cost: Rs 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : Rs 245 lakhs |
|
Cost of Project : 24500000 |
An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...
|
Capacity : Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum |
Plant and Machinery cost: Rs 442 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 6777 lakhs |
|
Cost of Project : 677700000 |
Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing concern of the ecological ba...
|
Capacity : 120,000 Pcs/annum |
Plant and Machinery cost: Rs 1509 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1970 lakhs |
|
Cost of Project : 197000000 |
The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...
|
Capacity : Ampoules 5 ml Size: 300,000 Th. Nos./annum Ampoules 10 ml Size: 260,000 Th. Nos./annum Ampoules 20 ml Size: 120,000 Th. Nos./annum |
Plant and Machinery cost: Rs 607 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 917 lakhs |
|
Cost of Project : 91700000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |