For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Casting other than a pipe, which allows pipeline deviation, change of direction or bore. In addition flanged-sockets, flanged-spigots and collars are...
|
Capacity : Pipe Adopter:2 MT/Day •Pipe Elbow :2 MT/Day •Pipe Flange :2 MT/Day •Pipe Union : 2 MT/Day •Pipe Reducer : 2 MT/Day •Pipe Tee:2 MT/Day |
Plant and Machinery cost: Rs 254 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.67 |
|
Break Even Point (BEP): 60.85 |
TCI : Cost of Project :Rs 946 Lakhs |
|
Cost of Project : 94600000 |
The cashew nut is served as a snack or used in recipes, like other nuts, although it is actually a seed. The cashew apple is a fruit, whose pulp can b...
|
Capacity : Flavoured Cashew Nut:500 kgs/Day •Flavoured Peanut:500 kgs/Day |
Plant and Machinery cost: Rs 117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.46 |
|
Break Even Point (BEP): 57.66 |
TCI : Cost of Project : Rs 215 Lakhs |
|
Cost of Project : 21500000 |
Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...
|
Capacity : 20 MT/Day |
Plant and Machinery cost: Rs 97 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.90 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs 343 Lakhs |
|
Cost of Project : 34300000 |
Iron oxide and oxide-hydroxide are widespread in nature, play an important role in many geological and biological processes, and are widely utilized b...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Maltodextrin is a mixture of glucose, maltose, oligosaccharides and polysaccharides. Maltodextrin is 15 to 20% dextrose equivalent and is produced by...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Laundry detergent, or washing powder, is a type of detergent (cleaning agent) that is added for cleaning laundry. In common usage, "detergent" refers...
|
Capacity : Detergent Powder:3.2 MT/day•Liquid Washing Soap:3.2 MT/day •Toilet Cleaner:3.2 MT/day •Perfumed Bleach: 3.2 MT/day •Stain Remover Liquid:3.2 MT/day |
Plant and Machinery cost: Rs 72 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project:Rs 210 Lakhs |
|
Cost of Project : 21000000 |
A carbonated drink is a drink that bubbles and fizzes with carbon dioxide gas. The process by which the gas dissolves in the drink is known as carbona...
|
Capacity : Carbonated Drinks: 25000 Bottles/Day •Non Carbonated Drinks: 25000 Bottles/Day |
Plant and Machinery cost: Rs 249 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project:Rs 1162 Lakhs |
|
Cost of Project : 116200000 |
The health food drink market in India is approx. 300,000 MT per annum and is growing at the rate of around 15% per annum. The health food drinks are p...
|
Capacity : 30 MT/Day |
Plant and Machinery cost: Rs 284 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.54 |
|
Break Even Point (BEP): 55.85 |
TCI : Cost of Project:Rs 1024 Lakhs |
|
Cost of Project : 102400000 |
Packing, in a way represents the extent of industrialization of a country. Packaging has been assuming importance in the context of growth of industri...
|
Capacity : 10000 Nos/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.38 |
|
Break Even Point (BEP): 60.35 |
TCI : Cost of Project:Rs 171 Lakhs |
|
Cost of Project : 17100000 |
Woven fabric is a textile formed by weaving. It is produced on a loom, and made of many threads woven on a warp and a weft. Woven polypropylene/HDPE b...
|
Capacity : 300000 Nos/Day |
Plant and Machinery cost: Rs 396 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.76 |
|
Break Even Point (BEP): 57.26 |
TCI : Cost of Project:Rs 1231 Lakhs |
|
Cost of Project : 123100000 |
A sanitary napkin or a sanitary towel is an absorbent item used by a woman while she is menstruating or in any other situation where it is necessary t...
|
Capacity : 30000 Packets/Day |
Plant and Machinery cost: Rs 199 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.50 |
|
Break Even Point (BEP): 40.44 |
TCI : Cost of Project:Rs 585 Lakhs |
|
Cost of Project : 58500000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/Day •Micronutrients Fertilizer for Citrus: 500 Kgs/Day |
Plant and Machinery cost: Rs 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project:Rs 30 Lakhs |
|
Cost of Project : 3000000 |