For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Wire means Solid conductor or Insulated conductor which has strength and with cover or without cover and Cable means Insulated conductor (Solid or Str...
|
Capacity : Aluminium Wire (AAAC) Conductor: 900 MT/Annum Aluminium Wire (ACSR) Conductor: 400 MT/Annum Aluminium Cables: 450MT/Annum |
Plant and Machinery cost: Rs 314 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : Rs 579 lakhs |
|
Cost of Project : 57900000 |
The adhesive industry has seen significant changes in recent years. The type and number of these changes have been astounding. They include new substr...
|
Capacity : Pure Epoxy Resin with Curing Agent : 9000000 Kgs/Annum |
Plant and Machinery cost: Rs 162 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: Rs 698 lakhs |
|
Cost of Project : 69800000 |
Fulvic acid is a part of the humic structure in rich composting soil. It is an acid created in extremely small amounts by the action of millions of be...
|
Capacity : 1200 MT/Annum |
Plant and Machinery cost: Rs 42 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs 160 lakhs |
|
Cost of Project : 16000000 |
To improve the organic contents of soils for growing crops there are some applications such as planting rotation, various plough techniques, green fer...
|
Capacity : 1200MT/annum |
Plant and Machinery cost: Rs 62 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: Rs182 lakhs |
|
Cost of Project : 18200000 |
Feeding a population of 9 billion people in 2050 will rely upon the availability of plant nutrients commensurate with the necessary increase in produc...
|
Capacity : 3600 MT/annum |
Plant and Machinery cost: Rs 177 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 498 lakhs |
|
Cost of Project : 49800000 |
Around 800 large Flour Mills in the country convert about 10.5 Million Tons of wheat into wheat products i.e., Coarse Flour, Flour, Semolina, Bran & W...
|
Capacity : Maida: 16500 MT/annum Sooji : 9900 MT/annum Wheat Flour: 41400 MT/annum Bran: 14700 MT/annum |
Plant and Machinery cost: Rs 1648 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 2660 lakhs |
|
Cost of Project : 266000000 |
Starch is the most abundant reserve polysaccharide in plants. Today, the main sources of starch extraction are tubers, roots and seeds, primarily from...
|
Capacity : Maize Starch: 11520MT/Annum Germs: 1170MT/Annum Gluten: 990MT/Annum Fiber: 2520MT/Annum |
Plant and Machinery cost: Rs 1790 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 2749 lakhs |
|
Cost of Project : 274900000 |
Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in sterilized...
|
Capacity : Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 10 ml Siz : 300,000 Boxes/Annum |
Plant and Machinery cost: Rs 802 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 1474 lakhs |
|
Cost of Project : 147400000 |
The requirements of growing population are growing at rapid rate with the rate of population. People are searching for more space for their enhancing...
|
Capacity : Sale of High Rise Apartments Construct Floor Area: 81,200 Units/Annum Maintenance Charages for High Rise Apartments: 81,200 Units/Annum Sale of Villas : 55 Units/Annum Maintenance Charages of Villas: 55 Units/Annum |
Plant and Machinery cost: Rs 665 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 18.00 |
TCI : Cost of Project: Rs 55792 lakhs |
|
Cost of Project : 5579200000 |
Tomatoes are widely consumed and worldwide cultivated. They are one of the most important crops around the world. It is one of the most important food...
|
Capacity : Tomato Ketchup (500 gms Size Glass Bottle) : 600,000 Kgs/Annum Tomato Sauce (500 gms Size Glass Bottle): 600,000 Kgs/Annum Tomato Soup (50 gms Size Pouch) : 300,000 Kgs/Annum |
Plant and Machinery cost: Rs 387 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 686 lakhs |
|
Cost of Project : 68600000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. In spite of that per capita availability of fruits and...
|
Capacity : 12000 Mt/Annum |
Plant and Machinery cost: Rs 92 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 342lakhs |
|
Cost of Project : 342100000 |
Toothpaste is a paste or gel to be used with a toothbrush to maintain and improve oral health and aesthetics. Earlier oralHygienewasthedomainof local...
|
Capacity : 300,000 Kgs/Annum |
Plant and Machinery cost: Rs 100 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 249 lakhs |
|
Cost of Project : 24900000 |