For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
The coconut is the most extensively grown and used nut in the world and the most important palm. Coconut Production plays an important role in the nat...
|
Capacity : 75,000 Kgs/Annum |
Plant and Machinery cost: Rs 36 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 151 lakhs |
|
Cost of Project : 15100000 |
Electricity play a vital role in the development and growth of Agriculture and Industry, as it is a high priority item for all the developing or devel...
|
Capacity : 3,500MT/Annum |
Plant and Machinery cost: 107 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 691lakhs |
|
Cost of Project : 691100000 |
Virgin coconut oil (VCO) is the purest form of coconut oil. Introduced onto the world market at the end of the 20th century, it is one of the highest...
|
Capacity : Virgin Coconut Oil (Packed in 1 Ltr Glass Bottle): 90,000Ltrs/Annum |
Plant and Machinery cost: Rs 63 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 195 lakhs |
|
Cost of Project : 19500000 |
Tile is a manufactured piece of hard-wearing material such as clay, ceramic, stone, metal or even glass. It is a surfacing unit, used for covering roo...
|
Capacity : 1200,000Sq.Mtrs./Annum |
Plant and Machinery cost: Rs 1218 lakh |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 2573 lakhs |
|
Cost of Project : 257300000 |
Ferro-chrome, along with nickel (ferro-nickel) is the major alloying element in the production of stainless steel. Stainless steel is used in a variet...
|
Capacity : Low Carbon Ferrochrome : 15,000 MT/Annum |
Plant and Machinery cost: Rs 1472 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 4001 |
|
Cost of Project : 400100000 |
Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of stee...
|
Capacity : Low Carbon Silicomanganese: 15,000 MT/Annum |
Plant and Machinery cost: Rs 1422 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 3936 lakhs |
|
Cost of Project : 393600000 |
High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which it...
|
Capacity : Low Carbon Ferromanganes : 15,000 MT/Annum |
Plant and Machinery cost: Rs 371 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 2804 lakhs |
|
Cost of Project : 280400000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choice...
|
Capacity : Copper Powder : 15,000 MT/Annum |
Plant and Machinery cost: Rs 307 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs3050 lakhs |
|
Cost of Project : 305000000 |
Manganese is a key component in the production of steel. Although classified as a minor metal, the quantity of manganese produced worldwide each year...
|
Capacity : Manganese Metal: 15,000 MT/Annum |
Plant and Machinery cost: Rs 663 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 2553 lakhs |
|
Cost of Project : 255300000 |
A wet wipe, also known as a wet towel, or a moist towelette, is a small moistened piece of paper that often comes folded and individually wrapped for...
|
Capacity : Baby Wet Wipes (100 Pcs/ Pkt.) : 3,600,000 Pkts/Annum Facial Wet Tissues (30 Pcs/ Pkt.): 3,600,000 Pkts/Annum |
Plant and Machinery cost: Rs 142 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 842 lakhs |
|
Cost of Project : 84200000 |
Fruit pulp is prepared from selected varieties of fruits. Fully matured fruits are harvested and quickly transported to the fruit processing plant. Th...
|
Capacity : Mango Pulp : 1200 MT/Annum Guava Pulp: 1200 MT/Annum Pomegranate Pulp: 1200 MT/Annum Papaya Pulp: 1200 MT/Annum |
Plant and Machinery cost: Rs 66 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project: Rs 379 lakhs |
|
Cost of Project : 37900000 |
Edible oils are a major source of nutrition. The fatty acids in edible oils are required by the body as a vehicle for carrying vitamins, and they prov...
|
Capacity : Sunflower Oil : 5,000,000 Kgs/Annum Groundnut Oil : 5,000,000 Kgs/Annum Rice Bran Oil: 5,000,000 Kgs/Annum |
Plant and Machinery cost: Rs 806 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs 1718 lakhs |
|
Cost of Project : 171800000 |