For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
A mattress is a large pad for supporting the reclining body, used as or on a bed. Mattresses may consist of a quilted or similarly fastened case, usua...
|
Capacity : Mattress 200 Nos/Day, Quilt:1000 Nos/Day |
Plant and Machinery cost: Rs 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 364 Lakhs |
|
Cost of Project : 36400000 |
An adhesive is any substance applied to the surfaces of materials that binds them together and resists separation. The term "adhesive" may be used int...
|
Capacity : Contact Adhesive: 160 Kgs/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 10.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project: Rs 220 Lakhs |
|
Cost of Project : 22000000 |
The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being very...
|
Capacity : - |
Plant and Machinery cost: Rs 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 192 Lakhs |
|
Cost of Project : 19200000 |
Control of fertility continues to be an important issue through the world even though the population growth rate has shown a steady decline in many co...
|
Capacity : 116,666.7 Pcs /Day |
Plant and Machinery cost: Rs 139 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs 400 Lakhs |
|
Cost of Project : 40000000 |
Bitumen is defined as “A viscous liquid, or a solid, consisting essentially of hydrocarbons and their derivatives, which is soluble in trichloro-ethye...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project :Rs 372 Lakhs |
|
Cost of Project : 37200000 |
Garlic is one of the important bulb crops grown and used as spice and condiment throughout India. It possesses a high nutritive value and medicinal pr...
|
Capacity : Garlic Oil :25.0 Kgs/ Day •Garlic Powder as bye Product: 5 MT /Day |
Plant and Machinery cost: Rs 53 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 311 Lakhs |
|
Cost of Project : 31100000 |
Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing businesse...
|
Capacity : - |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs 527 Lakhs |
|
Cost of Project : 52700000 |
Acetylene (C2H2) is known as one of the simplest and most significant chemical in the acetylene series. A compound of carbon and hydrogen, acetylene i...
|
Capacity : 360 M3/Day |
Plant and Machinery cost: Rs 68 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs 260 Lakhs |
|
Cost of Project : 26000000 |
Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The sys...
|
Capacity : 30000 Nos./Day |
Plant and Machinery cost: Rs 426 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 1465 Lakhs |
|
Cost of Project : 146500000 |
Barley Malt is germinated cereal grains that have been dried in a process known as "malting". The grains are made to germinate by soaking in water, an...
|
Capacity : 100MT/Day |
Plant and Machinery cost: Rs 408 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 1672 Lakhs |
|
Cost of Project : 167200000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature requir...
|
Capacity : Cold Storage (Service On Rent): 5,000.0 Kgs./ Day•Ice Slab (120 Kgs each Ice Slab):40.0 Slab / Day |
Plant and Machinery cost: Rs 52 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 243 Lakhs |
|
Cost of Project : 24300000 |
Technical textiles are defined as textile materials and products used primarily for their technical performance and functional properties rather than...
|
Capacity : 96000 Pcs/Day |
Plant and Machinery cost: Rs 76 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 325 Lakhs |
|
Cost of Project : 32500000 |