For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
One of the fastest growing sectors of the economy of our time is the hotel industry. The hotel industry alone is a multi-billion dollar and growing en...
|
Capacity : 30 Rooms,20 Cottage,Conference Hall & Swimming Pool |
Plant and Machinery cost: Rs 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project :Rs 988 Lakhs |
|
Cost of Project : 98800000 |
Garlic is one of the important bulb crops grown and used as spice and condiment throughout India. It possesses a high nutritive value and medicinal pr...
|
Capacity : Garlic Oil :10 Kgs/ Day •Garlic Powder:2 MT /Day |
Plant and Machinery cost: Rs 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project :Rs 241 Lakhs |
|
Cost of Project : 24100000 |
Wheat is grown in most parts of the world, from near-arctic to near-equatorial latitudes. It is the most important crop among the cereals by area plan...
|
Capacity : 150 MT/Day |
Plant and Machinery cost: Rs 385 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:Rs 904 Lakhs |
|
Cost of Project : 90400000 |
Huge amounts of used lubricating oils from automotive sources are disposed of as a harmful waste into the environment. The cost and availability of oi...
|
Capacity : Reclaimed Engine Oil :5000 Litres/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project:Rs 161 Lakhs |
|
Cost of Project : 16100000 |
Refractories are necessary in the metallurgical, cement, glass, and machine tools industries where kilns and furnaces are used for value addition proc...
|
Capacity : Dolomite Bricks:100 MT/Day |
Plant and Machinery cost: Rs 1138 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project:Rs 1770 Lakhs |
|
Cost of Project : 177000000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica:10MT/Day •CaCO3 (by product):20.6MT/Day |
Plant and Machinery cost: Rs 864 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1255 Lakhs |
|
Cost of Project : 125500000 |
PVC flex is made out of PVC and fabric raw material, specially designed for solvent printing industry. It is suitable for indoor and outdoor printing...
|
Capacity : PVC Flex Banner (Frontlit/Backlit) 440 g/m2:20 MT/Day •PVC Flex Banner Vinyl 440 g/m2:5 MT/Day |
Plant and Machinery cost: Rs 550 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project :Rs 1196 Lakhs |
|
Cost of Project : 119600000 |
The Indian pharmaceutical sector has come a long way, being almost non-existent before 1970 to a prominent provider of healthcare products, meeting al...
|
Capacity : Tablets:10,000 Strips/Day •Capsules:10,000 Strips/Day |
Plant and Machinery cost: Rs 262 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project:Rs 554 Lakhs |
|
Cost of Project : 55400000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
PET, which stands for polyethylene terephthalate is a clear, strong and lightweight plastic belonging to the polyester family. It is typically called...
|
Capacity : PET Bottles/Jar 100 ml Size:16,000 Nos/Day •PET Bottles/Jar 200 ml Size:16,000 Nos/Day •PET Bottles/Jar 500 ml Size :16,000 Nos/Day •PET Bottles/Jar 1000 ml Size :16,000 Nos/Day •PET Bottles/Jar 2000 ml Size :16,000 Nos/Day |
Plant and Machinery cost: Rs 106 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project:Rs 546 Lakhs |
|
Cost of Project : 54600000 |
Apple is one of the delicious fruits. It contains vitamins, minerals, enzyme, fruit juices etc. It is very good taste to eat fresh and its juice also,...
|
Capacity : 800 Kgs/Day |
Plant and Machinery cost: Rs 336 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project:Rs 533 Lakhs |
|
Cost of Project : 53300000 |