For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conductor...
|
Capacity : • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day |
Plant and Machinery cost: Rs 580 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.36 |
|
Break Even Point (BEP): 56.24 |
TCI : Cost of Project: Rs 1141 Lakhs |
|
Cost of Project : 114100000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : TMT Bar: 125 MT/Day • Scraps: 6MT/Day |
Plant and Machinery cost: Rs 730 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 1675 Lakhs |
|
Cost of Project : 167500000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day |
Plant and Machinery cost: Rs 437 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 660 Lakhs |
|
Cost of Project : 66000000 |
Plastic (HDPE, PVC, UPVC and RCC) Pipes [NPCS/4771/22821, 22826] PVC pipes are made out of a material known as polyvinyl chloride, a durable, stro...
|
Capacity : HDPE Pipes:83.3 MT/Day, PVC Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 938 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 2124 Lakhs |
|
Cost of Project : 212400000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 83.3 MT/Day |
Plant and Machinery cost: Rs 1387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 1802 Lakhs |
|
Cost of Project : 180200000 |
SAW pipe is Submerged Arc Welded pipe. They are the pipes formed by the process called Submerged Arc welding. There can be two types of SAW pipes: 1....
|
Capacity : SAW (Spiral & Longitudinal) Pipes: 166.7 MT/Day |
Plant and Machinery cost: Rs 1942 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 3201 Lakhs |
|
Cost of Project : 320100000 |
Controlled atmosphere (CA) storage involves maintaining an atmospheric composition that is different from air composition (about 78% N2, 21% O2, and 0...
|
Capacity : Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day |
Plant and Machinery cost: Rs 365 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 1022 Lakhs |
|
Cost of Project : 102200000 |
Fatty alcohol is a generic term for a range of aliphatic hydrocarbons containing a hydroxyl group, usually in the terminal or n-position.They are natu...
|
Capacity :
|
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Artificial leather is a fabric or finish intended to substitute for leather in fields such as upholstery, clothing, and fabrics, and other uses where...
|
Capacity : PU Leather Cloth:25000 Mtrs/Day,PVC Leather Cloth: 25000 Mtrs/Day |
Plant and Machinery cost: Rs 1338 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2780 Lakhs |
|
Cost of Project : 278000000 |
Superoxide dismutases (SOD, EC 1.15.1.1) are enzymes that alternately catalyze the dismutation (or partitioning) of the superoxide (O2?) radical into...
|
Capacity : Superoxide Dismutase: 50 Kgs/Day |
Plant and Machinery cost: Rs 133 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 616 Lakhs |
|
Cost of Project : 61600000 |