For manufacturers who provide GOODS to or SERVICES - for the region, as it were, the state offers less developed land relative to any in the metros with raw material cost, available industrial area
Entrepreneurs can target sectors that align with MP’s resource base, policy thrust and market opportunity:
That said these are all based in Madhya Pradesh, and when you can bind all you will get investors from any region plus a human resource depth with plenty of minerals in the ground as well as superior Pavaha; situated Superior Having. Being a Soil of India hardly discloses few of them. With overall project economics and nothing or very little project support whose traders are interested in looking for manufacturers plus services providers across the country.
Please choose a project below related to this category.
A lubricant is a substance introduced to reduce friction between moving surfaces. It may also have the function of transporting foreign particles. The...
|
Capacity : Blended Lubricating Oil 4 KL/ Day •Greases:1 KL/Day |
Plant and Machinery cost: Rs 174 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 465 Lakhs |
|
Cost of Project : 46500000 |
Lime, magnesia, strontium, and baryts were found to have alkaline reactions and were called alkaline earths. The alkaline earth metal includes magnesi...
|
Capacity : Magnesium Sulphate (Fertiliser Grade): 60 MT/Day |
Plant and Machinery cost: Rs 195 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 861 Lakhs |
|
Cost of Project : 86100000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Edible nuts are used by mankind for food, edible oils, spices, condiments or beverages. They have been an important food source from prehistoric times...
|
Capacity : Pea Nuts:500 Kgs./Day • Cashew Nuts:500 Kgs./Day •Almonds:500 Kgs./Day •Pistachio:500 Kgs./Day |
Plant and Machinery cost: Rs 26 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project:: Rs 222 Lakhs |
|
Cost of Project : 22200000 |
Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation proces...
|
Capacity : Vodka from Grain & Potato:30 KLs/Day |
Plant and Machinery cost: Rs 3845 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project: Rs 6316 Lakhs |
|
Cost of Project : 631600000 |
Iron is probably one of the most important, being used on the largest scale of any metal. Its Production in the blast furnace is well documented. When...
|
Capacity : 3000 MT/Day |
Plant and Machinery cost: Rs 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 882 Lakhs |
|
Cost of Project : 88200000 |
Most foods contain very high percentage of water. Microorganisms thrive when there is water, spoiling the food and altering its taste. Removing water...
|
Capacity : Freeze Dried Vegetables: 2MT/Day |
Plant and Machinery cost: Rs 242 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project: Rs 743 Lakhs |
|
Cost of Project : 74300000 |
There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by which...
|
Capacity : Washing & Iron: 700.0 Pcs/ day |
Plant and Machinery cost: Rs 48 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 145 Lakhs |
|
Cost of Project : 14500000 |
The automobile is unique-technological achievement, which make the distance shorter. With this a far distance is covered in very short time. In develo...
|
Capacity : Brake Shoe (Aluminium Based):2000 NOs/Day •Brake Shoe (Mild Steel Based) : 2000 NOs/Day |
Plant and Machinery cost: Rs 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 148 Lakhs |
|
Cost of Project : 14800000 |
E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day |
Plant and Machinery cost: Rs 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
Powdered milk is a dairy product produced from cow milk. Cow milk basically contains water, fats, protein sugar and ash. About 86% to 88% of cow milk...
|
Capacity : Skimmed Milk Powder 8.00 MT/Day • Whole Milk Powder 2.67 MT/Day • Dairy Whitener 1.50 MT/Day |
Plant and Machinery cost: Rs 387 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 973 Lakhs |
|
Cost of Project : 97300000 |