Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
It is difficult to conceive the contemporary architecture without glass.Glass is a non-crystalline amorphous solid that is often transparent and has w...
|
Capacity : 384000 Sq.Mt./Annum |
Plant and Machinery cost: Rs. 280 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : Rs. 729 lakhs |
|
Cost of Project : 72900000 |
Jeans are trousers, a type of garment, typically made from denimor dungareecloth. They come in many styles and colors. Jeans are dyed in every color o...
|
Capacity : Readymede Garment (Jeans) : 120,000 Pcs/Annum |
Plant and Machinery cost: Rs. 35 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 415 lakhs |
|
Cost of Project : 41500000 |
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Milk: 1,800,000 Ltrs/Annum Curd : 360,000 Ltrs /Annum Butter Milk: 345,600 Ltrs /Annum Cheese: 36,000 kg /Annum Ghee: 14,400 |
Plant and Machinery cost: Rs. 581 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs. 2047 lakhs |
|
Cost of Project : 204700000 |
Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from rail...
|
Capacity : Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500 MT/Annum Laminated Aluminium Foil Insulation Grade Aluminium Foil: 1,500 MT/Annum |
Plant and Machinery cost: Rs. 1340 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : Rs. 2717 lakhs |
|
Cost of Project : 271700000 |
Thermocol has a particular characteristic: it gives the hand a sensation of velvety softness not experienced in contact with traditional types of plas...
|
Capacity : Thermocol Cups: 108,000 Th.Pcs/Annum Thermocol Glasses: 108,000 Th.Pcs/Annum Thermocol Plates: 21,600Th.Pcs/Annum |
Plant and Machinery cost: Rs. 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs. 211 lakhs |
|
Cost of Project : 21100000 |
A diaper or nappy is a kind of underwear that allows one to defecate or urinate in a discreet manner. When diapers become soiled, they require changin...
|
Capacity : Baby Diapers : 3000000 Pkts/annum Adult Diapers : 1500000 Pkts/annum Sanitary Napkins : 4500000 Pkts/annum |
Plant and Machinery cost: 1029 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: 1657 lakhs |
|
Cost of Project : 165700000 |
MIG Wire is Copper coated strong wire. MIG wires are applied to weld numerous ferrous and non-ferrous materials and give sound results Solid copper co...
|
Capacity : MIG Welding Wire : 12000 MT/annum |
Plant and Machinery cost: 921 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 2052 lakhs |
|
Cost of Project : 205200000 |
It is difficult to conceive the contemporary architecture without glass. Glass is a non-crystalline amorphous solid that is often transparent and has...
|
Capacity : Glass Sheet: 1000500 Sq.Mt/annum |
Plant and Machinery cost: 919 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 14.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 1742 lakhs |
|
Cost of Project : 174200000 |
Control of mosquitoes is something of utmost importance in the present day with rising number of mosquito borne illnesses. Mosquitoes need to be exter...
|
Capacity : Mosquito Repellent Liquidator, Vaporiser 50 ml size PET Bottle: 1200000 Nos/annum |
Plant and Machinery cost: 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 78 lakhs |
|
Cost of Project : 78000000 |
Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...
|
Capacity : Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum |
Plant and Machinery cost: 405 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 646 lakhs |
|
Cost of Project : 64600000 |
Bakery is a traditional activity and occupies an important place in food processing industry. A bakery is an establishment that produces and sells flo...
|
Capacity : Bread (400 gmsPkt): 36000 kg/annum Buns (300 gmsPkt): 30000 kg/annum Cookies: 30000 kg/annum Rusk: 18000 kg/annum |
Plant and Machinery cost: 9 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 50 lakhs |
|
Cost of Project : 5000000 |
Wine is an alcoholic beverage made from the fermentation of grape juice. The natural chemical balance of grapes is such that they can ferment without...
|
Capacity : 9,00,000 Ltrs./ Annum |
Plant and Machinery cost: 237 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project :555 Lakhs |
|
Cost of Project : 55500000 |