Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...
|
Capacity : 2,400,000 Kg/annum |
Plant and Machinery cost: Rs 126 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 561 lakhs |
|
Cost of Project : 56100000 |
Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-use of nutrient water supplie...
|
Capacity : Tomatoes: 500 MT/annum Peas: 45MT/annum Cucumber: 70MT/annum |
Plant and Machinery cost: Rs 22 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs188 lakhs |
|
Cost of Project : 18800000 |
Activated carbon in any form of carbon shows high absorptivity for gases, vapours and colloidal solids in either the gas ion or liquid phase. It is av...
|
Capacity : Activated Carbon : 600 MT/annum |
Plant and Machinery cost: Rs 81 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : Rs 245 lakhs |
|
Cost of Project : 24500000 |
An aerodrome or airdrome is a location from which aircraft flight operations take place, regardless of whether they involve air cargo, passengers, or...
|
Capacity : Flight Landing Charges: 4,320 Nos./annum Annually Lease Charages of Shops (20 Nos.): 12 Nos./annum Annually Lease Charges of Parking: 12 Nos./annum Annually Lease Charges of Parking:12 Nos./annum |
Plant and Machinery cost: Rs 442 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : Cost of Project: Rs 6777 lakhs |
|
Cost of Project : 677700000 |
Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing concern of the ecological ba...
|
Capacity : 120,000 Pcs/annum |
Plant and Machinery cost: Rs 1509 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1970 lakhs |
|
Cost of Project : 197000000 |
The objective of formulating and compounding sterile preparations is to provide adosage form of a labeled drug, in the stated potency that is safe to...
|
Capacity : Ampoules 5 ml Size: 300,000 Th. Nos./annum Ampoules 10 ml Size: 260,000 Th. Nos./annum Ampoules 20 ml Size: 120,000 Th. Nos./annum |
Plant and Machinery cost: Rs 607 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 917 lakhs |
|
Cost of Project : 91700000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |
Wire nail is very well known item, as it is very common product, which is normally used in daily life. It is used for fastening purpose. Its use is so...
|
Capacity : Wire Nail: 369,600 Kgs/annum, Wire Scrap: 34,800 Kgs/annum |
Plant and Machinery cost: Rs 11 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 59 lakhs |
|
Cost of Project : 5900000 |
The cashew nut is a popular dessert nut, eaten out of hand, with other mixed nuts and used in baking and confections. Sixty percent of cashews are con...
|
Capacity : Cashew Nut (W320 Grade) Domestic: 218MT/annum Cashew Nut (W320 Grade) Export: 327MT/annum Cashew Nut (W240 Grade) Domestic: 145.2 MT/annum Cashew Nut (W240 Grade) Export: 217.80 MT/annum Cashew Nut (LWP Grade) Domestic: 148.40 MT/annum Cashew Nut (LWP Gra |
Plant and Machinery cost: Rs 2358 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: Rs 4477 lakhs |
|
Cost of Project : 447700000 |
Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, although many can also be used...
|
Capacity : Chole Masala: 400,000 Kgs/annum, Sambhar Masala: 400,000 Kgs/annum, Garm Masala: 400,000 Kgs/annum, Chat Masala: 400,000 Kgs/annum, Meat Masala: 400,000 Kgs/annum, Curry Powder: 400,000 Kgs/annum |
Plant and Machinery cost: Rs 91 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1004 lakhs |
|
Cost of Project : 100400000 |
Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when wet and provides both water...
|
Capacity : 3,600,000 Pcs/annum |
Plant and Machinery cost: Rs 69 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 270 lakh |
|
Cost of Project : 27000000 |
Engineering education is the activity of teaching knowledge and principles related to the professional practice of engineering. It includes the initia...
|
Capacity : Aeronautical Engineering: 60 students/annum Mechanical Engineering: 60 students/annum Civil Engineering: 60 students/annum Aircraft Maintenance Engineering: 60 students/annum Air Hostage Training Course (6 Month Diploma):120 students/annum |
Plant and Machinery cost: Rs 623 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 93.00 |
TCI : Cost of Project: Rs 3336 lakhs |
|
Cost of Project : 333600000 |