Entrepreneurs should prioritise sectors that match resource availability, employ local labour, and add value close to source:
1. Agricultural processing and packaged foods
2. Bamboo processing and value-added products
3. Ecotourism, private accommodation and adventure services
4. Like, Herbal products, ayush , ayush and nutrients
5. Freshwater aquaculture and fishery processing
6. Renewable energy (small water and solar energy)
Meghalaya offers compelling high-impact opportunities for businesses that respect environmental boundaries while delivering value – particularly in agro-processing, bamboo value chains, eco-tourism, medicinal herbs/nutrients, small hydro and solar, handloom design and cold chain logistics. Cluster-based, community-inclusive and environmentally conscious projects bring strong social , social and economic returns: higher farmer incomes, job creation and sustainable regional exports.
Please choose a project below related to this category.
Dairy farming has been part of agriculture for thousands of years, but historically, it was usually done on a small scale on mixed farms.But today, In...
|
Capacity : Cow Milk (Ltrs.): 2,268,000 units/annum Manure (MT):2,160 units/annum Calf (Nos.) : 252 units/annum |
Plant and Machinery cost: Rs 144 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs 727 lakhs |
|
Cost of Project : 72700000 |
Calcium silicate board is an asbestos-free thermal insulation product that can withstand continuous high operating temperatures. It is a light weight,...
|
Capacity : 50,000Sq.MT/annum |
Plant and Machinery cost: Rs 74 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project : Rs 316 lakhs |
|
Cost of Project : 31600000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : 150,000CBM/annum |
Plant and Machinery cost: Rs 5624 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : Rs 8236lakhs |
|
Cost of Project : 8236100000 |
LPG Cylinder is an essential item for filling liquefied petroleum gas used for domestic and industrial purpose. The body of LPG cylinder is deep drawn...
|
Capacity : LPG Cylinders (14.20 Kgs Size):150,000Nos/annum LPG Cylinders (19 Kgs Size):150,000Nos/annum |
Plant and Machinery cost: Rs 355 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 943 lakhs |
|
Cost of Project : 94300000 |
Vitamin C is a physiological antioxidant of major importance for protection against diseases and degenerative processes caused by oxidative stress. Vi...
|
Capacity : 2400 MT/annum |
Plant and Machinery cost: Rs 123 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : Rs 563 lakhs |
|
Cost of Project : 56300000 |
The materials now available for packaging are paper and paper products, metal containers and foils, glass, plastics-rigid and flexible, cellulose film...
|
Capacity : 1,050,000kgs/annum |
Plant and Machinery cost: Rs 46 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : Rs 229lakhs |
|
Cost of Project : 229100000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : Detergent Cake:180,000Kgs/annum Detergent Powder:180,000Kgs/annum |
Plant and Machinery cost: Rs 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : Rs 36 lakhs |
|
Cost of Project : 3600000 |
Pharmaceutical formulation, in pharmaceutics, is the process in which different chemical substances, including the active drug, are combined to produc...
|
Capacity : Betalactam Cephalexin Tablets 400 mg: 3,000,000 Nos./annum Betalactam Cephalexin Capsules 400 mg:3,000,000 Nos./annum Betalactam Cephalexin Syrup 50 ml:1,500,000 Nos./annum Betalactam Cephalexin Dry Syrup 30 ml:1,500,000 Nos./annum Betalactam Cephalexin S |
Plant and Machinery cost: Rs 103 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 1452 lakhs |
|
Cost of Project : 145200000 |
Intravenous fluids are fluids which are intended to be administered to a patient intravenously, directly through the circulatory system. These fluids...
|
Capacity : 1,44,00,000 bottles/annum |
Plant and Machinery cost: Rs 462 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs 1362lakhs |
|
Cost of Project : 136200000 |
Paddy is the most important and extensively grown food crop in the World. Rice grain (Oryza sativa) along with hulls/husk is known as paddy. Paddy see...
|
Capacity : Rice:1,170,000 MT/annum Rice Bran Oil:50,000 MT/annum Deoiled Rice Bran Cake:187,500 MT/annum Salable Power:130,500 Th. Units/annum |
Plant and Machinery cost: Rs 238 crore |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 565 crore |
|
Cost of Project : 5650000000 |
Soft gelatin (also called softgel or soft elastic) capsules consist of one piece hermetically-sealed soft shells. Soft gelatin capsules are prepared b...
|
Capacity : 1,800,000 Th.Nos./annum |
Plant and Machinery cost: Rs 261 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 478lakhs |
|
Cost of Project : 478100000 |
Fly Ash brick is a product of basic cement clinker materials i.e. fly ash, stone dust/sand, lime, gypsum and bonding agent. The mix is so ideally work...
|
Capacity : Fly Ash Bricks: 24,000,000 Pcs/annum |
Plant and Machinery cost: Rs 152 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs 336lakhs |
|
Cost of Project : 33600000 |